Difference between revisions of "Villa de Reyes Gas Pipeline Project"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
| (2 intermediate revisions by the same user not shown) | |||
| Line 12: | Line 12: | ||
* Spanning more than 420 km (261 miles) from Tula, Hidalgo, and ends in Villa de Reyes, San Luis Potosí, the completed Villa de Reyes Pipeline will transport natural gas to power generation facilities in Central Mexico. | * Spanning more than 420 km (261 miles) from Tula, Hidalgo, and ends in Villa de Reyes, San Luis Potosí, the completed Villa de Reyes Pipeline will transport natural gas to power generation facilities in Central Mexico. | ||
* It will have capacity of 886 million cubic feet per day | * It will have capacity of 886 million cubic feet per day | ||
| + | * It will interconnect with the [[Tula Gas Pipeline Project]] | ||
=== History === | === History === | ||
| − | * - | + | * 2022 - TC Energy and CFE formed a JV to own the pipelines |
=== Other Information === | === Other Information === | ||
| Line 20: | Line 21: | ||
=== Links === | === Links === | ||
| − | # [] | + | # [https://abarrelfull.blogspot.com/2023/09/tc-energy-and-mexicos-comision-federal.html TC Energy And Mexico’s Comisión Federal De Electricidad Announce A First-Of-Its-Kind Strategic Partnership To Develop World-Class Energy Infrastructure In Mexico] |
[[category:Pipeline]] | [[category:Pipeline]] | ||
| − | [[category: | + | [[category:Mexico]] |
| − | [[category: | + | [[category:TC Energy]] |
Latest revision as of 07:12, 20 September 2023
Summary Information
- Source: Tula, Hidalgo
- Destination: Villa de Reyes
- Ownership: TC Energy
- Website: https://www.tcenergy.com/
- Length: 420 km (261 miles)
- Capacity: 886 million cubic feet per day
- Status: Planned
Details
- Spanning more than 420 km (261 miles) from Tula, Hidalgo, and ends in Villa de Reyes, San Luis Potosí, the completed Villa de Reyes Pipeline will transport natural gas to power generation facilities in Central Mexico.
- It will have capacity of 886 million cubic feet per day
- It will interconnect with the Tula Gas Pipeline Project
History
- 2022 - TC Energy and CFE formed a JV to own the pipelines
Other Information
- -