Difference between revisions of "Ethylen-Pipeline Süd (EPS)"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Source: Münchsmünster, Bavaria * Destination: Ludwigshafen, Rhineland-Palatinate * Ownership: * Website: https://www.eps-pipeline.de/ * Lengt...") |
Abarrelfull (talk | contribs) |
||
(One intermediate revision by the same user not shown) | |||
Line 12: | Line 12: | ||
* The underground pipeline runs from Münchsmünster for around 103 kilometres through Bavaria, 197 kilometres long in Baden-Württemberg, before the pipeline arrives in Ludwigshafen after another 70 kilometres through Rhineland-Palatinate. | * The underground pipeline runs from Münchsmünster for around 103 kilometres through Bavaria, 197 kilometres long in Baden-Württemberg, before the pipeline arrives in Ludwigshafen after another 70 kilometres through Rhineland-Palatinate. | ||
− | * In Münchsmünster, it is connected to a pipeline to Burghausen while at BASF in Ludwigshafen, the pipeline has been connected to the downstream pipelines of the northwestern German ethylene network. | + | * In Münchsmünster, it is connected to a pipeline to [[Burghausen Refinery]] while at BASF in Ludwigshafen, the pipeline has been connected to the downstream pipelines of the northwestern German ethylene network. |
=== Pipeline Status === | === Pipeline Status === | ||
Line 26: | Line 26: | ||
=== Links === | === Links === | ||
− | # [ ] | + | # [https://abarrelfull.blogspot.com/2025/03/eps-pipeline-officially-opened-at.html EPS Pipeline Officially Opened at Ceremony in Munich] |
[[category:Pipeline]] | [[category:Pipeline]] | ||
[[category:Germany]] | [[category:Germany]] |
Latest revision as of 10:42, 13 March 2025
Contents
Summary Information
- Source: Münchsmünster, Bavaria
- Destination: Ludwigshafen, Rhineland-Palatinate
- Ownership:
- Website: https://www.eps-pipeline.de/
- Length: 370 kilometres ( miles)
- Capacity: barrels of oil per day
- Product Type: Ethylene
Brief Description
- The underground pipeline runs from Münchsmünster for around 103 kilometres through Bavaria, 197 kilometres long in Baden-Württemberg, before the pipeline arrives in Ludwigshafen after another 70 kilometres through Rhineland-Palatinate.
- In Münchsmünster, it is connected to a pipeline to Burghausen Refinery while at BASF in Ludwigshafen, the pipeline has been connected to the downstream pipelines of the northwestern German ethylene network.
Pipeline Status
- In operation
History
- 2013 - The pipeline began operations
Other Information
- -