Difference between revisions of "Saguaro Energía LNG Export Terminal"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
| Line 25: | Line 25: | ||
=== History === | === History === | ||
* 2021 - Agreements signed with Conocophillips and Bechtel for licencing and construction | * 2021 - Agreements signed with Conocophillips and Bechtel for licencing and construction | ||
| − | * 2023 - Sales | + | * 2023 - Sales agreements signed with Exxon & Shell |
=== Other Information === | === Other Information === | ||
| Line 33: | Line 33: | ||
# [https://abarrelfull.blogspot.com/2023/02/mexico-pacific-limited-announces.html Mexico Pacific Limited Announces Collaboration with ConocoPhillips LNG Licensing and Bechtel to Champion Low Carbon LNG] | # [https://abarrelfull.blogspot.com/2023/02/mexico-pacific-limited-announces.html Mexico Pacific Limited Announces Collaboration with ConocoPhillips LNG Licensing and Bechtel to Champion Low Carbon LNG] | ||
# [https://lng-news.blogspot.com/2023/02/mexico-pacific-and-exxonmobil-execution.html Mexico Pacific and ExxonMobil Execution of Long-Term LNG Sales and Purchase Agreements] | # [https://lng-news.blogspot.com/2023/02/mexico-pacific-and-exxonmobil-execution.html Mexico Pacific and ExxonMobil Execution of Long-Term LNG Sales and Purchase Agreements] | ||
| + | # [https://lng-news.blogspot.com/2023/03/mexico-pacific-and-shell-sign-third.html Mexico Pacific and Shell sign third long-term LNG sales and purchase agreement] | ||
[[category:LNG]] | [[category:LNG]] | ||
[[category:Mexico]] | [[category:Mexico]] | ||
Revision as of 09:41, 28 March 2023
Contents
Summary Information
- Ownership: Mexico Pacific
- Website: https://mexicopacific.com/
- Location: Puerto Libertad, Sonora, Mexico
- Capacity: 14.1 million tons/annum
- Status: (Planned)
Brief Description
- A three train onshore facility, that will be built in two phases, first two trains followed by a third
Technical Details
- Storage capacity:
- Constructor:
- Bechtel: Engineering design
- Licensor: Conocophillips
Ongoing Projects/Project Status
- Commissioning is expected in 202X
Suppliers / Customers
- Suppliers: Gas will be supplied from the Permian basin
- Customers: Exxon will buy 2 million tonnes per annum
History
- 2021 - Agreements signed with Conocophillips and Bechtel for licencing and construction
- 2023 - Sales agreements signed with Exxon & Shell
Other Information
- -