Difference between revisions of "Shetland Gas Plant"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
| (2 intermediate revisions by the same user not shown) | |||
| Line 7: | Line 7: | ||
=== Brief Description === | === Brief Description === | ||
| − | * | + | * When the production fluids arrive onshore, the liquids (condensates) are removed and piped to the nearby [[Sullom Voe Oil Terminal]] |
| + | * The plant can process 500 million standard cubic feet of gas per day | ||
=== Related Oil and Gas Fields === | === Related Oil and Gas Fields === | ||
Latest revision as of 14:16, 4 July 2024
Contents
Summary Information
- Ownership: Total
- Website: http://www.total.com/
- Location: Sullom Voe, Scotland
- Capacity: 500 mmscf/d
Brief Description
- When the production fluids arrive onshore, the liquids (condensates) are removed and piped to the nearby Sullom Voe Oil Terminal
- The plant can process 500 million standard cubic feet of gas per day
Related Oil and Gas Fields
- The plant was built to process gas and condensate from the Laggan and Tormore Gas Fields
- It also processes gas from Edradour Gas and Condensate Field
Contractors
- Petrofac: Engineering and procurement, supply, construction, commissioning and start-up
- Aker Solutions: Operations and maintenance services
Ongoing Projects
- -
Other Information
- -
History
- 2010 - Petrofac awarded EPC contract
- 2016 - The plant began operations
- 2024 - Prax agrees to acquire Total's stake in the plant