Difference between revisions of "Chinarevskoye Gas Processing Plant"
		
		
		
		
		Jump to navigation
		Jump to search
		
| Abarrelfull (talk | contribs) | Abarrelfull (talk | contribs)  | ||
| Line 7: | Line 7: | ||
| === Brief Description === | === Brief Description === | ||
| − | *  | + | * The Gas Treatment Facility (GTF) treats gas condensate from thes wells as well as associated gas from the Oil Treatment Unit (OTU) into a mix of new products, i.e. stabilised condensate, LPG and dry gas. | 
| + | * The plant has three trains. | ||
| === Related Oil and Gas Fields === | === Related Oil and Gas Fields === | ||
| Line 20: | Line 21: | ||
| === History === | === History === | ||
| + | * 2011 - The first 2 trains of the plant began operations | ||
| * 2018 - Nostrum signed agreement to process gas from Rozhkovskoye Field | * 2018 - Nostrum signed agreement to process gas from Rozhkovskoye Field | ||
| Line 27: | Line 29: | ||
| [[category:Processing]] | [[category:Processing]] | ||
| [[category:Country]] | [[category:Country]] | ||
| − | [[category: | + | [[category:Nostrum]] | 
Revision as of 09:50, 17 January 2024
Contents
Summary Information
- Ownership: Nostrum
- Website: https://www.nostrumoilandgas.com/
- Location: North West Kazakhstan
- Capacity: 4.2 BCM per annum
Brief Description
- The Gas Treatment Facility (GTF) treats gas condensate from thes wells as well as associated gas from the Oil Treatment Unit (OTU) into a mix of new products, i.e. stabilised condensate, LPG and dry gas.
- The plant has three trains.
Related Oil and Gas Fields
Ongoing Projects
- -
Other Information
- -
History
- 2011 - The first 2 trains of the plant began operations
- 2018 - Nostrum signed agreement to process gas from Rozhkovskoye Field
