Difference between revisions of "Baldpate Oil and Gas Field"
		
		
		
		
		Jump to navigation
		Jump to search
		
Abarrelfull (talk | contribs)  | 
				Abarrelfull (talk | contribs)   | 
				||
| Line 11: | Line 11: | ||
=== Description ===  | === Description ===  | ||
* The development utilises a Compliant Tower located in 1,605 feet of water  | * The development utilises a Compliant Tower located in 1,605 feet of water  | ||
| + | * Penn State is a subsea tieback to Baldpate  | ||
* Gas is transported on the [[Garden Banks Gas Pipeline]]  | * Gas is transported on the [[Garden Banks Gas Pipeline]]  | ||
* Oil is delivered to the SM 205 platform of the [[Poseidon Oil Pipeline]]  | * Oil is delivered to the SM 205 platform of the [[Poseidon Oil Pipeline]]  | ||
| Line 22: | Line 23: | ||
=== History ===  | === History ===  | ||
* 1991 - Baldpate Oil And Gas Field discovered  | * 1991 - Baldpate Oil And Gas Field discovered  | ||
| + | * 1995 - Penn State discovered  | ||
* 1998 - First oil produced  | * 1998 - First oil produced  | ||
| + | * 1999 - First oil from Penn State  | ||
* 2023 - Chevron agreed to acquire Hess, becoming a partner  | * 2023 - Chevron agreed to acquire Hess, becoming a partner  | ||
Latest revision as of 15:52, 23 October 2023
Summary Information
- Operator: Hess
 - Country: USA
 - Location: Garden Banks Blocks 215, 216, 259 & 260, Gulf of Mexico
 - Production start: 1998
 - Partners: Anadarko
 - Type: Oil & Gas
 - Estimated Reserves:
 - Production Volume:
 
Description
- The development utilises a Compliant Tower located in 1,605 feet of water
 - Penn State is a subsea tieback to Baldpate
 - Gas is transported on the Garden Banks Gas Pipeline
 - Oil is delivered to the SM 205 platform of the Poseidon Oil Pipeline
 
Contractors
- **Gulf Marine Fab:** Construction of Compliant Tower
 - **UniversalPegasus:** Engineering services including conceptual and detailed design for the installation of a single flowline, control system, installation of high-pressure boarding valve skid, and new structural support system to receive riser
 - **Cal Dive International:** Installation of a 16-inch oil riser and 12-inch gas riser
 - **Heerema Marine Contractors:** Baldpate Compliant Tower Installation
 
History
- 1991 - Baldpate Oil And Gas Field discovered
 - 1995 - Penn State discovered
 - 1998 - First oil produced
 - 1999 - First oil from Penn State
 - 2023 - Chevron agreed to acquire Hess, becoming a partner