Difference between revisions of "Chinarevskoye Oil and Gas Field"
		
		
		
		
		Jump to navigation
		Jump to search
		
| Abarrelfull (talk | contribs) | Abarrelfull (talk | contribs)  | ||
| Line 6: | Line 6: | ||
| * Partners:   | * Partners:   | ||
| * Type: Oil & Gas | * Type: Oil & Gas | ||
| − | * Estimated Reserves:   | + | * Estimated Reserves: Total 2P (Proven plus Probable) reserves are 28.3 mmboe as of 31 December 2022 | 
| * Production Volume:   | * Production Volume:   | ||
| === Description === | === Description === | ||
| + | * An onshore field covering a large geographical area | ||
| * The Chinarevskoye field has produced more than 100 million boe since 2004. It is positioned in the pre-Caspian basin | * The Chinarevskoye field has produced more than 100 million boe since 2004. It is positioned in the pre-Caspian basin | ||
| + | * There have been 103 wells and side-tracks drilled under the PSA between 2004 and 2021.  | ||
| + | * The oil treatment facility (OTF) has a maximum throughput capacity of 400,000 tonnes per annum. | ||
| + | * Gas is processed at the [[Chinarevskoye Gas Processing Plant]] along with gas from other fields | ||
| === Contractors === | === Contractors === | ||
| Line 19: | Line 23: | ||
| === Geology === | === Geology === | ||
| − | *   | + | * Chinarevskoye is a multi-layer structure with 17 reservoirs and 53 compartments spread over three areas. Commercial hydrocarbons have been found in the Lower Permian, Bashkirian, Bobrikovski, Tournaisian, Frasnian, Mullinski, Ardatovski, and Biyski-Afoninski reservoirs. | 
| === Links === | === Links === | ||
Latest revision as of 09:43, 17 January 2024
Summary Information
- Operator: Nostrum
- Country: Kazakhstan
- Location:
- Production start: 2004
- Partners:
- Type: Oil & Gas
- Estimated Reserves: Total 2P (Proven plus Probable) reserves are 28.3 mmboe as of 31 December 2022
- Production Volume:
Description
- An onshore field covering a large geographical area
- The Chinarevskoye field has produced more than 100 million boe since 2004. It is positioned in the pre-Caspian basin
- There have been 103 wells and side-tracks drilled under the PSA between 2004 and 2021.
- The oil treatment facility (OTF) has a maximum throughput capacity of 400,000 tonnes per annum.
- Gas is processed at the Chinarevskoye Gas Processing Plant along with gas from other fields
Contractors
- -
History
- 1997 - Nostrum was granted an exploration and production licence
Geology
- Chinarevskoye is a multi-layer structure with 17 reservoirs and 53 compartments spread over three areas. Commercial hydrocarbons have been found in the Lower Permian, Bashkirian, Bobrikovski, Tournaisian, Frasnian, Mullinski, Ardatovski, and Biyski-Afoninski reservoirs.