(Created page with "Summary Information * Operator: Total * Country: Brunei * Location: Block B offshore * Production start: 1999 * Partners: * Type: Gas & Condensate * Estimated Reserves: * P...")
 
 
(One intermediate revision by the same user not shown)
Line 11: Line 11:
 
+++ Description
 
+++ Description
 
* Offshore facilities
 
* Offshore facilities
* Two production wellhead platforms: MLJ-1 and MLJ-2.
+
** Two production wellhead platforms: MLJ-1 and MLJ-2.
* 2.5 km / 12” MLJ-2/MLJ-1 sea pipeline.
+
** 2.5 km / 12” MLJ-2/MLJ-1 sea pipeline.
* 85 km / 18” MLJ-1/OPP sea pipeline.
+
** 85 km / 18” MLJ-1/OPP sea pipeline.
 
* Onshore facilities
 
* Onshore facilities
* Reception of well fluids in slugcatcher (800 m3).
+
** Reception of well fluids in slugcatcher (800 m3).
* Separation of gas and liquids.
+
** Separation of gas and liquids.
* Gas processed to remove mercury and CO2.
+
** Gas processed to remove mercury and CO2.
* Delivery to [[[Brunei Lng Terminal | BLNG]]] (distance 700 m).
+
** Delivery to [[Brunei LNG Terminal | BLNG]] (distance 700 m).
* LNG is exported to LNG ship via two 16” line on a 4.5 km Jetty.
+
** LNG is exported to LNG ship via two 16” line on a 4.5 km Jetty.
* Liquid processed to separate and stabilise condensate and water.
+
** Liquid processed to separate and stabilise condensate and water.
* Delivery to BSP Seria Crude Oil Terminal (SCOT, distance 17 km). Crude oil  is exported to oil tanker via Single Buoy Mooring (SBM).
+
** Delivery to BSP Seria Crude Oil Terminal (SCOT, distance 17 km). Crude oil  is exported to oil tanker via Single Buoy Mooring (SBM).
  
 
+++ Contractors
 
+++ Contractors
 
* **Technip:**  
 
* **Technip:**  
* EPCC - Onshore Processing plant
+
** EPCC - Onshore Processing plant
* Engineering, procurement, supply, construction and commissioning (EPSCC) of a new onshore pipeline, in order to transport Maharaja Lela & Jamalulalam South (MLJS) gas
+
** Engineering, procurement, supply, construction and commissioning (EPSCC) of a new onshore pipeline, in order to transport Maharaja Lela & Jamalulalam South (MLJS) gas
 
* **Vallourec:** Supply of premium pipes the majority of which in high alloyed, corrosion-resistant grades, threaded with latest premium connections
 
* **Vallourec:** Supply of premium pipes the majority of which in high alloyed, corrosion-resistant grades, threaded with latest premium connections
 
* SapuraAcergy: Provision of subsea services  
 
* SapuraAcergy: Provision of subsea services  

Latest revision as of 13:39, 11 September 2023

Summary Information

  • Operator: Total
  • Country: Brunei
  • Location: Block B offshore
  • Production start: 1999
  • Partners:
  • Type: Gas & Condensate
  • Estimated Reserves:
  • Production Volume:

+++ Description

  • Offshore facilities
    • Two production wellhead platforms: MLJ-1 and MLJ-2.
    • 2.5 km / 12” MLJ-2/MLJ-1 sea pipeline.
    • 85 km / 18” MLJ-1/OPP sea pipeline.
  • Onshore facilities
    • Reception of well fluids in slugcatcher (800 m3).
    • Separation of gas and liquids.
    • Gas processed to remove mercury and CO2.
    • Delivery to BLNG (distance 700 m).
    • LNG is exported to LNG ship via two 16” line on a 4.5 km Jetty.
    • Liquid processed to separate and stabilise condensate and water.
    • Delivery to BSP Seria Crude Oil Terminal (SCOT, distance 17 km). Crude oil is exported to oil tanker via Single Buoy Mooring (SBM).

+++ Contractors

  • **Technip:**
    • EPCC - Onshore Processing plant
    • Engineering, procurement, supply, construction and commissioning (EPSCC) of a new onshore pipeline, in order to transport Maharaja Lela & Jamalulalam South (MLJS) gas
  • **Vallourec:** Supply of premium pipes the majority of which in high alloyed, corrosion-resistant grades, threaded with latest premium connections
  • SapuraAcergy: Provision of subsea services

+++ History

  • 1999 - Production started
  • 2010 - Southern extension discovered
  • 2014 - Technip awarded pipeline contract

+++ Geology

  • The multiple reservoir levels are situated at the downthrown side of a major down-to-basin fault.

+++ Links

  1. Maharaja Lela - Jamalul Alam
  2. Maharaja, Technip
  3. FLASH GAS COMPRESSOR OPP PLANT, World Bank
  4. Serimax Asia Pipeline References
  5. Elf Aquitaine announces production start-up Of Maharaja-Lela field in Brunei
  6. Total Brunei new gas and condensate discovery in offshore Block B
  7. Technip awarded contract in Brunei, reinforcing its presence in the country
  8. Vallourec awarded important offshore contract by Total for ML-South Project in Brunei
  9. Sapurakencana Petroleum Bags 5 New Contracts Worth Rm 1 Billion (US$312 Million)