Difference between revisions of "Pak-Arab Refinery"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) (→Links) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
* Ownership: PARCO | * Ownership: PARCO | ||
Line 7: | Line 7: | ||
* Nelson Complexity: | * Nelson Complexity: | ||
− | + | === Refining Units === | |
* Atmospheric distillation unit | * Atmospheric distillation unit | ||
Line 14: | Line 14: | ||
* Bitumen Unit | * Bitumen Unit | ||
− | + | === Terminal Capacity === | |
* Crude Oil: | * Crude Oil: | ||
* Refined Products: | * Refined Products: | ||
− | + | === Crude Supply === | |
− | * The Refinery is processing | + | * The Refinery is processing [[Upper Zakum Crude Oil]] from Abu Dhabi and [[Arabian Light Crude Oil]] from Saudi Arabia. |
− | * Condensate from the | + | * Condensate from the [[Zamzama Gas Field]] is transported via the [[Karachi Multan Crude Oil Pipeline]] |
− | + | === Products Produced === | |
* - | * - | ||
− | + | === Projects === | |
* PARCO signed an agreement on Friday, January 25, 2008 with a consortium of China National Chemical Engineering Group Corporation (CNCEC) and Hyundai Engineering Company (HEC) of South Korea for the engineering, procurement and construction of US$ 132 million Diesel Hydrodesulphurization Plant at its 100,000 barrels per day Mid-Country Refinery at Mahmood Kot, Muzaffargarh. | * PARCO signed an agreement on Friday, January 25, 2008 with a consortium of China National Chemical Engineering Group Corporation (CNCEC) and Hyundai Engineering Company (HEC) of South Korea for the engineering, procurement and construction of US$ 132 million Diesel Hydrodesulphurization Plant at its 100,000 barrels per day Mid-Country Refinery at Mahmood Kot, Muzaffargarh. | ||
* The Engineering Design Specification (EDS) package for the Asphalt Plant has been awarded to an international contractor. The plant is designed to produce asphalt of international quality specifications and has the capacity to produce 500 M.Tons/day. | * The Engineering Design Specification (EDS) package for the Asphalt Plant has been awarded to an international contractor. The plant is designed to produce asphalt of international quality specifications and has the capacity to produce 500 M.Tons/day. | ||
− | + | === Other Information === | |
* - | * - | ||
− | + | === History === | |
* 2000 - Refinery commissioned | * 2000 - Refinery commissioned | ||
* 2011 - DHDS unit commissioned | * 2011 - DHDS unit commissioned | ||
* 2012 - Bitumen unit commissioned | * 2012 - Bitumen unit commissioned | ||
+ | * 2024 - Gunvor acquires TotalEnergies share | ||
− | + | === Links === | |
+ | # [[EIED Oil and Gas Projects]] | ||
+ | # [[Poerner Bitumen References]] | ||
# [http://www.ocac.org.pk/members.html Profile] from Oil Companies Advisory Committee | # [http://www.ocac.org.pk/members.html Profile] from Oil Companies Advisory Committee | ||
# [http://killajoules.wikidot.com/archive:dhds-project-close-out-meeting DHDS PROJECT CLOSE-OUT MEETING] | # [http://killajoules.wikidot.com/archive:dhds-project-close-out-meeting DHDS PROJECT CLOSE-OUT MEETING] | ||
# [http://killajoules.wikidot.com/archive:biturox-plant-successfully-running-at-parcos-refiner Biturox plant successfully running at Parco’s Refinery in Pakistan] | # [http://killajoules.wikidot.com/archive:biturox-plant-successfully-running-at-parcos-refiner Biturox plant successfully running at Parco’s Refinery in Pakistan] | ||
− | # [ | + | # [https://refiningnews.blogspot.com/2024/08/gunvor-acquires-totalenergies-shares-in.html Gunvor acquires TotalEnergies shares in Total Parco in Pakistan] |
− |
Latest revision as of 15:04, 14 August 2024
Contents
Summary Information
- Ownership: PARCO
- Website: http://www.parco.com.pk/
- Location: Mehmood Kot area of Multan
- Capacity: 5 million tons/annum & 100,000 bbl/day
- Nelson Complexity:
Refining Units
- Atmospheric distillation unit
- Vacuum distillation
- Diesel HDS Unit
- Bitumen Unit
Terminal Capacity
- Crude Oil:
- Refined Products:
Crude Supply
- The Refinery is processing Upper Zakum Crude Oil from Abu Dhabi and Arabian Light Crude Oil from Saudi Arabia.
- Condensate from the Zamzama Gas Field is transported via the Karachi Multan Crude Oil Pipeline
Products Produced
- -
Projects
- PARCO signed an agreement on Friday, January 25, 2008 with a consortium of China National Chemical Engineering Group Corporation (CNCEC) and Hyundai Engineering Company (HEC) of South Korea for the engineering, procurement and construction of US$ 132 million Diesel Hydrodesulphurization Plant at its 100,000 barrels per day Mid-Country Refinery at Mahmood Kot, Muzaffargarh.
- The Engineering Design Specification (EDS) package for the Asphalt Plant has been awarded to an international contractor. The plant is designed to produce asphalt of international quality specifications and has the capacity to produce 500 M.Tons/day.
Other Information
- -
History
- 2000 - Refinery commissioned
- 2011 - DHDS unit commissioned
- 2012 - Bitumen unit commissioned
- 2024 - Gunvor acquires TotalEnergies share