Difference between revisions of "Atyrau Refinery"
Abarrelfull (talk | contribs) (Created page with "Summary Information Ownership: KazMunaiGas Website: http://lang.kmg.kz/page.php?lang=2 Location: Atyrau, Western Kazakhstan Capacity: 5.0 million tons/annum & 104,000 bbl/day...") |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
Ownership: KazMunaiGas | Ownership: KazMunaiGas | ||
Website: http://lang.kmg.kz/page.php?lang=2 | Website: http://lang.kmg.kz/page.php?lang=2 | ||
Line 6: | Line 6: | ||
Nelson Complexity: | Nelson Complexity: | ||
Refining Depth: 56% | Refining Depth: 56% | ||
− | Refining Units | + | === Refining Units === |
Atmospheric distillation units | Atmospheric distillation units | ||
Vacuum distillation units | Vacuum distillation units | ||
Line 12: | Line 12: | ||
Catalytic reforming | Catalytic reforming | ||
Delayed coker | Delayed coker | ||
− | Terminal Capacity | + | === Terminal Capacity === |
Crude Oil: | Crude Oil: | ||
Refined Products: | Refined Products: | ||
− | Crude Supply | + | === Crude Supply === |
* Atyrau, has been processing crude oil of Kazakhstan exclusively. It is located close to the richest oil fields in the country, such as Tengiz Oil Field, Zhanazhol Oil Field and Uzen Oil Field | * Atyrau, has been processing crude oil of Kazakhstan exclusively. It is located close to the richest oil fields in the country, such as Tengiz Oil Field, Zhanazhol Oil Field and Uzen Oil Field | ||
− | Products Produced | + | === Products Produced === |
motor gasoline, diesel, vacuum gasoil, jet fuel, different sorts of petroleum coke, LPG and fuel oil | motor gasoline, diesel, vacuum gasoil, jet fuel, different sorts of petroleum coke, LPG and fuel oil | ||
− | + | === Projects === | |
For details see Atyrau Refinery Upgrade Project | For details see Atyrau Refinery Upgrade Project | ||
There are three projects at the refinery | There are three projects at the refinery | ||
Line 25: | Line 25: | ||
Construction of Aromatics production plant | Construction of Aromatics production plant | ||
Oil deep conversion complex | Oil deep conversion complex | ||
− | Other Information | + | === Other Information === |
- | - | ||
− | History | + | === History === |
1945 - The Soviets built the Atyrau refinery with a capacity 800,000 tones per year | 1945 - The Soviets built the Atyrau refinery with a capacity 800,000 tones per year | ||
2005 - Modernisation by JGC Completed | 2005 - Modernisation by JGC Completed | ||
2007 - Completion of Gasoline Hydrotreating Unit, Diesel Fuel Hydrotreating Unit and Diesel Fuel Dewaxing Unit, Isomerization Unit, Sulphur Recovery Unit, Hydrogen Generating Unit | 2007 - Completion of Gasoline Hydrotreating Unit, Diesel Fuel Hydrotreating Unit and Diesel Fuel Dewaxing Unit, Isomerization Unit, Sulphur Recovery Unit, Hydrogen Generating Unit | ||
2015 - First paraxylene produced | 2015 - First paraxylene produced | ||
− | + | === Links === | |
Refinery Webpage | Refinery Webpage | ||
Refining Sector in Kazakhstan | Refining Sector in Kazakhstan |
Revision as of 18:55, 4 April 2020
Contents
Summary Information
Ownership: KazMunaiGas Website: http://lang.kmg.kz/page.php?lang=2 Location: Atyrau, Western Kazakhstan Capacity: 5.0 million tons/annum & 104,000 bbl/day Nelson Complexity: Refining Depth: 56%
Refining Units
Atmospheric distillation units Vacuum distillation units Naphtha desulfurization units Catalytic reforming Delayed coker
Terminal Capacity
Crude Oil: Refined Products:
Crude Supply
- Atyrau, has been processing crude oil of Kazakhstan exclusively. It is located close to the richest oil fields in the country, such as Tengiz Oil Field, Zhanazhol Oil Field and Uzen Oil Field
Products Produced
motor gasoline, diesel, vacuum gasoil, jet fuel, different sorts of petroleum coke, LPG and fuel oil
Projects
For details see Atyrau Refinery Upgrade Project There are three projects at the refinery Reconstruction of vacuum unit ELOU-ABT and a delayed Coker unit Construction of Aromatics production plant Oil deep conversion complex
Other Information
-
History
1945 - The Soviets built the Atyrau refinery with a capacity 800,000 tones per year 2005 - Modernisation by JGC Completed 2007 - Completion of Gasoline Hydrotreating Unit, Diesel Fuel Hydrotreating Unit and Diesel Fuel Dewaxing Unit, Isomerization Unit, Sulphur Recovery Unit, Hydrogen Generating Unit 2015 - First paraxylene produced
Links
Refinery Webpage Refining Sector in Kazakhstan Kazakhs Seek Sinopec, Marubeni Cash for Atyrau Refinery Upgrade EPC Contract Signed for Atyrau Oil Refinery Modernization Project, Kazakhstan Orghim Refinery References JGC Refinery References Rominserv, a contract with a value exceeding USD 27 million USD for modernizing Atyrau Kazakhstan refinery First paraxylene produced at Atyrau Refinery