Difference between revisions of "Gryphon Oil Field"

From A Barrel Full
Jump to navigation Jump to search
 
(2 intermediate revisions by the same user not shown)
Line 1: Line 1:
Summary Information
+
=== Summary Information ===
 
* Operator: Total  
 
* Operator: Total  
 
* Country: UK
 
* Country: UK
 
* Location: North Sea
 
* Location: North Sea
* Production start:  
+
* Production start: 1993
 
* Partners:  
 
* Partners:  
 
* Type: Oil / Gas
 
* Type: Oil / Gas
Line 9: Line 9:
 
* Production Volume:  
 
* Production Volume:  
  
+++ Description
+
=== Description ===
* The field was developed using the [[Gryphon FPSO]]
 
* The Tullich field has been developed as a tieback
 
* The [[Maclure Oil Field]] was developed via a single subsea gas-lifted well tied back to the FPSO
 
  
+++ Contractors
+
* The Gryphon field is in Quad 9 and is located approximately 201 miles north east of Aberdeen at a water depth of 112m. It is primarily in block 9/18b although a small portion extends into 9/18c.
* **Astano:** Construction of FPSO hull  
+
* The field was discovered in 1987 with first production in October 1993.
* **McNulty Offshore:** Construction of topsides
+
* Oil production peaked in 1995 ca. 50,000bbl/d.
 +
* It is serviced by the [[Gryphon FPSO | Gryphon Alpha floating production, storage and offloading facility (FPSO)]] which also has subsea tiebacks from '''Tullich''', [[Maclure Oil Field]] and '''Ballindalloch''' developments.
 +
* The oil is stored in cargo tanks in the hull and exported by tanker.
 +
* Gas is exported via the Leadon pipeline to the Beryl Alpha platform, where it is transported to shore via the [[Scottish Area Gas Evacuation (SAGE) Pipeline]].
  
+++ History
+
=== Contractors ===
 +
* '''Astano:''' Construction of FPSO hull
 +
* '''McNulty Offshore:''' Construction of topsides
 +
 
 +
=== History ===
 +
* 1987 - Gryphon filed discovered
 
* 1992 - Field development planned approved
 
* 1992 - Field development planned approved
 +
* 1993 - First oil produced
 
* 2002 - Development consent given for Tullich  
 
* 2002 - Development consent given for Tullich  
 
* 2002 - Maclure Oil Field started production
 
* 2002 - Maclure Oil Field started production
Line 26: Line 32:
 
* 2013 - Production resumes following repairs to the FPSO
 
* 2013 - Production resumes following repairs to the FPSO
 
* 2017 - Total acquires Maersk and becomes operator
 
* 2017 - Total acquires Maersk and becomes operator
 +
* 2018 - Approval granted for Ballindalloch
  
+++ Geology
+
=== Geology ===
 
*  
 
*  
  
+++ Links
+
=== Links ===
 
# [[UK Oil and Gas Fields by Approval Date]]
 
# [[UK Oil and Gas Fields by Approval Date]]
 
# [[List Of Oil Production Platforms In The UK]]
 
# [[List Of Oil Production Platforms In The UK]]
Line 38: Line 45:
 
# [http://killajoules.wikidot.com/archive:maersk-oil-uk-gryphon-fpso-back-in-production Maersk Oil UK Gryphon FPSO back in production]
 
# [http://killajoules.wikidot.com/archive:maersk-oil-uk-gryphon-fpso-back-in-production Maersk Oil UK Gryphon FPSO back in production]
 
# [https://abarrelfull.blogspot.com/2022/09/total-acquires-maersk-oil-for-745.html Total acquires Maersk Oil for $7.45 billion in a share and debt transaction]
 
# [https://abarrelfull.blogspot.com/2022/09/total-acquires-maersk-oil-for-745.html Total acquires Maersk Oil for $7.45 billion in a share and debt transaction]
 +
 +
[[category:Field]]
 +
[[category:UK]]
 +
[[category:Total]]

Latest revision as of 16:26, 30 June 2024

Summary Information

  • Operator: Total
  • Country: UK
  • Location: North Sea
  • Production start: 1993
  • Partners:
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • The Gryphon field is in Quad 9 and is located approximately 201 miles north east of Aberdeen at a water depth of 112m. It is primarily in block 9/18b although a small portion extends into 9/18c.
  • The field was discovered in 1987 with first production in October 1993.
  • Oil production peaked in 1995 ca. 50,000bbl/d.
  • It is serviced by the Gryphon Alpha floating production, storage and offloading facility (FPSO) which also has subsea tiebacks from Tullich, Maclure Oil Field and Ballindalloch developments.
  • The oil is stored in cargo tanks in the hull and exported by tanker.
  • Gas is exported via the Leadon pipeline to the Beryl Alpha platform, where it is transported to shore via the Scottish Area Gas Evacuation (SAGE) Pipeline.

Contractors

  • Astano: Construction of FPSO hull
  • McNulty Offshore: Construction of topsides

History

  • 1987 - Gryphon filed discovered
  • 1992 - Field development planned approved
  • 1993 - First oil produced
  • 2002 - Development consent given for Tullich
  • 2002 - Maclure Oil Field started production
  • 2005 - Maersk acquires the field from Kerr-McGee
  • 2011 - Field temporarily shutdown after FPSO is damaged in storm
  • 2013 - Production resumes following repairs to the FPSO
  • 2017 - Total acquires Maersk and becomes operator
  • 2018 - Approval granted for Ballindalloch

Geology

Links

  1. UK Oil and Gas Fields by Approval Date
  2. List Of Oil Production Platforms In The UK
  3. List Of Oil and Gas Production Platforms In The UK
  4. The A.P. Moller - Maersk Group acquires UK North Sea oil and gas interests
  5. Maersk Oil’s Gryphon FPSO to be docked for repairs
  6. Maersk Oil UK Gryphon FPSO back in production
  7. Total acquires Maersk Oil for $7.45 billion in a share and debt transaction