Difference between revisions of "Greater Tortue FLNG Project"
		
		
		
		
		Jump to navigation
		Jump to search
		
Abarrelfull (talk | contribs)  | 
				Abarrelfull (talk | contribs)   | 
				||
| (12 intermediate revisions by the same user not shown) | |||
| Line 1: | Line 1: | ||
=== Summary Information ===  | === Summary Information ===  | ||
| − | * Ownership:    | + | * Ownership: BP / Kosmos  | 
| − | * Website:    | + | * Website: https://www.bp.com/  | 
| − | * Location:     | + | * Location:  Mauritania and Senegal  | 
| − | * Capacity: million tons/annum    | + | * Capacity: 2.4 million tons/annum    | 
| − | * Status:   | + | * Status: In Operation  | 
=== Brief Description ===  | === Brief Description ===  | ||
| − | * -  | + | * The vessel is a converted LNG carrier, with a planned capacity of 2.4 mtpa  | 
| + | * A second phase will use a gravity-based structure (GBS) with total capacity of between 2.5-3.0 million tonnes per annum.  | ||
=== Technical Details ===  | === Technical Details ===  | ||
* Storage capacity:  | * Storage capacity:  | ||
| − | * Constructor:  | + | * Constructor:    | 
| − | * Licensor:  | + | ** **Keppel:** Refurbishment and conversion  | 
| + | * Licensor: [[LNG Terminals Using Black and Veatch Technology | Black & Veatch]]  | ||
=== Ongoing Projects/Project Status ===  | === Ongoing Projects/Project Status ===  | ||
| Line 19: | Line 21: | ||
=== Suppliers / Customers ===  | === Suppliers / Customers ===  | ||
| − | * Suppliers:    | + | * Suppliers: Gas is to be supplied from the [[Tortue Ahmeyim Oil and Gas Fields]]  | 
| − | * Customers:    | + | * Customers: BP will purchase all the gas produced in phase I for an initial term of up to 20 years  | 
=== History ===  | === History ===  | ||
| − | * -  | + | * 2018 - Golar LNG receives firm order for the vessel  | 
| + | * 2020 - BP Gas Marketing signed an SPA is for 2.45 million tonnes per annum (MTPA) of liquified natural gas (LNG) from Phase 1 for an initial term of up to 20 years.  | ||
| + | * 2023 - Development concept for the second phase of the project launched  | ||
| + | * 2024 - The FPSO arrived on the field  | ||
| + | * 2025 - First gas production  | ||
=== Other Information ===  | === Other Information ===  | ||
| Line 29: | Line 35: | ||
=== Links ===  | === Links ===  | ||
| − | #   | + | # [http://killajoules.wikidot.com/archive:golar-lng-receives-limited-notice-to-proceed-for-an Golar LNG receives Limited Notice to Proceed for an FLNG vessel for Phase 1 of the Greater Tortue / Ahmeyim Project, West Africa]  | 
| + | # [http://killajoules.wikidot.com/archive:keppel-receives-limited-notice-to-proceed-for-gimi-f Keppel Receives Limited Notice To Proceed For Gimi FLNG]  | ||
| + | # [http://killajoules.wikidot.com/archive:black-veatch-receives-limited-notice-to-proceed-on-c Black & Veatch receives limited notice to proceed on conversion of FLNG Vessel for BP field development work]  | ||
| + | # [https://abarrelfull.blogspot.com/2023/01/greater-tortue-ahmeyim-sale-and.html Greater Tortue Ahmeyim Sale and Purchase Agreement Signed with BP Gas Marketing]  | ||
| + | # [https://lng-news.blogspot.com/2023/03/bp-and-partners-progress-concept-for.html bp and partners progress concept for Greater Tortue Ahmeyim (GTA) Phase 2 to next phase of evaluation]  | ||
| + | # [https://a-barrel-full.blogspot.com/2024/06/gta-lng-project-reaches-significant.html GTA LNG project reaches significant milestone with arrival of FPSO vessel]  | ||
| + | # [https://lng-news.blogspot.com/2025/01/bp-flows-first-gas-at-greater-tortue.html bp flows first gas at Greater Tortue Ahmeyim LNG project]  | ||
[[category:LNG]]  | [[category:LNG]]  | ||
| − | [[category:  | + | [[category:Mauritania]]  | 
| + | [[category:Senegal]]  | ||
[[category:BP]]  | [[category:BP]]  | ||
[[category:Kosmos]]  | [[category:Kosmos]]  | ||
Latest revision as of 16:17, 3 January 2025
Contents
Summary Information
- Ownership: BP / Kosmos
 - Website: https://www.bp.com/
 - Location: Mauritania and Senegal
 - Capacity: 2.4 million tons/annum
 - Status: In Operation
 
Brief Description
- The vessel is a converted LNG carrier, with a planned capacity of 2.4 mtpa
 - A second phase will use a gravity-based structure (GBS) with total capacity of between 2.5-3.0 million tonnes per annum.
 
Technical Details
- Storage capacity:
 - Constructor:
- **Keppel:** Refurbishment and conversion
 
 - Licensor: Black & Veatch
 
Ongoing Projects/Project Status
- Commissioning is expected in 2023
 
Suppliers / Customers
- Suppliers: Gas is to be supplied from the Tortue Ahmeyim Oil and Gas Fields
 - Customers: BP will purchase all the gas produced in phase I for an initial term of up to 20 years
 
History
- 2018 - Golar LNG receives firm order for the vessel
 - 2020 - BP Gas Marketing signed an SPA is for 2.45 million tonnes per annum (MTPA) of liquified natural gas (LNG) from Phase 1 for an initial term of up to 20 years.
 - 2023 - Development concept for the second phase of the project launched
 - 2024 - The FPSO arrived on the field
 - 2025 - First gas production
 
Other Information
- -
 
Links
- Golar LNG receives Limited Notice to Proceed for an FLNG vessel for Phase 1 of the Greater Tortue / Ahmeyim Project, West Africa
 - Keppel Receives Limited Notice To Proceed For Gimi FLNG
 - Black & Veatch receives limited notice to proceed on conversion of FLNG Vessel for BP field development work
 - Greater Tortue Ahmeyim Sale and Purchase Agreement Signed with BP Gas Marketing
 - bp and partners progress concept for Greater Tortue Ahmeyim (GTA) Phase 2 to next phase of evaluation
 - GTA LNG project reaches significant milestone with arrival of FPSO vessel
 - bp flows first gas at Greater Tortue Ahmeyim LNG project