* **The field which is now known as the [[Alma Oil Field]]** was previously called [[Argyll Oil Field]] | * **The field which is now known as the [[Alma Oil Field]]** was previously called [[Argyll Oil Field]] | ||
− | + | === Summary Information === | |
* Operator: EnQuest | * Operator: EnQuest | ||
* Country: UK | * Country: UK | ||
Line 11: | Line 11: | ||
* Production Volume: | * Production Volume: | ||
− | + | === Description === | |
* The field is to be operated together with the [[Galia Oil Field]] using the [[Enquest Producer FPSO]] | * The field is to be operated together with the [[Galia Oil Field]] using the [[Enquest Producer FPSO]] | ||
− | + | === Contractors === | |
* **Technip:** | * **Technip:** | ||
** Installation of two 10” production flexible flowlines, one 8” water injection flexible flowline and one further 8” production flexible flowline, | ** Installation of two 10” production flexible flowlines, one 8” water injection flexible flowline and one further 8” production flexible flowline, | ||
Line 24: | Line 24: | ||
* **Jumbo:** FPSO mooring, installation and hook-up contract | * **Jumbo:** FPSO mooring, installation and hook-up contract | ||
− | + | === History === | |
* 1992 - Decommissioning was approved for the Argyll Oil Field | * 1992 - Decommissioning was approved for the Argyll Oil Field | ||
* 2012 - Field development approval given | * 2012 - Field development approval given | ||
Line 30: | Line 30: | ||
* 2012 - Jumbo awarded FPSO mooring, installation and hook-up contract | * 2012 - Jumbo awarded FPSO mooring, installation and hook-up contract | ||
− | + | === Geology === | |
* | * | ||
− | + | === Links === | |
+ | # [[UK Oil and Gas Field Approved Decommissioning]] | ||
# [http://killajoules.wikidot.com/blog:2690 Technip awarded contract for EnQuest’s Alma and Galia development in UK North Sea] | # [http://killajoules.wikidot.com/blog:2690 Technip awarded contract for EnQuest’s Alma and Galia development in UK North Sea] | ||
# [http://killajoules.wikidot.com/blog:3508 Jumbo main installation contractor for EnQuest Producer] | # [http://killajoules.wikidot.com/blog:3508 Jumbo main installation contractor for EnQuest Producer] |
Latest revision as of 10:05, 28 June 2024
- **The field which is now known as the Alma Oil Field** was previously called Argyll Oil Field
Summary Information
- Operator: EnQuest
- Country: UK
- Location: North Sea
- Production start:
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
Description
- The field is to be operated together with the Galia Oil Field using the Enquest Producer FPSO
Contractors
- **Technip:**
- Installation of two 10” production flexible flowlines, one 8” water injection flexible flowline and one further 8” production flexible flowline,
- Installation of three 8” flexible risers,
- Installation of two production control umbilicals/risers,
- Installation of four power cables and associated dynamic risers,
- Procurement, fabrication and installation of a 175 ton manifold structure,
- Associated trenching operations, tie-ins, testing and commissioning.
- **Jumbo:** FPSO mooring, installation and hook-up contract
History
- 1992 - Decommissioning was approved for the Argyll Oil Field
- 2012 - Field development approval given
- 2012 - Technip awarded subsea contract
- 2012 - Jumbo awarded FPSO mooring, installation and hook-up contract