Difference between revisions of "Cronos Gas Field"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "=== Summary Information === * Operator: * Country: * Location: * Production start: * Partners: * Type: Oil / Gas * Estimated Reserves: * Production Volume: === Descrip...")
 
Line 10: Line 10:
  
 
=== Description ===
 
=== Description ===
−
*  
+
* The project will bring to production the gas volumes from Cronos field, in Block 6, which holds more than 3 Tcf of gas initially in place (GIIP).
 +
* Production is expected to reach a plateau of 500 mmscf/d;
 +
* gas will be transported and processed in existing [[Zohr Gas Field]] facilities, in Egypt, then transferred and liquefied in [[Damietta SEGAS LNG Terminal]] for export as LNG to international markets, primarily Europe.
  
 
=== Contractors ===
 
=== Contractors ===

Revision as of 15:04, 6 October 2026

Summary Information

  • Operator:
  • Country:
  • Location:
  • Production start:
  • Partners:
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • The project will bring to production the gas volumes from Cronos field, in Block 6, which holds more than 3 Tcf of gas initially in place (GIIP).
  • Production is expected to reach a plateau of 500 mmscf/d;
  • gas will be transported and processed in existing Zohr Gas Field facilities, in Egypt, then transferred and liquefied in Damietta SEGAS LNG Terminal for export as LNG to international markets, primarily Europe.

Contractors

  • -

History

Geology

Links