Difference between revisions of "Coral North LNG Project"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
| Line 4: | Line 4: | ||
* Website: | * Website: | ||
* Location: | * Location: | ||
| − | * Capacity: 3. | + | * Capacity: 3.6 million tons/annum |
* Status: Under Construction | * Status: Under Construction | ||
=== Brief Description === | === Brief Description === | ||
| − | * | + | * A floating LNG terminal with capacity of 3/6 mtpa |
=== Technical Details === | === Technical Details === | ||
* Storage capacity: | * Storage capacity: | ||
| − | * Constructor: | + | * Constructor: |
| + | ** '''JGC France and Technip Energies''', Engineering and procurement of the FLNG topside facilities as well as overall project management. | ||
| + | ** '''Samsung Heavy Industries engineering''', procurement and construction of the FLNG hull and the fabrication of the topside modules. | ||
* Licensor: | * Licensor: | ||
| Line 24: | Line 26: | ||
=== History === | === History === | ||
* 2026 - Eni announces the Hull Launch of the Coral North FLNG | * 2026 - Eni announces the Hull Launch of the Coral North FLNG | ||
| + | * 2026 - EPCIC Contract awarded | ||
=== Other Information === | === Other Information === | ||
| Line 30: | Line 33: | ||
=== Links === | === Links === | ||
# [https://abarrelfull.blogspot.com/2026/09/eni-announces-hull-launch-of-coral.html Eni announces the Hull Launch of the Coral North FLNG] | # [https://abarrelfull.blogspot.com/2026/09/eni-announces-hull-launch-of-coral.html Eni announces the Hull Launch of the Coral North FLNG] | ||
| + | # [https://www.abarrelfull.co.uk/Coral_North_LNG_Project JGC Joint Venture Awarded EPCIC Contract for Coral North Project in Mozambique] | ||
[[category:LNG]] | [[category:LNG]] | ||
[[category:country]] | [[category:country]] | ||
[[category:company]] | [[category:company]] | ||
Revision as of 17:00, 23 September 2026
Contents
Summary Information
- Ownership: Eni, China National Petroleum Corporation (CNPC), ENH, KOGAS and XRG
- Website:
- Location:
- Capacity: 3.6 million tons/annum
- Status: Under Construction
Brief Description
- A floating LNG terminal with capacity of 3/6 mtpa
Technical Details
- Storage capacity:
- Constructor:
- JGC France and Technip Energies, Engineering and procurement of the FLNG topside facilities as well as overall project management.
- Samsung Heavy Industries engineering, procurement and construction of the FLNG hull and the fabrication of the topside modules.
- Licensor:
Ongoing Projects/Project Status
- Commissioning is expected in 2028
Suppliers / Customers
- Suppliers: Gas is supplied by the Coral Gas Field
- Customers:
History
- 2026 - Eni announces the Hull Launch of the Coral North FLNG
- 2026 - EPCIC Contract awarded
Other Information
- -