Difference between revisions of "Neptune and Mercury Gas Fields"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Perenco * Country: UK * Location: 047/04b & 047/09b, Southern North Sea * Production start: * Partners: * Type: Gas * Estimated Reserves: *...") |
Abarrelfull (talk | contribs) |
||
Line 20: | Line 20: | ||
* 1999 - Platform installed | * 1999 - Platform installed | ||
* 2009 - BP acquires BG Group's share of the field | * 2009 - BP acquires BG Group's share of the field | ||
+ | * 2012 - Perenco acquired the fields from BP | ||
+++ Geology | +++ Geology |
Revision as of 15:43, 28 May 2024
Summary Information
- Operator: Perenco
- Country: UK
- Location: 047/04b & 047/09b, Southern North Sea
- Production start:
- Partners:
- Type: Gas
- Estimated Reserves:
- Production Volume:
+++ Description
- The development consists of a single small steel unmanned platform
- Gas is transported to the Cleeton Gas Field, and on to the Easington Gas Processing Terminal
+++ Contractors
- -
+++ History
- 1998 - Development approval awarded
- 1999 - Platform installed
- 2009 - BP acquires BG Group's share of the field
- 2012 - Perenco acquired the fields from BP
+++ Geology
+++ Links