Difference between revisions of "Corinth LNG Terminal"
		
		
		
		
		Jump to navigation
		Jump to search
		
Abarrelfull (talk | contribs)  | 
				Abarrelfull (talk | contribs)   | 
				||
| (5 intermediate revisions by the same user not shown) | |||
| Line 9: | Line 9: | ||
=== Brief Description ===  | === Brief Description ===  | ||
* Dioriga Gas will be a near shore LNG (Liquified Natural Gas) import terminal based on the Floating Storage and Regasification Unit (FSRU) configuration.  | * Dioriga Gas will be a near shore LNG (Liquified Natural Gas) import terminal based on the Floating Storage and Regasification Unit (FSRU) configuration.  | ||
| + | * It will have a maximum storage capacity up to 210.000 m3 LNG  | ||
| + | * It includes a jetty/ trestle, including a central platform, breasting and mooring dolphins, for the permanent berthing of the FSRU at about 150 m from the coastline and at depths of up to 25 m Mean Sea Level  | ||
=== Technical Details ===  | === Technical Details ===  | ||
| − | * Storage capacity:    | + | * Storage capacity: 210.000 m3 LNG  | 
| − | * Unloading capacity:  | + | * Unloading capacity: 10,000 m3/hr  | 
| − | * Send out capacity:  | + | * Send out capacity: 132,000 MWh/day  | 
* Constructor:  | * Constructor:  | ||
* Licensor:  | * Licensor:  | ||
| + | |||
=== Ongoing Projects/Project Status ===  | === Ongoing Projects/Project Status ===  | ||
| − | + | * We expect the project to be completed in [[LNG Terminal Projects to be Completed in 2024 | 2024]]  | |
=== Suppliers / Customers ===  | === Suppliers / Customers ===  | ||
* Suppliers:  | * Suppliers:  | ||
| − | * Customers:  | + | * Customers:    | 
| + | ** The Bulgarian and other markets will be supplied via the [[Greece-Bulgaria Interconnector ICGB]]  | ||
| + | |||
=== History ===  | === History ===  | ||
| − | *   | + | * 2021 - Agreement signed for connection to grid  | 
| + | * 2022 - Non binding market test process completed  | ||
| + | * 2023 - Second phase of Market test completed  | ||
| + | |||
=== Other Information ===  | === Other Information ===  | ||
| Line 32: | Line 40: | ||
=== Links ===  | === Links ===  | ||
# [https://lng-news.blogspot.com/2021/06/signing-of-advanced-reservation-of.html Signing of Advanced Reservation of Capacity Agreement (ARCA) between DESFA and Dioriga Gas]  | # [https://lng-news.blogspot.com/2021/06/signing-of-advanced-reservation-of.html Signing of Advanced Reservation of Capacity Agreement (ARCA) between DESFA and Dioriga Gas]  | ||
| + | # [https://lng-news.blogspot.com/2022/01/the-first-phase-of-market-test-for.html The First phase of the Market Test for Dioriga Gas was successfully completed]  | ||
| + | # [https://lng-news.blogspot.com/2023/02/second-phase-of-market-test-for-corinth.html Second phase of Market test for Corinth FSRU]  | ||
| + | |||
| + | [[category:LNG]]  | ||
| + | [[category:Greece]]  | ||
Latest revision as of 11:38, 10 February 2023
Contents
Summary Information
- Ownership: Dioriga Gas
 - Website: https://dioriga.gr/
 - Location: Corinth, Greece
 - Capacity: million tons/annum
 - Status: Planning
 
Brief Description
- Dioriga Gas will be a near shore LNG (Liquified Natural Gas) import terminal based on the Floating Storage and Regasification Unit (FSRU) configuration.
 - It will have a maximum storage capacity up to 210.000 m3 LNG
 - It includes a jetty/ trestle, including a central platform, breasting and mooring dolphins, for the permanent berthing of the FSRU at about 150 m from the coastline and at depths of up to 25 m Mean Sea Level
 
Technical Details
- Storage capacity: 210.000 m3 LNG
 - Unloading capacity: 10,000 m3/hr
 - Send out capacity: 132,000 MWh/day
 - Constructor:
 - Licensor:
 
Ongoing Projects/Project Status
- We expect the project to be completed in 2024
 
Suppliers / Customers
- Suppliers:
 - Customers:
- The Bulgarian and other markets will be supplied via the Greece-Bulgaria Interconnector ICGB
 
 
History
- 2021 - Agreement signed for connection to grid
 - 2022 - Non binding market test process completed
 - 2023 - Second phase of Market test completed
 
Other Information
-