Difference between revisions of "Dunkerque LNG Terminal"
Abarrelfull (talk | contribs)  | 
				Abarrelfull (talk | contribs)   (→Links)  | 
				||
| Line 42: | Line 42: | ||
-  | -  | ||
=== Links ===  | === Links ===  | ||
| − | + | # [http://press.edf.com/press-releases/all-press-releases/2008/edf-pushes-ahead-with-the-development-of-dunkirk-methane-terminal-43008.html EDF pushes ahead with the development of Dunkirk methane terminal]  | |
| − | EDF pushes ahead with the development of Dunkirk methane terminal  | + | # [http://dunkerque-lng.edf.com/uk/environnement/environnement_d.html Environmental Impact]  | 
| − | Environmental Impact  | + | # [http://www.total.com/en/about-total/news/news-940500.html&idActu=2317 EDF and Total Sign an agreement in the Planned Dunkirk LNG Terminal]  | 
| − | EDF and Total Sign an agreement in the Planned Dunkirk LNG Terminal  | + | # [http://killajoules.wikidot.com/blog:783 EDF confirms its investment in Dunkirk methane terminal project]  | 
| − | EDF confirms its investment in Dunkirk methane terminal project  | + | # [http://www.sofregaz.fr/en/news/2008/dunkirk-france-lng-receiving-terminal DUNKIRK - FRANCE - LNG RECEIVING TERMINAL]  | 
| − | DUNKIRK - FRANCE - LNG RECEIVING TERMINAL  | + | # [http://killajoules.wikidot.com/blog:925 SENER to perform turnkey project for the Dunkerque Regasification Plant]  | 
| − | SENER to perform turnkey project for the Dunkerque Regasification Plant  | + | # [http://killajoules.wikidot.com/blog:1006 EDF announces its final investment decision in the methane terminal at Dunkirk]  | 
| − | EDF announces its final investment decision in the methane terminal at Dunkirk  | + | # [http://killajoules.wikidot.com/blog:2771 SMM Wins Contract for erection of 3 cryogenic LNG tanks]   | 
| − | SMM Wins Contract for erection of 3 cryogenic LNG tanks  | + | # [http://killajoules.wikidot.com/blog:3257 Foundation stone laid for the Dunkirk LNG terminal]  | 
| − | Foundation stone laid for the Dunkirk LNG terminal  | + | # [http://killajoules.wikidot.com/blog:3935 Dunkirk LNG TANKS]  | 
| − | Dunkirk LNG TANKS  | + | # [http://killajoules.wikidot.com/blog:5991 Cheniere Marketing    | 
| − | Cheniere Marketing   | ||
# [https://a-barrel-full.blogspot.com/2020/08/commercial-commissioning-of-dunkirk.html Commercial commissioning of the Dunkirk regasification terminal]  | # [https://a-barrel-full.blogspot.com/2020/08/commercial-commissioning-of-dunkirk.html Commercial commissioning of the Dunkirk regasification terminal]  | ||
Revision as of 09:53, 21 August 2020
Contents
Summary Information
Ownership: EDF Website: http://dunkerque-lng.edf.com/uk/index.html Location: Dunkirk Capacity: 13 billion cubic metres/annum Status: Under construction
Brief Description
Dunkirk's intended LNG terminal would have an annual hosting capacity of 9 Gm3 (billions of m3), or around 20% of France's current consumption.
Technical Details
Storage capacity: Three LNG storage tanks each with a capacity of 190,000 m3; a tank measures around 50 m in height and has a diameter of 90 m ; Unloading capacity: Send out capacity: 1.9 million m3(n)/h (cubic meters per hour)
Constructor:
SOFREGAZ: engineering and project Management contract SENER and Techint have been awarded an EPC contract as the TS LNG consortium SMM: Contract for erection of 3 cryogenic LNG tanks Licensor:
Project Status
a final investment decision which, given the time needed to prepare the applications, is likely to occur at some point in the first six months of 2010 with start-up expected in 2015.
Customers / Suppliers
Customers
Total will utilise some of the capacity for its needs EDF will use majority of the capacity to supply 3 new gas fired plants which it is building Supplies will come from the Sabine Pass LNG Terminal Project
History
2008 - Dunkerque LNG awarded SOFREGAZ an engineering and project Management contract 2011 - EDF confirms its investment in Dunkirk methane terminal project 2011 - SENER and Techint were awarded an EPC contract 2011 - Final investment decision made 2012 - SMM Wins Contract for erection of 3 cryogenic LNG tanks 2012 - Foundation stone laid 2015 - EDF signs purchase agreement with Cheniere 2017 - Commercial Operation begins
Other Information
-
Links
- EDF pushes ahead with the development of Dunkirk methane terminal
 - Environmental Impact
 - EDF and Total Sign an agreement in the Planned Dunkirk LNG Terminal
 - EDF confirms its investment in Dunkirk methane terminal project
 - DUNKIRK - FRANCE - LNG RECEIVING TERMINAL
 - SENER to perform turnkey project for the Dunkerque Regasification Plant
 - EDF announces its final investment decision in the methane terminal at Dunkirk
 - SMM Wins Contract for erection of 3 cryogenic LNG tanks
 - Foundation stone laid for the Dunkirk LNG terminal
 - Dunkirk LNG TANKS
 - [http://killajoules.wikidot.com/blog:5991 Cheniere Marketing
 - Commercial commissioning of the Dunkirk regasification terminal