Difference between revisions of "CLOV Oil and Gas Fields"
		
		
		
		
		Jump to navigation
		Jump to search
		
Abarrelfull (talk | contribs)  (Created page with "=== Summary Information === * Operator: Total * Country: Angola  * Location: Block 17 * Production start: 2014 * Partners:  Total - 40%,  Statoil (23.33%), Esso  (Block 17) Li...")  | 
				Abarrelfull (talk | contribs)   | 
				||
| Line 16: | Line 16: | ||
=== Contractors ===  | === Contractors ===  | ||
| − | *   | + | ==== Phase 1 ====  | 
| + | * '''Daewoo Shipbuilding & Marine Eng. Co. Ltd. (DSME):''' Engineering, procurement, installation and construction of FPSO  | ||
* **KBR:** Detailed design of topsides    | * **KBR:** Detailed design of topsides    | ||
* **Technip:** 76 kilometers of dynamic and static production and water injection umbilicals  | * **Technip:** 76 kilometers of dynamic and static production and water injection umbilicals  | ||
* **Subsea 7:** Engineering, procurement, fabrication and installation of 130km of pipes  | * **Subsea 7:** Engineering, procurement, fabrication and installation of 130km of pipes  | ||
* **FMC Technologies:**    | * **FMC Technologies:**    | ||
| − | + | ** Fabrication, assembly and testing of 36 wellhead systems and 19 subsea trees  | |
| − | + | ** Manufacture of 7 complete manifold systems  | |
| − | + | ** Critical equipment testing, offshore installation support and equipment refurbishment  | |
* **Vallourec:** Supply of 28,500 tons - or 200 km - of coated seamless line pipes and bends     | * **Vallourec:** Supply of 28,500 tons - or 200 km - of coated seamless line pipes and bends     | ||
* **JDR Cable Systems:** Design, manufacture and testing of 9 umbilical and reeler systems  | * **JDR Cable Systems:** Design, manufacture and testing of 9 umbilical and reeler systems  | ||
Revision as of 07:19, 3 December 2021
Summary Information
- Operator: Total
 - Country: Angola
 - Location: Block 17
 - Production start: 2014
 - Partners: Total - 40%, Statoil (23.33%), Esso (Block 17) Limited (20%) and BP (16.67%).
 - Type: Oil & Gas
 - Estimated Reserves: The proved and probable reserves are estimated at approximately 500 million barrels of oil
 - Production Volume:
 
Description
- The development consists of four fields, Cravo, Lirio, Orquidea and Violeta
 - These fields are located in Block 17 offshore Angola in water depths of 1,100 to 1,400 m
 - The project comprises 34 wells and 8 manifolds connected by 180 km of subsea pipelines to the [[[Clov FPSO]]] unit
 - The gas produced on CLOV will be exported via a subsea line to the onshore [[[Angola Soyo LNG Terminal]]] liquefaction plant
 
Contractors
Phase 1
- Daewoo Shipbuilding & Marine Eng. Co. Ltd. (DSME): Engineering, procurement, installation and construction of FPSO
 - **KBR:** Detailed design of topsides
 - **Technip:** 76 kilometers of dynamic and static production and water injection umbilicals
 - **Subsea 7:** Engineering, procurement, fabrication and installation of 130km of pipes
 - **FMC Technologies:**
- Fabrication, assembly and testing of 36 wellhead systems and 19 subsea trees
 - Manufacture of 7 complete manifold systems
 - Critical equipment testing, offshore installation support and equipment refurbishment
 
 - **Vallourec:** Supply of 28,500 tons - or 200 km - of coated seamless line pipes and bends
 - **JDR Cable Systems:** Design, manufacture and testing of 9 umbilical and reeler systems
 - **KWsubsea:** Lateral buckling and pipeline walking assessment and mitigation design for pipeline systems
 
History
- 2010 - FMC awarded subsea production equipment contract
 - 2010 - KBR awarded topsides contract
 - 2011 - Technip awarded umbilical contracts
 - 2013 - The FPSO arrived in Angola
 - 2014 - CLOV begins production
 
Geology
- The development will produce two types of oil: one with a 32 to 35° API gravity from the Oligocene reservoirs (Cravo-Lirio) and the other, more viscous, with a 20 to 30° API gravity from the Miocene reservoirs (Orquidea-Violeta)
 
Links
- Saipem Africa Pipeline References
 - Serimax Pipeline References
 - KWsubsea Deepwater Project Highlights References
 - Acergy S.A. awarded $1.3 billion contract for deepwater development offshore West Africa
 - Angola: Total Launches CLOV Development on Block 17
 - FMC Technologies Awarded $520 Million Order for Total's CLOV Development
 - JDR To Supply FMC With (IWOC) Umbilical And Reeler Systems For The CLOV Project
 - KBR to Execute Topsides Detailed Design for TOTAL's CLOV FPSO
 - Technip awarded umbilical contracts in Angola
 - Vallourec provides Total with a wide range of premium offshore solutions off the Angolan coast
 - CLOV Start Up In Angola: Total Increases Block 17 Production To 700,000 Barrels Per Day
 - Inauguration of CLOV in Angola