Abarrelfull (talk | contribs)  (Created page with "=== Summary Information === * Operator: Cenovus * Country: Canada  * Location: Alberta * Production start: 1996 * Partners:  * Type: Oil * Estimated Reserves:  * Production Vo...")  | 
				Abarrelfull (talk | contribs)   (→Links)  | 
				||
| Line 33: | Line 33: | ||
# [http://killajoules.wikidot.com/archive:foster-creek-receives-regulatory-approval-to-expand Foster Creek receives regulatory approval to expand]  | # [http://killajoules.wikidot.com/archive:foster-creek-receives-regulatory-approval-to-expand Foster Creek receives regulatory approval to expand]  | ||
# [http://killajoules.wikidot.com/blog:5453 Cenovus provides update on Foster Creek]  | # [http://killajoules.wikidot.com/blog:5453 Cenovus provides update on Foster Creek]  | ||
| + | # [https://abarrelfull.blogspot.com/2022/06/conocophillips-announces-sale-of-foster.html ConocoPhillips Announces Sale of Foster Creek Christina Lake Partnership Interest and Western Canada Deep Basin Gas Assets to Cenovus for $13.3 Billion; Significant Transaction Accelerates Value Proposition]  | ||
Revision as of 11:39, 13 June 2022
Summary Information
- Operator: Cenovus
 - Country: Canada
 - Location: Alberta
 - Production start: 1996
 - Partners:
 - Type: Oil
 - Estimated Reserves:
 - Production Volume: 100,000 bpd
 
Description
- Foster Creek began operating as a steam-assisted gravity drainage (SAGD) project in 1996 and became the industry's first commercial SAGD project in 2001
 - Oil from the project is processed at the [[[Wood River Refinery]]]
 - Diluent is supplied by the [[[Polaris Diluent Pipeline System]]]
 - Oil is transported on the [[[Cold Lake Pipeline System]]] to Edmonton
 
Contractors
- **Aker Solutions:**
 
* Engineering -Design, manufacture & supply of 2 Treater Vessels with desand system & option for electrostatics - 14 OD x 100 * 1 FWKO Vessel c/w insulation; Engineering manual desand system & all related piping - 14 OD x 100
History
- 1996 - First Pilot production
 - 2001 - Commercial production started
 - 2010 - Foster Creek receives regulatory approval for three phases of expansion (F, G and H)
 - 2014 - First oil production from Phase F
 
Geology
Links
- Aker Solutions Oil And Gas Processing References
 - Foster Creek receives regulatory approval to expand
 - Cenovus provides update on Foster Creek
 - ConocoPhillips Announces Sale of Foster Creek Christina Lake Partnership Interest and Western Canada Deep Basin Gas Assets to Cenovus for $13.3 Billion; Significant Transaction Accelerates Value Proposition