Difference between revisions of "Vampire, Viscount and Valkyrie Gas Fields"
		
		
		
		
		Jump to navigation
		Jump to search
		
Abarrelfull (talk | contribs)  | 
				Abarrelfull (talk | contribs)   | 
				||
| Line 9: | Line 9: | ||
* Production Volume:    | * Production Volume:    | ||
| − | + | === Description ===  | |
* The Vampire development consists of a single a normally unmanned minimum facility fixed steel Platform  | * The Vampire development consists of a single a normally unmanned minimum facility fixed steel Platform  | ||
* The Viscount development will consists of three production wells, a normally unmanned minimum facility fixed steel Platform and a subsea pipeline tied in to the Vampire platform  | * The Viscount development will consists of three production wells, a normally unmanned minimum facility fixed steel Platform and a subsea pipeline tied in to the Vampire platform  | ||
| − | * Valkyrie   | + | * Valkyrie consists of a single extended reach well into the Valkyrie reservoir from the existing Vampire platform  | 
* Gas is transported via the [[Lincolnshire Offshore Gas Gathering System (Loggs)]] to the Theddlethorpe Gas Processing Plant  | * Gas is transported via the [[Lincolnshire Offshore Gas Gathering System (Loggs)]] to the Theddlethorpe Gas Processing Plant  | ||
| − | + | === Contractors ===  | |
* **Odebrecht:** T&I for Vampire platform  | * **Odebrecht:** T&I for Vampire platform  | ||
| − | + | === History ===  | |
* 1998 - Vampire development approval granted  | * 1998 - Vampire development approval granted  | ||
* 2002 - Development approval for Viscount  | * 2002 - Development approval for Viscount  | ||
| Line 25: | Line 25: | ||
* 2021 - Premier Oil and Chrysaor merge to create Harbour Energy  | * 2021 - Premier Oil and Chrysaor merge to create Harbour Energy  | ||
| − | + | === Geology ===  | |
*    | *    | ||
| − | + | === Links ===  | |
# [[List Of Oil and Gas Production Platforms In The UK]]  | # [[List Of Oil and Gas Production Platforms In The UK]]  | ||
# [[UK Oil and Gas Fields by Approval Date]]  | # [[UK Oil and Gas Fields by Approval Date]]  | ||
Latest revision as of 12:18, 29 June 2024
Summary Information
- Operator: Harbour Energy
 - Country: UK
 - Location: 049/16
 - Production start:
 - Partners:
 - Type: Gas
 - Estimated Reserves:
 - Production Volume:
 
Description
- The Vampire development consists of a single a normally unmanned minimum facility fixed steel Platform
 - The Viscount development will consists of three production wells, a normally unmanned minimum facility fixed steel Platform and a subsea pipeline tied in to the Vampire platform
 - Valkyrie consists of a single extended reach well into the Valkyrie reservoir from the existing Vampire platform
 - Gas is transported via the Lincolnshire Offshore Gas Gathering System (Loggs) to the Theddlethorpe Gas Processing Plant
 
Contractors
- **Odebrecht:** T&I for Vampire platform
 
History
- 1998 - Vampire development approval granted
 - 2002 - Development approval for Viscount
 - 2004 - Valkyrie granted development approval
 - 2019 - Chrysaor acquired Conocophillips's stake in the field
 - 2021 - Premier Oil and Chrysaor merge to create Harbour Energy