Difference between revisions of "Armada Oil and Gas Field"
		
		
		
		
		Jump to navigation
		Jump to search
		
Abarrelfull (talk | contribs)  | 
				Abarrelfull (talk | contribs)   | 
				||
| Line 1: | Line 1: | ||
=== Summary Information ===  | === Summary Information ===  | ||
| − | * Operator:   | + | * Operator: Habour Energy  | 
* Country: UK  | * Country: UK  | ||
* Location: Central North Sea  | * Location: Central North Sea  | ||
| Line 9: | Line 9: | ||
* Production Volume:    | * Production Volume:    | ||
| − | + | === Description ===  | |
| − | * The   | + | * Armada sits in Block 22/5b of the UK North Sea, 244 kilometres east of Aberdeen. It consists of the Drake, Hawkins and Fleming gas/condensate fields, with SW and NW Seymour, and Maria fields in the UK sector and the Rev and Gaupe fields (third-party fields) in the Norwegian sector tied back to Armada.  | 
| + | ** The complex originally comprised a  single platform and the 4 gas/condensate fields (Fleming, Drake, Hawkins and South-West and Seymour)    | ||
* The **Maria** Field was later added. Maria is a two-well subsea development  | * The **Maria** Field was later added. Maria is a two-well subsea development  | ||
| − | * The   | + | * The [[Gaupe Oil And Gas Field]] has been tied back to the Armada platform  | 
| − | * The   | + | * The Repsol operated [[Rev Gas and Condensate Field]] is also tied back to the platform  | 
| − | * Gas is exported via the   | + | * Gas is exported via the [[Cats Central Area Transmission System Gas Pipeline]] to Teesside, with liquids transported through the [[Forties Pipeline System]] to the Kinneil processing plant at Grangemouth  | 
+++ Contractors  | +++ Contractors  | ||
| Line 44: | Line 45: | ||
+++ Links  | +++ Links  | ||
| + | # [https://www.harbourenergy.com/media/mutlzmiu/24a-icop-armada.pdf Infrastructure Code of Practice]  | ||
# [[UK Oil and Gas Fields by Approval Date]]  | # [[UK Oil and Gas Fields by Approval Date]]  | ||
# [[List Of Oil Production Platforms In The UK]]  | # [[List Of Oil Production Platforms In The UK]]  | ||
Revision as of 18:02, 30 November 2021
Summary Information
- Operator: Habour Energy
 - Country: UK
 - Location: Central North Sea
 - Production start: 1997
 - Partners:
 - Type: Gas & Condensate
 - Reserves:
 - Production Volume:
 
Description
- Armada sits in Block 22/5b of the UK North Sea, 244 kilometres east of Aberdeen. It consists of the Drake, Hawkins and Fleming gas/condensate fields, with SW and NW Seymour, and Maria fields in the UK sector and the Rev and Gaupe fields (third-party fields) in the Norwegian sector tied back to Armada.
- The complex originally comprised a single platform and the 4 gas/condensate fields (Fleming, Drake, Hawkins and South-West and Seymour)
 
 - The **Maria** Field was later added. Maria is a two-well subsea development
 - The Gaupe Oil And Gas Field has been tied back to the Armada platform
 - The Repsol operated Rev Gas and Condensate Field is also tied back to the platform
 - Gas is exported via the Cats Central Area Transmission System Gas Pipeline to Teesside, with liquids transported through the Forties Pipeline System to the Kinneil processing plant at Grangemouth
 
+++ Contractors
- **BARMAC:** Armada Platform
 - **BiFab:**
- Phase II Plaftform
 - Engineering, Procurement and Construction of 44 Man Living Quarters and Helideck
 - Maria - Separator Module
 
 - **Seaway Heavy Lifting:** T & I of Maria Separator Module onto Armada Platform
 - **Saipem:** T& I Gas Pipelines
 - **KWSubsea:** NW Seymour Sidetrack Project - Concept/FEED design of distribution manifold and piping for tie-in
 - **AMEC:** Engineering, procurement, construction and project management for Maria
 
+++ History
- 1994 - Fleming, Drake and Hawkins development approval given
 - 1997 - First gas produced
 - 2001 - Approval granted for phase 2
 - 2002 - South West Seymour discovered
 - 2002 - Centrica acquires 5.58% stake from ENI
 - 2003 - Seymour development approved
 - 2003 - Seymour comes onstream
 - 2004 - Discovery on the Maria prospect
 - 2009 - BG Group acquired BP's stake in the field
 - 2012 - First production from Gaupe
 - 2017 - Chrysaor acquired Shell's stake in the field.
 
+++ Geology
+++ Links
- Infrastructure Code of Practice
 - UK Oil and Gas Fields by Approval Date
 - List Of Oil Production Platforms In The UK
 - Seaway Heavy Lifting Oil And Gas References
 - International Protective Coatings Platform References
 - KWSubsea Subsea References
 - Saipem Europe Pipeline References
 - Government go-ahead for Armada development underlines North Sea confidence
 - Eni increases its interest in the Liverpool Bay fields and disposes of other non core North Sea assets
 - BG Announces New Gas Discovery Near Armada Field
 - BG Brings North Sea Seymour Field Into Production
 - BG and partners announce success on the Maria fallow discovery
 - AMEC's Oil and Gas Division Awarded BG Contract
 - BG Group completes UK North Sea asset exchange with BP
 - Petrofac secures contract with BG
 - Shell to sell package of UK North Sea assets to Chrysaor for up to $3.8bn