Difference between revisions of "Rovuma LNG Project"

From A Barrel Full
Jump to navigation Jump to search
 
(4 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
=== Summary Information ===
 
=== Summary Information ===
  
* Ownership:  
+
* Ownership: (ExxonMobil, Eni and CNPC) 70%, ENH - 10%, Galp- 10% and Kogas - 10%
 
* Website:  
 
* Website:  
 
* Location: Mozambique
 
* Location: Mozambique
 
* Capacity: 18 million tons/annum  
 
* Capacity: 18 million tons/annum  
* Status: (In Operation / Planned / Under Construction)
+
* Status: Under Construction
  
 
=== Brief Description ===
 
=== Brief Description ===
 
* The 18-mtpa Rovuma Onshore LNG development is a modular, electric-drive design that will dramatically reduce the carbon intensity of the LNG
 
* The 18-mtpa Rovuma Onshore LNG development is a modular, electric-drive design that will dramatically reduce the carbon intensity of the LNG
 +
* Phase one will be two onshore liquefaction trains, each of which will produce 7.6 million tonnes of LNG per year
  
 
=== Technical Details ===
 
=== Technical Details ===
 
* Storage capacity:
 
* Storage capacity:
 
* Constructor:
 
* Constructor:
 +
** McDermott, Saipem and China Petroleum Engineering and Construction Corporation: FEED
 +
** Technip Energies and JGC Corporation: FEED
 
* Licensor:
 
* Licensor:
  
Line 19: Line 22:
  
 
=== Suppliers / Customers ===
 
=== Suppliers / Customers ===
* Suppliers:  
+
* Suppliers: The gas is to be supplied by the [[Mamba Gas Field]]
 
* Customers:  
 
* Customers:  
  
 
=== History ===
 
=== History ===
 +
* 2011 - ENI announces it is planning an LNG terminal
 +
* 2018 - The partners signed offtake agreements
 +
* 2019 - FID taken following regulatory approval
 
* 2024 - ADNOC acquired a 10% stake from Galp
 
* 2024 - ADNOC acquired a 10% stake from Galp
  
 
=== Other Information ===
 
=== Other Information ===
* -
+
* The project has been seriously delayed by unrest
  
 
=== Links ===
 
=== Links ===
 
# [https://a-barrel-full.blogspot.com/2020/08/technipfmc-jgc-and-fluor-consortium.html TechnipFMC, JGC and Fluor Consortium Awarded a Contract for the Rovuma LNG Project in Mozambique]
 
# [https://a-barrel-full.blogspot.com/2020/08/technipfmc-jgc-and-fluor-consortium.html TechnipFMC, JGC and Fluor Consortium Awarded a Contract for the Rovuma LNG Project in Mozambique]
 +
# [https://abarrelfull.blogspot.com/2022/11/area-4-co-venture-parties-secure.html Area 4 Co-Venture Parties Secure Offtake Commitments for the Rovuma LNG Project]
 
# [https://lng-news.blogspot.com/2024/05/adnoc-to-acquire-10-equity-stake-in.html ADNOC to Acquire 10% Equity Stake in Major LNG Development in Mozambique]
 
# [https://lng-news.blogspot.com/2024/05/adnoc-to-acquire-10-equity-stake-in.html ADNOC to Acquire 10% Equity Stake in Major LNG Development in Mozambique]
 +
# [https://lng-news.blogspot.com/2024/09/technip-energies-and-jgc-corporation.html Technip Energies and JGC Corporation awarded FEED contract by ExxonMobil for the Rovuma LNG project in Mozambique]
 +
# [https://lng-news.blogspot.com/2024/09/mcdermott-awarded-feed-contract-in.html McDermott Awarded FEED Contract in Mozambique]
  
 
[[category:LNG]]
 
[[category:LNG]]
 
[[category:Mozambique]]
 
[[category:Mozambique]]
[[category:company]]
+
[[category:ENI]]
 
 
 
 
Summary Information
 
 
 
Ownership: ENI (Galp Energia (10 percent), KOGAS (10 percent) and ENH (10 percent))
 
Website: http://www.eni.com/
 
Location: Mozambique
 
Capacity: million tons/annum
 
Status: Planned
 
Brief Description
 
 
 
-
 
Technical Details
 
 
 
Storage capacity:
 
Constructor:
 
Licensor:
 
Ongoing Projects/Project Status
 
 
 
Commissioning is expected in 201X
 
Suppliers / Customers
 
 
 
Suppliers: The Mamba Gas Field
 
Customers:
 
History
 
 
 
2011 - ENI announces it is planning an LNG terminal
 
Other Information
 
 
 
-
 
Relevant Links
 
 
 
# Eni announces a giant gas discovery offshore Mozambique
 
# Eni: new giant gas discovery in the offshore Mozambique
 
# Mamba North East 2 prospect adds at least 10 tcf to the potential of Area 4 in Mozambique
 

Latest revision as of 11:32, 30 September 2024

Summary Information

  • Ownership: (ExxonMobil, Eni and CNPC) 70%, ENH - 10%, Galp- 10% and Kogas - 10%
  • Website:
  • Location: Mozambique
  • Capacity: 18 million tons/annum
  • Status: Under Construction

Brief Description

  • The 18-mtpa Rovuma Onshore LNG development is a modular, electric-drive design that will dramatically reduce the carbon intensity of the LNG
  • Phase one will be two onshore liquefaction trains, each of which will produce 7.6 million tonnes of LNG per year

Technical Details

  • Storage capacity:
  • Constructor:
    • McDermott, Saipem and China Petroleum Engineering and Construction Corporation: FEED
    • Technip Energies and JGC Corporation: FEED
  • Licensor:

Ongoing Projects/Project Status

  • Commissioning is expected in 202X

Suppliers / Customers

History

  • 2011 - ENI announces it is planning an LNG terminal
  • 2018 - The partners signed offtake agreements
  • 2019 - FID taken following regulatory approval
  • 2024 - ADNOC acquired a 10% stake from Galp

Other Information

  • The project has been seriously delayed by unrest

Links

  1. TechnipFMC, JGC and Fluor Consortium Awarded a Contract for the Rovuma LNG Project in Mozambique
  2. Area 4 Co-Venture Parties Secure Offtake Commitments for the Rovuma LNG Project
  3. ADNOC to Acquire 10% Equity Stake in Major LNG Development in Mozambique
  4. Technip Energies and JGC Corporation awarded FEED contract by ExxonMobil for the Rovuma LNG project in Mozambique
  5. McDermott Awarded FEED Contract in Mozambique