Difference between revisions of "Sanga-Sanga PSC Gas and Condensate Fields"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
* Operator: VICO (BP) | * Operator: VICO (BP) | ||
* Country: Indonesia | * Country: Indonesia | ||
Line 9: | Line 9: | ||
* Production Volume: | * Production Volume: | ||
− | + | === Description === | |
* The Production Sharing Contract area of Sanga-Sanga PSC includes seven oil and gas producing fields | * The Production Sharing Contract area of Sanga-Sanga PSC includes seven oil and gas producing fields | ||
* They are Badak, Nilam, Pamaguan, Semberah, Mutiara, Beras, and Lempake. | * They are Badak, Nilam, Pamaguan, Semberah, Mutiara, Beras, and Lempake. | ||
Line 16: | Line 16: | ||
* The fields supply gas to the [[Bontang LNG Terminal]] | * The fields supply gas to the [[Bontang LNG Terminal]] | ||
− | + | === Contractors === | |
− | * | + | * '''Tripatra:''' Engineering for a 600 MMSCFD gas processing plant |
− | + | === History === | |
* 1972 - Badak field discovered | * 1972 - Badak field discovered | ||
* 1977 - Badak starts production | * 1977 - Badak starts production | ||
Line 27: | Line 27: | ||
* 2001 - ENI becomes a partner | * 2001 - ENI becomes a partner | ||
− | + | === Geology === | |
* | * | ||
− | + | === Links === | |
# [http://www.bp.com/content/dam/bp/pdf/sustainability/country-reports/VICO_Indonesia_2004.pdf VICO Indonesia, Environmental Statement] | # [http://www.bp.com/content/dam/bp/pdf/sustainability/country-reports/VICO_Indonesia_2004.pdf VICO Indonesia, Environmental Statement] | ||
# [[Indonesia Exploration And Production Blocks]] | # [[Indonesia Exploration And Production Blocks]] | ||
# [[Tripatra Oil And Gas Processing References]] | # [[Tripatra Oil And Gas Processing References]] | ||
# [http://killajoules.wikidot.com/archive:eni-declares-wholly-unconditional-its-offer-for-lasm Eni Declares Wholly Unconditional Its Offer for Lasmo] | # [http://killajoules.wikidot.com/archive:eni-declares-wholly-unconditional-its-offer-for-lasm Eni Declares Wholly Unconditional Its Offer for Lasmo] |
Latest revision as of 06:28, 1 August 2024
Summary Information
- Operator: VICO (BP)
- Country: Indonesia
- Location: 2.42 Sanga-Sanga PSC
- Production start:
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
Description
- The Production Sharing Contract area of Sanga-Sanga PSC includes seven oil and gas producing fields
- They are Badak, Nilam, Pamaguan, Semberah, Mutiara, Beras, and Lempake.
- The oil and gas produced are processed in four main production plants.
- The first development was in Badak, in 1977, followed by Nilam (1982), Mutiara (1990) and Semberah (1991)
- The fields supply gas to the Bontang LNG Terminal
Contractors
- Tripatra: Engineering for a 600 MMSCFD gas processing plant
History
- 1972 - Badak field discovered
- 1977 - Badak starts production
- 1982 - First production from Nilam
- 1990 - First gas from Mutiara
- 1991 - Semberah field commissioned
- 2001 - ENI becomes a partner