Difference between revisions of "Ardmore Oil Field"

From A Barrel Full
Jump to navigation Jump to search
 
Line 1: Line 1:
 
* **The field which is now known as the [[Alma Oil Field]]** was previously called [[Argyll Oil Field]]
 
* **The field which is now known as the [[Alma Oil Field]]** was previously called [[Argyll Oil Field]]
  
+++ Summary Information
+
=== Summary Information ===
 
* Operator: EnQuest
 
* Operator: EnQuest
 
* Country: UK
 
* Country: UK
Line 11: Line 11:
 
* Production Volume:  
 
* Production Volume:  
  
+++ Description
+
=== Description ===
 
* The field is to be operated together with the [[Galia Oil Field]] using the [[Enquest Producer FPSO]]
 
* The field is to be operated together with the [[Galia Oil Field]] using the [[Enquest Producer FPSO]]
  
+++ Contractors
+
=== Contractors ===
 
* **Technip:**
 
* **Technip:**
 
** Installation of two 10” production flexible flowlines, one 8” water injection flexible flowline and one further 8” production flexible flowline,
 
** Installation of two 10” production flexible flowlines, one 8” water injection flexible flowline and one further 8” production flexible flowline,
Line 24: Line 24:
 
* **Jumbo:** FPSO mooring, installation and hook-up contract
 
* **Jumbo:** FPSO mooring, installation and hook-up contract
  
+++ History
+
=== History ===
 
* 1992 - Decommissioning was approved for the Argyll Oil Field
 
* 1992 - Decommissioning was approved for the Argyll Oil Field
 
* 2012 - Field development approval given
 
* 2012 - Field development approval given
Line 30: Line 30:
 
* 2012 - Jumbo awarded FPSO mooring, installation and hook-up contract
 
* 2012 - Jumbo awarded FPSO mooring, installation and hook-up contract
  
+++ Geology
+
=== Geology ===
 
*  
 
*  
  
+++ Links
+
=== Links ===
 +
# [[UK Oil and Gas Field Approved Decommissioning]]
 
# [http://killajoules.wikidot.com/blog:2690 Technip awarded contract for EnQuest’s Alma and Galia development in UK North Sea]
 
# [http://killajoules.wikidot.com/blog:2690 Technip awarded contract for EnQuest’s Alma and Galia development in UK North Sea]
 
# [http://killajoules.wikidot.com/blog:3508 Jumbo main installation contractor for EnQuest Producer]
 
# [http://killajoules.wikidot.com/blog:3508 Jumbo main installation contractor for EnQuest Producer]

Latest revision as of 10:05, 28 June 2024

Summary Information

  • Operator: EnQuest
  • Country: UK
  • Location: North Sea
  • Production start:
  • Partners:
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume:

Description

Contractors

  • **Technip:**
    • Installation of two 10” production flexible flowlines, one 8” water injection flexible flowline and one further 8” production flexible flowline,
    • Installation of three 8” flexible risers,
    • Installation of two production control umbilicals/risers,
    • Installation of four power cables and associated dynamic risers,
    • Procurement, fabrication and installation of a 175 ton manifold structure,
    • Associated trenching operations, tie-ins, testing and commissioning.
  • **Jumbo:** FPSO mooring, installation and hook-up contract

History

  • 1992 - Decommissioning was approved for the Argyll Oil Field
  • 2012 - Field development approval given
  • 2012 - Technip awarded subsea contract
  • 2012 - Jumbo awarded FPSO mooring, installation and hook-up contract

Geology

Links

  1. UK Oil and Gas Field Approved Decommissioning
  2. Technip awarded contract for EnQuest’s Alma and Galia development in UK North Sea
  3. Jumbo main installation contractor for EnQuest Producer