Difference between revisions of "South Angsi Oil Field"

From A Barrel Full
Jump to navigation Jump to search
 
Line 1: Line 1:
Summary Information
+
=== Summary Information ===
 
* Operator: Repsol  
 
* Operator: Repsol  
 
* Country: Malaysia
 
* Country: Malaysia
Line 9: Line 9:
 
* Production Volume:  
 
* Production Volume:  
  
+++ Description
+
=== Description ===
* The field utilkises the [[South Angsi FSO]] and the Angsi A platform
+
* The field utilises the [[South Angsi FSO]] and the Angsi A platform
 +
* There were 15 wells, eight oil producers, six water injectors & one gas producer
  
+++ Contractors
+
=== Contractors ===
 
* '''Subsea 7:''' Installation of the mooring system for a floating storage offloading unit (FSO) consisting of twelve piles for the FSO and two piles for a shuttle tanker
 
* '''Subsea 7:''' Installation of the mooring system for a floating storage offloading unit (FSO) consisting of twelve piles for the FSO and two piles for a shuttle tanker
 
* '''MMHE:''' Platform A construction
 
* '''MMHE:''' Platform A construction
Line 18: Line 19:
 
* '''Process Group:''' Angsi A platform - Sand Handling and Removal Package
 
* '''Process Group:''' Angsi A platform - Sand Handling and Removal Package
  
+++ History
+
=== History ===
 
* 2005 - Subsea 7 awarded mooring system contract
 
* 2005 - Subsea 7 awarded mooring system contract
 
* 2005 - Talisman Announces First Oil Production
 
* 2005 - Talisman Announces First Oil Production
 
* 2014 - Repsol acquired Talisman and became operator
 
* 2014 - Repsol acquired Talisman and became operator
  
+++ Geology
+
=== Geology ===
 
*  
 
*  
  
+++ Links
+
=== Links ===
 
# [[Jotun Platform References]]
 
# [[Jotun Platform References]]
 
# [[MMCOG Platform References]]
 
# [[MMCOG Platform References]]

Latest revision as of 10:10, 20 December 2023

Summary Information

  • Operator: Repsol
  • Country: Malaysia
  • Location: Block PM-305 offshore
  • Production start: 2005
  • Partners:
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • The field utilises the South Angsi FSO and the Angsi A platform
  • There were 15 wells, eight oil producers, six water injectors & one gas producer

Contractors

  • Subsea 7: Installation of the mooring system for a floating storage offloading unit (FSO) consisting of twelve piles for the FSO and two piles for a shuttle tanker
  • MMHE: Platform A construction
  • MMCOG: Detailed Design for Angsi Facilities Upgrading Project - Booster Compression Module
  • Process Group: Angsi A platform - Sand Handling and Removal Package

History

  • 2005 - Subsea 7 awarded mooring system contract
  • 2005 - Talisman Announces First Oil Production
  • 2014 - Repsol acquired Talisman and became operator

Geology

Links

  1. Jotun Platform References
  2. MMCOG Platform References
  3. Misc FPSOs And Platforms
  4. Process Group Oil And Gas Processing References
  5. MISC Secured Another FSO Contract
  6. Contract for Subsea 7 in Malaysia
  7. Talisman Announces First Oil Production From South Angsi Field in Malaysia
  8. Repsol reaches an agreement with Talisman Energy to acquire the Canadian oil company