* Country: UK
 
* Country: UK
 
* Location: North Sea
 
* Location: North Sea
* Production start:  
+
* Production start: 1997
 
* Partners:  
 
* Partners:  
 
* Type: Oil / Gas
 
* Type: Oil / Gas
Line 10: Line 10:
  
 
=== Description ===
 
=== Description ===
The Curlew cluster is located in Block 29/7 of the United Kingdom Continental Shelf (UKCS) in the central North Sea. It is situated 197 km SE of Aberdeen.  
+
* The Curlew cluster is located in Block 29/7 of the United Kingdom Continental Shelf (UKCS) in the central North Sea. It is situated 197 km SE of Aberdeen.  
* The Curlew is a Floating Production, Storage and Offloading vessel (FPSO) [[Maersk Curlew FPSO]], located over the Curlew reservoir.  
+
* The Curlew development is a Floating Production, Storage and Offloading vessel (FPSO) [[Maersk Curlew FPSO]], located over the Curlew reservoir.  
* The FPSO has equipment for oil and gas processing, storage and offloading, gas processing and export and treatment of produced water. Oil from  
+
* The FPSO has equipment for oil and gas processing, storage and offloading, gas processing and export and treatment of produced water. Oil from the Curlew FPSO is exported onshore via shuttle tanker, while gas is exported from the Curlew FPSO to the [[SEGAL St Fergus Gas Processing Terminal]] via the [[Fulmar Gas Pipeline]]
the Curlew FPSO is exported onshore via shuttle tanker, while gas is exported from the Curlew FPSO to the St. Fergus Terminal via the [[Fulmar Gas Pipeline]]
+
* There are 3 subsea tie-backs to the Curlew FPSO:
The Curlew FPSO was originally built at the Odense Steel Shipyard in Denmark as the tanker Maersk Dorset
+
** Curlew B field produced from a single well;
in 1983. In 1997, The tanker was converted at A&P Tyne on the River Tyne, while the fabrication,
+
** Curlew C field produces from a single well (re-uses the original Kyle dynamic riser) with gas lift and associated subsea structures;
construction and installation of the topsides was carried out by AMEC. It was deployed in the Curlew Field
+
** Curlew D field produces via two production lines from four wells tied back to a production manifold together and associated subsea structures;
in 1997, where it produced first oil that arose from the phased development of the subsea Curlew B-D
+
* The [[Kyle Oil Field]] was tied to the FPSO back until 2005, but is currently physically disconnected and was connected instead to the [[Petrojarl Banff FPSO]]
fields.
 
There are 3 subsea tie-backs to the Curlew FPSO:
 
Curlew B field produced from a single well;
 
Curlew C field produces from a single well (re-uses the original Kyle dynamic riser) with gas lift  
 
and associated subsea structures;
 
Curlew D field produces via two production lines from four wells tied back to a production  
 
manifold together and associated subsea structures;
 
Gas is exported to St Fergus via a connection to the Fulmar pipeline, with associated subsea structures.
 
The Kyle field was tied to the FPSO back until 2005, but is currently physically disconnected and is produced
 
over a different host. Curlew C was brought online in 2008 as a tie back to the FPSO via a production and
 
gas lift line. Curlew B field has been shut-in since 2007. Shell acquired ownership of the FPSO in 2013.
 
 
 
 
 
* The Curlew field system comprises a floating production storage offloading unit (FPSO), [[Maersk Curlew FPSO]], connected via flexible flowlines and risers to three fields (Curlew B, C, and D)
 
* Gas is transported through the [[Fulmar Gas Pipeline]] for sale in the UK
 
  
 
=== Contractors ===
 
=== Contractors ===
* **A&P Tyne:** Construction of hull
+
* '''A&P Tyne:''' Construction of hull
* **AMEC:**
+
* '''AMEC:'''
 
** Construction of Topsides
 
** Construction of Topsides
 
** FEED for for modifications to Maersk’s Curlew FPSO
 
** FEED for for modifications to Maersk’s Curlew FPSO
* **KWSubsea:** Curlew C Development - Detailed design of 6km 8" production pipeline, 3" gas lift piggyback system, tie-in spoolpiece, control umbilical and pliant wave tether base
+
* '''KWSubsea:''' Curlew C Development - Detailed design of 6km 8" production pipeline, 3" gas lift piggyback system, tie-in spoolpiece, control umbilical and pliant wave tether base
* **J P Kenny:** Design and supply of tee assembly for new well
+
* '''J P Kenny:''' Design and supply of tee assembly for new well
  
 
=== History ===
 
=== History ===
 
* 1996 - Project development approved by UK Government
 
* 1996 - Project development approved by UK Government
 +
* 1997 - First oil
 
* 2007 - Project development approved by UK Government for Curlew C
 
* 2007 - Project development approved by UK Government for Curlew C
 +
* 2007 - Curlew B was shut down
 +
* 2008 - Curlew C began production
 
* 2010 - AMEC awarded FEED for for modifications to the FPSO
 
* 2010 - AMEC awarded FEED for for modifications to the FPSO
 +
* 2013 - Shell acquired the FPSO
 
* 2016 - Shell submitted request for cessation of production
 
* 2016 - Shell submitted request for cessation of production
 
* 2018 - Shell submitted a plan for decommissioning
 
* 2018 - Shell submitted a plan for decommissioning
Line 64: Line 53:
 
# [http://killajoules.wikidot.com/blog:113 AMEC awarded FEED for Maersk’s Curlew FPSO]
 
# [http://killajoules.wikidot.com/blog:113 AMEC awarded FEED for Maersk’s Curlew FPSO]
 
# [https://www.shell.co.uk/about-us/sustainability/decommissioning/curlew.html Curlew Decommissioning]
 
# [https://www.shell.co.uk/about-us/sustainability/decommissioning/curlew.html Curlew Decommissioning]
 +
 +
[[category:Field]]
 +
[[category:UK]]
 +
[[category:Shell]]
 +
[[category:Decommissioned]]

Latest revision as of 12:35, 19 June 2024

Summary Information

  • Operator: Shell
  • Country: UK
  • Location: North Sea
  • Production start: 1997
  • Partners:
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume: No longer producing

Description

  • The Curlew cluster is located in Block 29/7 of the United Kingdom Continental Shelf (UKCS) in the central North Sea. It is situated 197 km SE of Aberdeen.
  • The Curlew development is a Floating Production, Storage and Offloading vessel (FPSO) Maersk Curlew FPSO, located over the Curlew reservoir.
  • The FPSO has equipment for oil and gas processing, storage and offloading, gas processing and export and treatment of produced water. Oil from the Curlew FPSO is exported onshore via shuttle tanker, while gas is exported from the Curlew FPSO to the SEGAL St Fergus Gas Processing Terminal via the Fulmar Gas Pipeline
  • There are 3 subsea tie-backs to the Curlew FPSO:
    • Curlew B field produced from a single well;
    • Curlew C field produces from a single well (re-uses the original Kyle dynamic riser) with gas lift and associated subsea structures;
    • Curlew D field produces via two production lines from four wells tied back to a production manifold together and associated subsea structures;
  • The Kyle Oil Field was tied to the FPSO back until 2005, but is currently physically disconnected and was connected instead to the Petrojarl Banff FPSO

Contractors

  • A&P Tyne: Construction of hull
  • AMEC:
    • Construction of Topsides
    • FEED for for modifications to Maersk’s Curlew FPSO
  • KWSubsea: Curlew C Development - Detailed design of 6km 8" production pipeline, 3" gas lift piggyback system, tie-in spoolpiece, control umbilical and pliant wave tether base
  • J P Kenny: Design and supply of tee assembly for new well

History

  • 1996 - Project development approved by UK Government
  • 1997 - First oil
  • 2007 - Project development approved by UK Government for Curlew C
  • 2007 - Curlew B was shut down
  • 2008 - Curlew C began production
  • 2010 - AMEC awarded FEED for for modifications to the FPSO
  • 2013 - Shell acquired the FPSO
  • 2016 - Shell submitted request for cessation of production
  • 2018 - Shell submitted a plan for decommissioning
  • 2019 - Production ceased
  • 2019 - Approval granted for decommissioning

Geology

Links

  1. 2013 Annual Environmental Statement for Shell U.K
  2. UK Oil and Gas Fields by Approval Date
  3. List Of Oil Production Platforms In The UK
  4. UK Oil and Gas Field Approved Decommissioning Programmes
  5. KWSubsea Subsea References
  6. J P Kenny Subsea References
  7. Kyle Field Update
  8. AMEC awarded FEED for Maersk’s Curlew FPSO
  9. Curlew Decommissioning