Difference between revisions of "Woodside Louisiana LNG Export Terminal Project"
		
		
		
		
		Jump to navigation
		Jump to search
		
Abarrelfull (talk | contribs)  | 
				Abarrelfull (talk | contribs)   | 
				||
| (6 intermediate revisions by the same user not shown) | |||
| Line 1: | Line 1: | ||
=== Summary Information ===  | === Summary Information ===  | ||
| − | * Ownership:   | + | * Ownership: Woodside  | 
| − | * Website: https://www.  | + | * Website: https://www.woodside.com/  | 
* Location: Calcasieu River, south of Lake Charles, Louisiana  | * Location: Calcasieu River, south of Lake Charles, Louisiana  | ||
* Capacity: 27 million tons/annum    | * Capacity: 27 million tons/annum    | ||
| Line 14: | Line 14: | ||
* Storage capacity:  | * Storage capacity:  | ||
* Constructor:    | * Constructor:    | ||
| − | ** Bechtel: lump-sum turn key engineering, procurement and construction contract  | + | ** '''Bechtel:''' lump-sum turn key engineering, procurement and construction contract  | 
| − | * Licensor:  | + | ** '''Baker Hughes:'''   | 
| + | * Licensor: '''Chart Industries''' eight main refrigeration compressors driven by LM6000PF+ gas turbines and eight expander-compressors  | ||
=== Ongoing Projects/Project Status ===  | === Ongoing Projects/Project Status ===  | ||
| − | * Construction has   | + | * Construction has begun in 2022 and commissioning is expected in [[LNG Terminal Projects to be Completed in 2025 | 2025]]  | 
=== Suppliers / Customers ===  | === Suppliers / Customers ===  | ||
| Line 33: | Line 34: | ||
* 2021 - Tellurian signed sales contracts with Gunvor and Vitol  | * 2021 - Tellurian signed sales contracts with Gunvor and Vitol  | ||
* 2022 - Construction of the facility started  | * 2022 - Construction of the facility started  | ||
| + | * 2024 - Woodside agreed to buy the project  | ||
=== Other Information ===  | === Other Information ===  | ||
| Line 44: | Line 46: | ||
# [https://lng-news.blogspot.com/2021/06/tellurian-and-vitol-sign-10-year-lng_4.html Tellurian and Vitol sign 10-year LNG agreement for 3 mtpa]  | # [https://lng-news.blogspot.com/2021/06/tellurian-and-vitol-sign-10-year-lng_4.html Tellurian and Vitol sign 10-year LNG agreement for 3 mtpa]  | ||
# [https://lng-news.blogspot.com/2022/03/tellurians-driftwood-lng-begins.html Tellurian’s Driftwood LNG Begins Construction]  | # [https://lng-news.blogspot.com/2022/03/tellurians-driftwood-lng-begins.html Tellurian’s Driftwood LNG Begins Construction]  | ||
| + | # [https://lng-news.blogspot.com/2024/08/woodside-to-acquire-tellurian-and.html Woodside to Acquire Tellurian and Driftwood LNG]  | ||
| + | # [https://lng-news.blogspot.com/2025/01/bechtel-and-woodside-place-woodside.html Bechtel and Woodside Place Woodside Louisiana LNG Phase 1 Order to Chart Industries]  | ||
| + | # [https://lng-news.blogspot.com/2025/01/baker-hughes-secures-liquefaction.html Baker Hughes Secures Liquefaction Equipment Order for Woodside Louisiana LNG]  | ||
| + | |||
| + | [[category:LNG]]  | ||
| + | [[category:USA]]  | ||
| + | [[category:Woodside]]  | ||
Latest revision as of 16:16, 6 January 2025
Contents
Summary Information
- Ownership: Woodside
 - Website: https://www.woodside.com/
 - Location: Calcasieu River, south of Lake Charles, Louisiana
 - Capacity: 27 million tons/annum
 - Status: Planned
 
Brief Description
- The LNG Facility, includes five LNG plant facilities to liquefy natural gas, three tanks to store the LNG, LNG carrier loading/berthing facilities (Marine Facility), and other utilities
 - Construction and operation of about 96 miles of pipeline, three new compressor stations, and 15 new meter stations.
 
Technical Details
- Storage capacity:
 - Constructor:
- Bechtel: lump-sum turn key engineering, procurement and construction contract
 - Baker Hughes:
 
 - Licensor: Chart Industries eight main refrigeration compressors driven by LM6000PF+ gas turbines and eight expander-compressors
 
Ongoing Projects/Project Status
- Construction has begun in 2022 and commissioning is expected in 2025
 
Suppliers / Customers
- Suppliers: The Driftwood Pipeline will have interconnects with the ANR Pipeline Company, Cameron Pipeline, Creole Trail Pipeline, Tennessee Gas Pipeline, Texas Eastern Transmission Gas Pipeline and Trunkline Gas Company Pipeline
 - Customers:
- Vitol - 3mtpa
 - Gunvor - 3mtpa
 - Total - 2.5mtpa
 
 
History
- 2017 - Bechtel awarded construction contracts
 - 2019 - The final environmental impact assessment was completed
 - 2019 - Total becomes a shareholder and signs gas purchase agreements
 - 2021 - Tellurian signed sales contracts with Gunvor and Vitol
 - 2022 - Construction of the facility started
 - 2024 - Woodside agreed to buy the project
 
Other Information
- -
 
Links
- Bechtel to Deliver 27.6 MTPA Driftwood LNG Project for Tellurian
 - Total further commits to Tellurian-led Driftwood LNG project through 2.5 Mtpa of LNG offtake and equity investments
 - Final Environmental Impact Statement- Driftwood LNG, LLC and Driftwood Pipeline, LLC, collectively Driftwood
 - Tellurian and Gunvor sign 10-year LNG agreement for 3 mtpa
 - Tellurian and Vitol sign 10-year LNG agreement for 3 mtpa
 - Tellurian’s Driftwood LNG Begins Construction
 - Woodside to Acquire Tellurian and Driftwood LNG
 - Bechtel and Woodside Place Woodside Louisiana LNG Phase 1 Order to Chart Industries
 - Baker Hughes Secures Liquefaction Equipment Order for Woodside Louisiana LNG