Difference between revisions of "Coral North LNG Project"

From A Barrel Full
Jump to navigation Jump to search
Line 4: Line 4:
 
* Website:  
 
* Website:  
 
* Location:   
 
* Location:   
−
* Capacity: 3.4 million tons/annum  
+
* Capacity: 3.6 million tons/annum  
 
* Status: Under Construction
 
* Status: Under Construction
  
 
=== Brief Description ===
 
=== Brief Description ===
−
* -
+
* A floating LNG terminal with capacity of 3/6 mtpa
  
 
=== Technical Details ===
 
=== Technical Details ===
 
* Storage capacity:
 
* Storage capacity:
−
* Constructor:
+
* Constructor:  
 +
** '''JGC France and Technip Energies''', Engineering and procurement of the FLNG topside facilities as well as overall project management.
 +
** '''Samsung Heavy Industries engineering''', procurement and construction of the FLNG hull and the fabrication of the topside modules.
 
* Licensor:
 
* Licensor:
  
Line 24: Line 26:
 
=== History ===
 
=== History ===
 
* 2026 - Eni announces the Hull Launch of the Coral North FLNG
 
* 2026 - Eni announces the Hull Launch of the Coral North FLNG
 +
* 2026 - EPCIC Contract awarded
  
 
=== Other Information ===
 
=== Other Information ===
Line 30: Line 33:
 
=== Links ===
 
=== Links ===
 
# [https://abarrelfull.blogspot.com/2026/09/eni-announces-hull-launch-of-coral.html Eni announces the Hull Launch of the Coral North FLNG]
 
# [https://abarrelfull.blogspot.com/2026/09/eni-announces-hull-launch-of-coral.html Eni announces the Hull Launch of the Coral North FLNG]
 +
# [https://www.abarrelfull.co.uk/Coral_North_LNG_Project JGC Joint Venture Awarded EPCIC Contract for Coral North Project in Mozambique]
  
 
[[category:LNG]]
 
[[category:LNG]]
 
[[category:country]]
 
[[category:country]]
 
[[category:company]]
 
[[category:company]]

Revision as of 17:00, 23 September 2026

Summary Information

  • Ownership: Eni, China National Petroleum Corporation (CNPC), ENH, KOGAS and XRG
  • Website:
  • Location:
  • Capacity: 3.6 million tons/annum
  • Status: Under Construction

Brief Description

  • A floating LNG terminal with capacity of 3/6 mtpa

Technical Details

  • Storage capacity:
  • Constructor:
    • JGC France and Technip Energies, Engineering and procurement of the FLNG topside facilities as well as overall project management.
    • Samsung Heavy Industries engineering, procurement and construction of the FLNG hull and the fabrication of the topside modules.
  • Licensor:

Ongoing Projects/Project Status

  • Commissioning is expected in 2028

Suppliers / Customers

History

  • 2026 - Eni announces the Hull Launch of the Coral North FLNG
  • 2026 - EPCIC Contract awarded

Other Information

  • -

Links

  1. Eni announces the Hull Launch of the Coral North FLNG
  2. JGC Joint Venture Awarded EPCIC Contract for Coral North Project in Mozambique