Summary Information
+
=== Summary Information ===
  
 
* Name: Espirito Santo Bc 10 FPSO
 
* Name: Espirito Santo Bc 10 FPSO
Line 10: Line 10:
 
* Year of Completion: 2008
 
* Year of Completion: 2008
  
+++ Brief Description
+
=== Brief Description ===
  
 
* FPSO Espirito Santo has a daily processing capacity of 100,000 barrels of oil and 1.42 million cubic meters of gas, and storage of up to 1.4 million barrels.
 
* FPSO Espirito Santo has a daily processing capacity of 100,000 barrels of oil and 1.42 million cubic meters of gas, and storage of up to 1.4 million barrels.
 
* It is the conversion of a crude tanker
 
* It is the conversion of a crude tanker
  
+++ Contractors
+
=== Contractors ===
* **SBM Offshore:** Lease and operation of the FPSO
+
* '''SBM Offshore:''' Lease and operation of the FPSO
* **Keppel :** Conversion, including refurbishment and conversion of the vessel’s existing systems, upgrading of the accommodation facilities, fabrication and installation of sponson tanks (making the entire hull double sided), the turret mooring system, pipe rack, flare tower and helideck as well as integration of all of the oil processing modules
+
* '''Keppel:''' Conversion, including refurbishment and conversion of the vessel’s existing systems, upgrading of the accommodation facilities, fabrication and installation of sponson tanks (making the entire hull double sided), the turret mooring system, pipe rack, flare tower and helideck as well as integration of all of the oil processing modules
* **Kavin Engineering:** Gas Dehydration and TEG Regeneration Package
+
* '''Kavin Engineering:''' Gas Dehydration and TEG Regeneration Package
* **Nexans:** Manufacture and supply the specialized offshore power, control and instrumentation cables
+
* '''Nexans:''' Manufacture and supply the specialized offshore power, control and instrumentation cables
* **Dyna-Mac:** Seven units of topside modules
+
* '''Dyna-Mac:''' Seven units of topside modules
* **VWS Westgarth:** Water Treatment
+
* '''VWS Westgarth:''' Water Treatment
  
+++ Status
+
=== Status ===
 
* In operation
 
* In operation
  
+++ History
+
=== History ===
 
* 2006 - SBM Offshore awarded FPSO contract
 
* 2006 - SBM Offshore awarded FPSO contract
 
* 2008 - Espirito Santo FPSO arrives in Brazil
 
* 2008 - Espirito Santo FPSO arrives in Brazil
 
* 2009 - Phase 1 oil production starts
 
* 2009 - Phase 1 oil production starts
 +
* 2025 - SBM Offshore acquired a further stake from MISC Berhad
  
+++ Other Information
+
=== Other Information ===
  
 
* -
 
* -
  
+++ Links
+
=== Links ===
  
 
# [[Dyna-Mac Topsides Module Business]]
 
# [[Dyna-Mac Topsides Module Business]]
Line 47: Line 48:
 
# [http://killajoules.wikidot.com/archive:new-orders-for-sbm-offshore-including-a-lease-contra/ New Orders For SBM Offshore Including A Lease Contract With Shell For The BC-10 FPSO, Brazil]
 
# [http://killajoules.wikidot.com/archive:new-orders-for-sbm-offshore-including-a-lease-contra/ New Orders For SBM Offshore Including A Lease Contract With Shell For The BC-10 FPSO, Brazil]
 
# [http://killajoules.wikidot.com/archive:shell-begins-production-at-parque-das-conchas-bc-10/ Shell begins production at Parque das Conchas (BC-10) offshore Brazil]
 
# [http://killajoules.wikidot.com/archive:shell-begins-production-at-parque-das-conchas-bc-10/ Shell begins production at Parque das Conchas (BC-10) offshore Brazil]
 +
# [https://abarrelfull.blogspot.com/2025/03/sbm-offshore-completes-share-purchase.html SBM Offshore completes the Share Purchase Agreements with MISC Berhad]
 +
 +
[[Category:FSPO]]
 +
[[Category:Brazil]]
 +
[[Category:SBM Offshore]]

Latest revision as of 16:49, 30 March 2025

Summary Information

Brief Description

  • FPSO Espirito Santo has a daily processing capacity of 100,000 barrels of oil and 1.42 million cubic meters of gas, and storage of up to 1.4 million barrels.
  • It is the conversion of a crude tanker

Contractors

  • SBM Offshore: Lease and operation of the FPSO
  • Keppel: Conversion, including refurbishment and conversion of the vessel’s existing systems, upgrading of the accommodation facilities, fabrication and installation of sponson tanks (making the entire hull double sided), the turret mooring system, pipe rack, flare tower and helideck as well as integration of all of the oil processing modules
  • Kavin Engineering: Gas Dehydration and TEG Regeneration Package
  • Nexans: Manufacture and supply the specialized offshore power, control and instrumentation cables
  • Dyna-Mac: Seven units of topside modules
  • VWS Westgarth: Water Treatment

Status

  • In operation

History

  • 2006 - SBM Offshore awarded FPSO contract
  • 2008 - Espirito Santo FPSO arrives in Brazil
  • 2009 - Phase 1 oil production starts
  • 2025 - SBM Offshore acquired a further stake from MISC Berhad

Other Information

  • -

Links

  1. Dyna-Mac Topsides Module Business
  2. International Protective Coatings FPSO References
  3. Kavin Engineering FPSO References
  4. Misc FPSOs And Platforms
  5. VWS Westgarth FPSO References
  6. Nexans completes an offshore cable contract for the conversion of ESPIRITO SANTO FPSO
  7. Keppel Shipyard scores another safety record with its ninth FPSO delivery for SBM
  8. Parque das Conchas FPSO arrives in Brazil
  9. New Orders For SBM Offshore Including A Lease Contract With Shell For The BC-10 FPSO, Brazil
  10. Shell begins production at Parque das Conchas (BC-10) offshore Brazil
  11. SBM Offshore completes the Share Purchase Agreements with MISC Berhad