Difference between revisions of "Dunkerque LNG Terminal"
		
		
		
		
		Jump to navigation
		Jump to search
		
Abarrelfull (talk | contribs)  | 
				Abarrelfull (talk | contribs)   (→Links)  | 
				||
| Line 59: | Line 59: | ||
# [http://killajoules.wikidot.com/blog:3257 Foundation stone laid for the Dunkirk LNG terminal]  | # [http://killajoules.wikidot.com/blog:3257 Foundation stone laid for the Dunkirk LNG terminal]  | ||
# [http://killajoules.wikidot.com/blog:3935 Dunkirk LNG TANKS]  | # [http://killajoules.wikidot.com/blog:3935 Dunkirk LNG TANKS]  | ||
| − | # [http://killajoules.wikidot.com/blog:5991 Cheniere Marketing    | + | # [http://killajoules.wikidot.com/blog:5991 Cheniere Marketing]  | 
# [https://a-barrel-full.blogspot.com/2020/08/commercial-commissioning-of-dunkirk.html Commercial commissioning of the Dunkirk regasification terminal]  | # [https://a-barrel-full.blogspot.com/2020/08/commercial-commissioning-of-dunkirk.html Commercial commissioning of the Dunkirk regasification terminal]  | ||
Revision as of 16:21, 29 June 2022
Contents
Summary Information
- Ownership: EDF
 - Website: http://dunkerque-lng.edf.com/uk/index.html
 - Location: Dunkirk
 - Capacity: 13 billion cubic metres/annum
 - Status: In operation
 
Brief Description
- Dunkirk's intended LNG terminal has an annual hosting capacity of 9 Gm3 (billions of m3), or around 20% of France's current consumption.
 
Technical Details
- Storage capacity: Three LNG storage tanks each with a capacity of 190,000 m3; a tank measures around 50 m in height and has a diameter of 90 m ;
 - Unloading capacity:
 - Send out capacity: 1.9 million m3(n)/h (cubic meters per hour)
 
Constructor:
- SOFREGAZ: engineering and project Management contract
 - SENER and Techint have been awarded an EPC contract as the TS LNG consortium
 - SMM: Contract for erection of 3 cryogenic LNG tanks
 - Licensor:
 
Project Status
- The construction was completed in 2017
 
Customers / Suppliers
- Customers
 
- Total will utilise some of the capacity for its needs
 - EDF will use majority of the capacity to supply 3 new gas fired plants which it is building
 - Supplies will come from the Sabine Pass LNG Terminal
 
History
- 2008 - Dunkerque LNG awarded SOFREGAZ an engineering and project Management contract
 - 2011 - EDF confirms its investment in Dunkirk methane terminal project
 - 2011 - SENER and Techint were awarded an EPC contract
 - 2011 - Final investment decision made
 - 2012 - SMM Wins Contract for erection of 3 cryogenic LNG tanks
 - 2012 - Foundation stone laid
 - 2015 - EDF signs purchase agreement with Cheniere
 - 2017 - Commercial Operation begins
 
Other Information
-
Links
- EDF pushes ahead with the development of Dunkirk methane terminal
 - Environmental Impact
 - EDF and Total Sign an agreement in the Planned Dunkirk LNG Terminal
 - EDF confirms its investment in Dunkirk methane terminal project
 - DUNKIRK - FRANCE - LNG RECEIVING TERMINAL
 - SENER to perform turnkey project for the Dunkerque Regasification Plant
 - EDF announces its final investment decision in the methane terminal at Dunkirk
 - SMM Wins Contract for erection of 3 cryogenic LNG tanks
 - Foundation stone laid for the Dunkirk LNG terminal
 - Dunkirk LNG TANKS
 - Cheniere Marketing
 - Commercial commissioning of the Dunkirk regasification terminal