Difference between revisions of "Basrah Refinery"
Abarrelfull (talk | contribs)  (Created page with "Summary Information  Ownership: South Refineries Company Website: http://www.src.gov.iq/english/index.html Location: Basra, Iraq Capacity: 7.0 million tons/annum & 140,000 bbl...")  | 
				Abarrelfull (talk | contribs)   | 
				||
| Line 35: | Line 35: | ||
1986 - Vacuum and Solvent Units added  | 1986 - Vacuum and Solvent Units added  | ||
2011 - Shaw awarded a Feasibility Study for the Rehabilitation of the Refinery  | 2011 - Shaw awarded a Feasibility Study for the Rehabilitation of the Refinery  | ||
| − | + | === Links ===  | |
| − | Saipem Wax Units  | + | # [[Saipem Wax Units]]  | 
| − | Saipem Solvent Production Units  | + | # [[Saipem Solvent Production Units]]  | 
| − | Saipem Vacuum Distillation Units  | + | # [[Saipem Vacuum Distillation Units]]  | 
| − | Prokop Engineering Refinery References  | + | # [[Prokop Engineering Refinery References]]  | 
| − | Shaw to Conduct Feasibility Study to Rehabilitate Refinery in Iraq  | + | # [http://killajoules.wikidot.com/blog:1743 Shaw to Conduct Feasibility Study to Rehabilitate Refinery in Iraq]  | 
| + | # [https://refiningnews.blogspot.com/2020/08/jgc-receives-order-for-refinery.html JGC Receives Order for Refinery Upgrading Project in Iraq]  | ||
Revision as of 09:31, 14 August 2020
Summary Information
Ownership: South Refineries Company Website: http://www.src.gov.iq/english/index.html Location: Basra, Iraq Capacity: 7.0 million tons/annum & 140,000 bbl/day Nelson Complexity: Refining Units
Two units for hydrogenation of light distiller capacity of each unit (29000) barrels / day. Two units to improve their respective gasoline, capacity (8000) barrels / day. Two units for the production of liquid gas, capacity of each unit (200) tons / day. Unit for hydrogenation oil gas with capacity (12000) barrels / day. Four small units of mobile refining capacity each (10000) barrels / day and begun work in February 1997 and was completed in September 1997. liquidator fats established in 1982 and began production in 1996, amounting to energy productivity (100.000) tons / year and consists of vacuum distillation unit, a unit for removing the asphalt, furfural treatment unit, and wax removing unit, hydrogenation fat unit, mixing and packaging unit, and the unit of Hydrogenation and pouring wax . Terminal Capacity
Crude Oil: Refined Products: Crude Supply
- Products Produced
- Ongoing Projects
For Details see Basrah Refinery Upgrading Project The refinery is being upgraded with the addition of an FCC Other Information
- History
1986 - Vacuum and Solvent Units added 2011 - Shaw awarded a Feasibility Study for the Rehabilitation of the Refinery