* The development will utilise a semi-submersible Floating Production Unit (FPU)
 
* The development will utilise a semi-submersible Floating Production Unit (FPU)
 
* Vito is expected to reach peak production of approximately 100,000 barrels of oil equivalent (boe) per day
 
* Vito is expected to reach peak production of approximately 100,000 barrels of oil equivalent (boe) per day
* The crude will be transported on the [[Mars Crude Oil Pipeline]], to which it is connected by the 51-mile, 18 inch, 120,000 bpd capacity Vito Pipeline
+
* The crude is transported on the [[Mars Crude Oil Pipeline]], to which it is connected by the 51-mile, 18 inch, 120,000 bpd capacity Vito Pipeline
 +
* A waterflood project is under way and will be completed in 2027
  
 
=== Contractors ===
 
=== Contractors ===
Line 30: Line 31:
 
* 2018 - Final investment decision
 
* 2018 - Final investment decision
 
* 2023 - First oil produced
 
* 2023 - First oil produced
 +
* 2024 - Shell took the Final Investment Decision (FID) on a ‘waterflood’ project
  
 
=== Geology ===
 
=== Geology ===
Line 46: Line 48:
 
# [http://killajoules.wikidot.com/archive:export-pipelines-award-demonstrates-subsea-7s-strong Export pipelines award demonstrates Subsea 7’s strong track record for cost-effective execution in the US Gulf of Mexico.]
 
# [http://killajoules.wikidot.com/archive:export-pipelines-award-demonstrates-subsea-7s-strong Export pipelines award demonstrates Subsea 7’s strong track record for cost-effective execution in the US Gulf of Mexico.]
 
# [https://abarrelfull.blogspot.com/2023/11/shell-starts-production-at-vito-in-us.html Shell starts production at Vito in US Gulf of Mexico]
 
# [https://abarrelfull.blogspot.com/2023/11/shell-starts-production-at-vito-in-us.html Shell starts production at Vito in US Gulf of Mexico]
 +
# [https://a-barrel-full.blogspot.com/2024/08/shell-invests-in-water-injection-at.html Shell invests in water injection at Gulf of Mexico field]
  
 
[[category:Field]]
 
[[category:Field]]

Latest revision as of 15:01, 15 August 2024

Summary Information

  • Operator: Shell
  • Country: USA
  • Location: Mississippi Canyon Blocks 940 & 984, Gulf of Mexico
  • Production start: 2023
  • Partners: Shell Offshore Inc. (63.11% operator) and Equinor (36.89%)
  • Type: Oil & Gas
  • Estimated Reserves:
  • Production Volume: Expected 100,000 bpd at peak

Description

  • Located over four blocks in the Mississippi Canyon area of the Gulf of Mexico, the Vito development will consist of eight subsea wells with deep (18,000 feet) in-well gas lift.
  • The development will utilise a semi-submersible Floating Production Unit (FPU)
  • Vito is expected to reach peak production of approximately 100,000 barrels of oil equivalent (boe) per day
  • The crude is transported on the Mars Crude Oil Pipeline, to which it is connected by the 51-mile, 18 inch, 120,000 bpd capacity Vito Pipeline
  • A waterflood project is under way and will be completed in 2027

Contractors

  • Jacobs Engineering: Front-end engineering and design (FEED) package and detailed engineering for the Vito host platform topsides
  • Sembcorp Marine: Construct and integrate the hull, topsides and living quarters of the Vito semi-submersible Floating Production Unit (FPU)
  • Subsea 7:
    • Project management, engineering, procurement, installation and pull-in of two 12” infield production flowlines with 10” steel catenary risers (SCRs), one gas lift flowline and SCR, and the umbilical system.
    • Transportation and installation of 50 miles of 18-inch oil export pipelines, 17 miles of 10-inch Gas Export pipelines and three miles of associated Steel Catenary Risers and pipeline end terminations
  • Oceaneering: electro-hydraulic steel tube control umbilical, and flying leads, totaling approximately nine kilometers (5.6 miles) in length

History

  • 2009 - Vito Oil Field discovered
  • 2010 - Appraisal wells drilled
  • 2014 - Statoil acquired Anadarko's share
  • 2016 - Jacobs awarded FEED contract
  • 2018 - Final investment decision
  • 2023 - First oil produced
  • 2024 - Shell took the Final Investment Decision (FID) on a ‘waterflood’ project

Geology

  • 600 net feet of high-quality oil pay in thick subsalt Miocene sands

Links

  1. Gulf Of Mexico Deepwater Natural Gas And Oil Qualified Fields
  2. EIA Liquids Pipeline Projects 2021-2025
  3. Anadarko Announces Its Fourth Deepwater Gulf of Mexico Discovery in 2009
  4. Anadarko Provides Deepwater Update
  5. Jacobs Wins Contract from Shell for Gulf of Mexico Platform
  6. Sembcorp Marine Secures Contract for the Construction and Integration of Vito FPU’s Hull, Topsides and Living Quarters
  7. Subsea 7 awarded contract offshore Gulf of Mexico
  8. Oceaneering Announces Subsea 7 Umbilical Contract for Shell's Vito Development in the Gulf of Mexico
  9. Shell invests in the Vito development in the Gulf of Mexico
  10. Export pipelines award demonstrates Subsea 7’s strong track record for cost-effective execution in the US Gulf of Mexico.
  11. Shell starts production at Vito in US Gulf of Mexico
  12. Shell invests in water injection at Gulf of Mexico field