Difference between revisions of "P-53 FPSO"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (→Links) |
Abarrelfull (talk | contribs) |
||
| Line 15: | Line 15: | ||
* The platform weighs some 12,000 tons, it is more than 73 m tall, its moonpool (an opening in the middle of the platform used to maneuver heavy duty equipment used in the sea) is 25 m in diameter, and the platform’s deck is 35 m in diameter, being able to operate with up to 75 flexible risers | * The platform weighs some 12,000 tons, it is more than 73 m tall, its moonpool (an opening in the middle of the platform used to maneuver heavy duty equipment used in the sea) is 25 m in diameter, and the platform’s deck is 35 m in diameter, being able to operate with up to 75 flexible risers | ||
| − | + | === Contractors === | |
* | * | ||
| − | + | === Status === | |
* In operation | * In operation | ||
| − | + | === History === | |
* 2008 - Vessel achieves first oil | * 2008 - Vessel achieves first oil | ||
| − | + | === Other Information === | |
* - | * - | ||
Revision as of 14:24, 18 July 2024
Contents
Summary Information
- Name: P-53 FPSO
- Field: Marlim Leste Oil Field
- Country: Brazil
- Ownership: Petrobras
- Website:
- Field Operated By: Petrobras
- Capacity: bpd
- Year of Completion: 2008
Brief Description
- Built from the conversion of an oil tanker called Settebello, the P-53 FPSO has total production capacity of 180,000 barrels per day of heavy oil, 20º API, and compressing capacity up to 6 million cubic meters/day of natural gas.
- The platform weighs some 12,000 tons, it is more than 73 m tall, its moonpool (an opening in the middle of the platform used to maneuver heavy duty equipment used in the sea) is 25 m in diameter, and the platform’s deck is 35 m in diameter, being able to operate with up to 75 flexible risers
Contractors
Status
- In operation
History
- 2008 - Vessel achieves first oil
Other Information
- -