Difference between revisions of "Lufeng 13-1 and 13-2 Oil Fields"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: CNOOC * Country: China * Location: Eastern South China Sea * Production start: * Partners: * Type: Oil / Gas * Estimated Reserves: * Produ...") |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
* Operator: CNOOC | * Operator: CNOOC | ||
* Country: China | * Country: China | ||
Line 9: | Line 9: | ||
* Production Volume: | * Production Volume: | ||
− | + | === Description === | |
* The field utilises the FSO Nan Hai Sheng Kai and a production platform | * The field utilises the FSO Nan Hai Sheng Kai and a production platform | ||
* Lufeng 13-2 is a satellite which consists of a wellhead production platform, a 12-kilometer subsea pipeline and cables | * Lufeng 13-2 is a satellite which consists of a wellhead production platform, a 12-kilometer subsea pipeline and cables | ||
− | + | === Contractors === | |
− | * | + | * '''Sofec:''' Internal Disconnectable Turret for the FSO |
− | * | + | * '''COOEC:''' Wellhead Platform Upgrade |
− | * | + | * '''Swiber:''' Subsea installations |
− | * InterMoor: | + | * '''InterMoor:''' |
** Project management, engineering, procurement and installation for a new buoy turret mooring system for the upgraded Nanhai Sheng Kai FSOU in LF 13-2 field; and installation of a new 8-in. flexible flowline and riser between the buoy turret mooring system and the LF 13-2 wellhead platform | ** Project management, engineering, procurement and installation for a new buoy turret mooring system for the upgraded Nanhai Sheng Kai FSOU in LF 13-2 field; and installation of a new 8-in. flexible flowline and riser between the buoy turret mooring system and the LF 13-2 wellhead platform | ||
− | + | === History === | |
* 2005 - Lufeng 13-2 came on stream | * 2005 - Lufeng 13-2 came on stream | ||
* 2011 - LF 13-2 Adjustment Project Brought on Stream | * 2011 - LF 13-2 Adjustment Project Brought on Stream | ||
− | + | === Geology === | |
* | * | ||
− | + | === Links === | |
# [[Sofec FPSO References]] | # [[Sofec FPSO References]] | ||
# [[Jotun Platform References]] | # [[Jotun Platform References]] | ||
− | # [[Serimax Pipeline References]] | + | # [[Serimax Asia Pipeline References]] |
+ | # [[Shenzhen Chiwan Sembawang Engineering Platform References]] | ||
# [http://killajoules.wikidot.com/archive:first-permanent-mooring-work-for-intermoor-in-china First permanent mooring work for InterMoor in China] | # [http://killajoules.wikidot.com/archive:first-permanent-mooring-work-for-intermoor-in-china First permanent mooring work for InterMoor in China] | ||
# [http://www.cnoocltd.com/encnoocltd/newszx/news/2005/972.shtml CNOOC Ltd Announces Commercial Oil Production From Lufeng 13-2] | # [http://www.cnoocltd.com/encnoocltd/newszx/news/2005/972.shtml CNOOC Ltd Announces Commercial Oil Production From Lufeng 13-2] | ||
# [http://killajoules.wikidot.com/archive:lf-13-2-adjustment-project-brought-on-stream LF 13-2 Adjustment Project Brought on Stream] | # [http://killajoules.wikidot.com/archive:lf-13-2-adjustment-project-brought-on-stream LF 13-2 Adjustment Project Brought on Stream] |
Latest revision as of 12:54, 9 August 2024
Summary Information
- Operator: CNOOC
- Country: China
- Location: Eastern South China Sea
- Production start:
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
Description
- The field utilises the FSO Nan Hai Sheng Kai and a production platform
- Lufeng 13-2 is a satellite which consists of a wellhead production platform, a 12-kilometer subsea pipeline and cables
Contractors
- Sofec: Internal Disconnectable Turret for the FSO
- COOEC: Wellhead Platform Upgrade
- Swiber: Subsea installations
- InterMoor:
- Project management, engineering, procurement and installation for a new buoy turret mooring system for the upgraded Nanhai Sheng Kai FSOU in LF 13-2 field; and installation of a new 8-in. flexible flowline and riser between the buoy turret mooring system and the LF 13-2 wellhead platform
History
- 2005 - Lufeng 13-2 came on stream
- 2011 - LF 13-2 Adjustment Project Brought on Stream