Difference between revisions of "Hyundai Daesan Refinery"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "Summary Information Ownership: Hyundai Oilbank Website: http://www.oilbank.co.kr/ Location: South Korea Capacity: 32.5 million tons/annum & 650,000 bbl/day Nelson Complexity:...")
 
 
(7 intermediate revisions by the same user not shown)
Line 1: Line 1:
−
Summary Information
+
=== Summary Information ===
−
Ownership: Hyundai Oilbank
+
* Ownership: Hyundai Oilbank
−
Website: http://www.oilbank.co.kr/
+
* Website: http://www.oilbank.co.kr/
−
Location: South Korea
+
* Location: South Korea
−
Capacity: 32.5 million tons/annum & 650,000 bbl/day
+
* Capacity: 32.5 million tons/annum & 650,000 bbl/day
−
Nelson Complexity:
+
* Nelson Complexity:
−
Refining Depth:
+
* Refining Depth:
−
Brief Description
+
=== Brief Description ===
 +
* A very large,  highly complex refinery
 +
=== Refining Units ===
 +
* Atmospheric Distillation, 390,000 BPSD
 +
* VDU (vacuum distillation unit) 60,000 BPSD
 +
* Naphtha reforming unit 26,000 BPSD
 +
* Kerosene hydro-treating unit 30,000 BPSD
 +
* Kerosene and Diesel hydro-treating unit 26,000 BPSD
 +
* Diesel hydro-treating unit 58,000 BPSD
 +
* Asphalt cokes (delayed coking unit) 33,000 BPSD
 +
* Hydrocracking unit 31,000 BPSD
 +
* Sulfur Recovery Unit 360 Ton/day
 +
* Resid Upgrader
 +
* Hydrocracking Unit
 +
* Delayed Coking Unit
 +
* Hydrogen Manufacturing Unit
 +
* B T X (Aromatics) facilities 455,000 Ton/year
 +
=== Terminal Capacity ===
 +
* Crude Oil: 5,530,000 BBL
 +
* Refined Products: 6,980,000 BBL
 +
 
 +
=== Crude Supply ===
 
-
 
-
−
Refining Units
+
=== Products Produced ===
−
Atmospheric Distillation, 390,000 BPSD
+
* Gasoline, Diesel, LPG, Jet, Bunker fuels.
−
VDU (vacuum distillation unit) 60,000 BPSD
+
=== Ongoing / Completed Projects ===
−
Naphtha reforming unit 26,000 BPSD
+
* The [[Hyundai Daesan Refinery Expansion Project]] was completed in 2018
−
Kerosene hydro-treating unit 30,000 BPSD
+
* The [[Hyundai Daesan Refinery Upgrade Project]] was completed in 2011
−
Kerosene and Diesel hydro-treating unit 26,000 BPSD
+
 
−
Diesel hydro-treating unit 58,000 BPSD
+
=== Other Information ===
−
Asphalt cokes (delayed coking unit) 33,000 BPSD
 
−
Hydrocracking unit 31,000 BPSD
 
−
Sulfur Recovery Unit 360 Ton/day
 
−
Resid Upgrader
 
−
Hydrocracking Unit
 
−
Delayed Coking Unit
 
−
Hydrogen Manufacturing Unit
 
−
Terminal Capacity
 
−
Crude Oil: 5,530,000 BBL
 
−
Refined Products: 6,980,000 BBL
 
−
B T X (Aromatics) facilities 455,000 Ton/year
 
−
Crude Supply
 
 
-
 
-
−
Products Produced
+
=== History ===
−
Gasoline, Diesel, LPG, Jet, Bunker fuels.
+
* 1978 - Refinery operations began
−
Ongoing Projects
+
* 1988 - Capacity expanded to 60,000 bpd
−
The Hyundai Daesan Refinery Expansion Project was completed in 2018
+
* 1996 - Capacity expanded to 200,000 bpd
−
Hyundai Daesan Refinery Upgrade Project
+
* 2004 - Foster Wheeler Secures Project Management Consultancy Contract for Clean Fuels Upgrade Project
−
Other Information
+
* 2005 - Diesel desulphurisation complex commissioned
−
-
+
* 2018 - Refinery expanded to 650,000 bpd
−
History
+
* 2019 - Saudi Aramco buys a 17% stake in the business
−
1996 - Capacity expanded to 200,000 bpd
+
 
−
2004 - Foster Wheeler Secures Project Management Consultancy Contract for Clean Fuels Upgrade Project
+
=== Links ===
−
2005 - Diesel desulphurisation complex commissioned
+
# [[Dupont Refinery Project References]]
−
2018 - Refinery expanded to 650,000 bpd
+
# [[Technip PMC Refining References]]
−
Relevant Links
+
# [http://www.oilbank.co.kr/english/businessdomain/refining/crude.html Refinery Webpage]
−
Technip PMC Refining References
+
# [http://killajoules.wikidot.com/archive:foster-wheeler-secures-project-management-consultanc Foster Wheeler Secures Project Management Consultancy Contract for Clean Fuels Upgrade Project in Korea]
−
Refinery Webpage
+
# [https://abarrelfull.blogspot.com/2021/03/saudi-aramco-to-acquire-stake-in-south.html Saudi Aramco to acquire stake in South Korean Hyundai Oilbank]
−
Foster Wheeler Secures Project Management Consultancy Contract for Clean Fuels Upgrade Project in Korea
+
 
 +
[[Category:Refinery]]
 +
[[Category:South Korea]]
 +
[[Category:Saudi Aramco]]

Latest revision as of 12:07, 22 March 2021

Summary Information

  • Ownership: Hyundai Oilbank
  • Website: http://www.oilbank.co.kr/
  • Location: South Korea
  • Capacity: 32.5 million tons/annum & 650,000 bbl/day
  • Nelson Complexity:
  • Refining Depth:

Brief Description

  • A very large, highly complex refinery

Refining Units

  • Atmospheric Distillation, 390,000 BPSD
  • VDU (vacuum distillation unit) 60,000 BPSD
  • Naphtha reforming unit 26,000 BPSD
  • Kerosene hydro-treating unit 30,000 BPSD
  • Kerosene and Diesel hydro-treating unit 26,000 BPSD
  • Diesel hydro-treating unit 58,000 BPSD
  • Asphalt cokes (delayed coking unit) 33,000 BPSD
  • Hydrocracking unit 31,000 BPSD
  • Sulfur Recovery Unit 360 Ton/day
  • Resid Upgrader
  • Hydrocracking Unit
  • Delayed Coking Unit
  • Hydrogen Manufacturing Unit
  • B T X (Aromatics) facilities 455,000 Ton/year

Terminal Capacity

  • Crude Oil: 5,530,000 BBL
  • Refined Products: 6,980,000 BBL

Crude Supply

-

Products Produced

  • Gasoline, Diesel, LPG, Jet, Bunker fuels.

Ongoing / Completed Projects

Other Information

-

History

  • 1978 - Refinery operations began
  • 1988 - Capacity expanded to 60,000 bpd
  • 1996 - Capacity expanded to 200,000 bpd
  • 2004 - Foster Wheeler Secures Project Management Consultancy Contract for Clean Fuels Upgrade Project
  • 2005 - Diesel desulphurisation complex commissioned
  • 2018 - Refinery expanded to 650,000 bpd
  • 2019 - Saudi Aramco buys a 17% stake in the business

Links

  1. Dupont Refinery Project References
  2. Technip PMC Refining References
  3. Refinery Webpage
  4. Foster Wheeler Secures Project Management Consultancy Contract for Clean Fuels Upgrade Project in Korea
  5. Saudi Aramco to acquire stake in South Korean Hyundai Oilbank