* **AMEC:** Detailed engineering and procurement the existing Judy platform and the hook-up and commissioning of their new Jasmine facilities  | * **AMEC:** Detailed engineering and procurement the existing Judy platform and the hook-up and commissioning of their new Jasmine facilities  | ||
* **Rosetti Marino:**    | * **Rosetti Marino:**    | ||
| − | + | ** Procurement, Construction and Commissioning of Topsides for the Jasmine platform  | |
| − | + | ** Construction engineering, procurement, fabrication, load-out and sea-fastening of JASMINE WHP, JLQ & JRP substructures  | |
* **IKM Testing:** Pressure Tests, Bolt Tensioning & Torquing, Hot Oil Flushing, Cleaning, Video Inspection, Test Engineering, Drying & N2 Purging  | * **IKM Testing:** Pressure Tests, Bolt Tensioning & Torquing, Hot Oil Flushing, Cleaning, Video Inspection, Test Engineering, Drying & N2 Purging  | ||
* **Saipem:** Wellhead, accomodation and process platforms  | * **Saipem:** Wellhead, accomodation and process platforms  | ||
* **FoundOcean:** Grouting for Jasmine Living Quarters & WHP  | * **FoundOcean:** Grouting for Jasmine Living Quarters & WHP  | ||
| − | * **KWSubsea:** Pipeline Concept Engineering Services    | + | * **KWSubsea:** Pipeline Concept Engineering Services  | 
=== History ===  | === History ===  | ||
Revision as of 22:41, 30 November 2021
Summary Information
- Operator: ConocoPhillips
 - Country: UK
 - Location: blocks P011 and P0032 30/7a, Central North Sea
 - Production start: 2013
 - Partners: ConocoPhillips - 36.5, BG Group - 30.5%, ENI - 33.0%
 - Type: Gas And Condensate
 - Estimated Reserves: recoverable reserves are estimated at around 170 mmboe
 - Production Volume:
 
Description
- Jasmine is a high pressure, high temperature (HP/HT) gas condensate field located in Blocks 30/6 and 30/7 of the UK central North Sea approximately 255 kilometres south east of Aberdeen.
 - It is part of the J-Block first round licence awarded in 1964 and is the fourth development in the J-Area after Judy, Joanne and Jade.
 - The development consisting of a 24-slot wellhead platform (JWHP) with bridge-linked accommodation, came onstream in 2013. The JWHP is tied back to the Judy platform to the east via an 8-kilometre pipeline and a riser platform at Judy. Production from Jasmine is processed and exported through Judy.
 - From Judy, gas is trasported via the CATS Central Area Transmission System Gas Pipeline to the Teesside Gas Processing Plant TGPP
 
Contractors
- **Halliburton:** Directional drilling, logging-while-drilling (LWD) and surface data logging (SDL) services
 - **Dragados Offshore:** Constructability analysis, construction engineering, partial purchases, construction, commissioning, load out and sea fastening of two decks
 - **WorleyParsons:** Detailed engineering for three platforms, interconnecting bridges, pipe-in-pipe risers and spools along with the functional design and specification for the subsea pipeline, subsea isolation valves, power/communications cable and umbilicals
 - **Subsea 7:** Engineering, procurement, fabrication, installation and commissioning of two approximately 4km pipeline bundle systems and associated pipe-in-pipe spools
 - **AMEC:** Detailed engineering and procurement the existing Judy platform and the hook-up and commissioning of their new Jasmine facilities
 - **Rosetti Marino:**
- Procurement, Construction and Commissioning of Topsides for the Jasmine platform
 - Construction engineering, procurement, fabrication, load-out and sea-fastening of JASMINE WHP, JLQ & JRP substructures
 
 - **IKM Testing:** Pressure Tests, Bolt Tensioning & Torquing, Hot Oil Flushing, Cleaning, Video Inspection, Test Engineering, Drying & N2 Purging
 - **Saipem:** Wellhead, accomodation and process platforms
 - **FoundOcean:** Grouting for Jasmine Living Quarters & WHP
 - **KWSubsea:** Pipeline Concept Engineering Services
 
History
- 1964 - Licence awarded for the block
 - 2006 - Jasmine Gas And Condensate Field discovered
 - 2010 - WorleyParsons awarded Detailed engineering contract
 - 2010 - Halliburton awarded drilling contract
 - 2010 - Dragados Offshore awarded deck contract
 - 2013 - First gas produced
 - 2017 - Chrysaor acquired Shell's stake in the field.
 
Geology
Links
- Central North Sea, ConocoPhillips
 - List Of Oil and Gas Production Platforms In The UK
 - Saipem Fixed Offshore Production Facilities Project References
 - FoundOcean Subsea References
 - KWSubsea Subsea References
 - Rosetti Marino Platform References
 - BG Group announce substantial North Sea discovery
 - Subsea 7 Confirms Contract for ConocoPhillips Jasmine Discovery in the North Sea
 - IKM Testing Spain awarded a new contract
 - Halliburton Wins Contract for Jasmine
 - Award by ConocoPhillips for Jasmine Area Development
 - AMEC awarded Judy and Jasmine contract North Sea
 - Conocophilips Awards A New Contract To Dragados Offshore
 - First gas production from UK Jasmine field
 - Shell to sell package of UK North Sea assets to Chrysaor for up to $3.8bn