Difference between revisions of "Cronos Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (→Links) |
Abarrelfull (talk | contribs) |
||
| Line 1: | Line 1: | ||
=== Summary Information === | === Summary Information === | ||
| − | * Operator: | + | * Operator: ENI |
| − | * Country: | + | * Country: Cyprus |
| − | * Location: | + | * Location: Block 6, Offshore |
| − | * Production start: | + | * Production start: Expected 2028 |
| − | * Partners: | + | * Partners: ENI 50%, TotalEnergies 50% |
| − | * Type: | + | * Type: Gas |
| − | * Estimated Reserves: | + | * Estimated Reserves: 3 TCF |
* Production Volume: | * Production Volume: | ||
| Line 28: | Line 28: | ||
[[category:Field]] | [[category:Field]] | ||
| − | [[category: | + | [[category:Cyprus]] |
| − | [[category: | + | [[category:ENI]] |
Revision as of 15:07, 6 October 2026
Summary Information
- Operator: ENI
- Country: Cyprus
- Location: Block 6, Offshore
- Production start: Expected 2028
- Partners: ENI 50%, TotalEnergies 50%
- Type: Gas
- Estimated Reserves: 3 TCF
- Production Volume:
Description
- The project will bring to production the gas volumes from Cronos field, in Block 6, which holds more than 3 Tcf of gas initially in place (GIIP).
- Production is expected to reach a plateau of 500 mmscf/d;
- gas will be transported and processed in existing Zohr Gas Field facilities, in Egypt, then transferred and liquefied in Damietta SEGAS LNG Terminal for export as LNG to international markets, primarily Europe.
Contractors
- -
History
- 2026 - ENI announced FID