Difference between revisions of "Malaysia Dua FLNG Terminal"

From A Barrel Full
Jump to navigation Jump to search
Line 40: Line 40:
 
# [http://killajoules.wikidot.com/blog:5134 Air Products’ LNG Expertise Selected for Second Malaysia PETRONAS FLNG Project]
 
# [http://killajoules.wikidot.com/blog:5134 Air Products’ LNG Expertise Selected for Second Malaysia PETRONAS FLNG Project]
 
# [http://killajoules.wikidot.com/blog:5735 ABB wins contract worth more than $50 million for one of the world’s first floating LNG facilities]
 
# [http://killajoules.wikidot.com/blog:5735 ABB wins contract worth more than $50 million for one of the world’s first floating LNG facilities]
# [https://abarrelfull.blogspot.com/2021/12/petronas-second-floating-lng-vessel.html PETRONAS' Second Floating LNG Vessel Sets Sail from South Korea on Its Maiden Voyage to Malaysia ]
+
# [https://abarrelfull.blogspot.com/2021/12/petronas-second-floating-lng-vessel.html PETRONAS' Second Floating LNG Vessel Sets Sail from South Korea on Its Maiden Voyage to Malaysia]
 +
# [https://abarrelfull.blogspot.com/2021/12/petronas-becomes-worlds-first-to.html PETRONAS Becomes World's First To Produce LNG From Two Floating Facilities]

Revision as of 14:36, 21 December 2021

Summary Information

  • Ownership: Petronas
  • Website: http://www.petronas.com.my/
  • Location: Sabah, Malaysia
  • Capacity: 1.5 million tons/annum
  • Status: In Operation

Brief Description

  • The FLNG is designed to produce 1.5 million tons per annum of LNG
  • It is also known as PFLNG2

Technical Details

  • Storage capacity:
  • Constructor:
    • **MITC Consortium (MODEC, IHI, TOYO and, CB&I):** The FEED includes the basic design of natural gas liquefaction system utilizing pre-cooling system, purpose designed hull, living quarters, mooring system, LNG storage tank and LNG offloading system followed by an EPCIC (Engineering, Procurement, Construction, Installation and Commissioning) cost estimate for the Project.
    • **Process Group:** 2,500 BWPD Desander Package and 1,900 BWPD Produced Water Treatment Package
    • **ABB:** designing, manufacturing and supplying transformers, switchboards, motor-control centers and power management system
  • Licensor: **Air Products**

Ongoing Projects/Project Status

  • The terminal was commissioned in 2021

Suppliers / Customers

History

  • 2012 - Award of FEED contract
  • 2014 - Final investment decision
  • 2020 - First gas produced

Other Information

  • -

Links

  1. Process Group Oil And Gas Processing References
  2. Award for FEED contract of a FLNG from PETRONAS
  3. Petronas Reaches Final Investment Decision On Second Floating LNG Project
  4. Air Products’ LNG Expertise Selected for Second Malaysia PETRONAS FLNG Project
  5. ABB wins contract worth more than $50 million for one of the world’s first floating LNG facilities
  6. PETRONAS' Second Floating LNG Vessel Sets Sail from South Korea on Its Maiden Voyage to Malaysia
  7. PETRONAS Becomes World's First To Produce LNG From Two Floating Facilities