Difference between revisions of "Hibiscus Gas Field"
		
		
		
		
		Jump to navigation
		Jump to search
		
Abarrelfull (talk | contribs)  | 
				Abarrelfull (talk | contribs)   | 
				||
| (One intermediate revision by the same user not shown) | |||
| Line 11: | Line 11: | ||
=== Description ===  | === Description ===  | ||
* The Hibiscus platform is installed in a water depth of 492 ft (150 m)  | * The Hibiscus platform is installed in a water depth of 492 ft (150 m)  | ||
| − | * There is a 67 mile (107 km), 24-inch pipeline from the development to the   | + | * There is a 67 mile (107 km), 24-inch pipeline from the development to the [[Atlantic LNG Terminal]]  | 
* The [[Poinsettia Gas Field]] is tied back to the Hibiscus Platform  | * The [[Poinsettia Gas Field]] is tied back to the Hibiscus Platform  | ||
=== Contractors ===  | === Contractors ===  | ||
| − | *   | + | * '''Heerema Marine Contractors:''' Installation  | 
=== History ===  | === History ===  | ||
Latest revision as of 11:14, 16 July 2024
Summary Information
- Operator: BG-Group
 - Country: Trinidad and Tobago
 - Location: North Coast Marine Area (NCMA)
 - Production start: 2002
 - Partners:
 - Type: Gas
 - Estimated Reserves:
 - Production Volume:
 
Description
- The Hibiscus platform is installed in a water depth of 492 ft (150 m)
 - There is a 67 mile (107 km), 24-inch pipeline from the development to the Atlantic LNG Terminal
 - The Poinsettia Gas Field is tied back to the Hibiscus Platform
 
Contractors
- Heerema Marine Contractors: Installation
 
History
- 1975 - Hibiscus Gas Field discovered
 - 2000 - The Government of Trinidad & Tobago approved the development
 - 2002 - The Hibiscus field begins production