Difference between revisions of "Hyundai Heavy Industries Platform References"
Abarrelfull (talk | contribs)  | 
				Abarrelfull (talk | contribs)   | 
				||
| (5 intermediate revisions by the same user not shown) | |||
| Line 13: | Line 13: | ||
#* Jacket : 12 Ea, Pile : 55 Ea X Od36” Pcti Nov. Loading Arm : 5 Ea, Total : 4,760 M/T  | #* Jacket : 12 Ea, Pile : 55 Ea X Od36” Pcti Nov. Loading Arm : 5 Ea, Total : 4,760 M/T  | ||
#* 1979 - Dec. 1980  | #* 1979 - Dec. 1980  | ||
| − | # [[North Rankin   | + | # [[North Rankin and Perseus Gas Fields | North Rankin “A” Platform]]    | 
#* Australia  | #* Australia  | ||
#* Woodside Offshore Petroleum Pty., Ltd.,    | #* Woodside Offshore Petroleum Pty., Ltd.,    | ||
#* Pile (24 Ea X Od53” X 154m) : 8,565 M/T PC Tubular  | #* Pile (24 Ea X Od53” X 154m) : 8,565 M/T PC Tubular  | ||
#* May 1980 - May 1982,     | #* May 1980 - May 1982,     | ||
| − | # [[Bekok Oil   | + | # [[Bekok Oil and Gas Field | Bekok “C”]]/[[Tapis Oil Field | Tapis]] “D”  | 
#* Malaysia  | #* Malaysia  | ||
#* Esso  | #* Esso  | ||
| Line 33: | Line 33: | ||
#* Jacket : 3 Ea, Pile : 45 Ea X Od42”~ 54”, Total : 11,206 M/T, PCT  | #* Jacket : 3 Ea, Pile : 45 Ea X Od42”~ 54”, Total : 11,206 M/T, PCT  | ||
#* Apr. 1981 - Oct. 1982  | #* Apr. 1981 - Oct. 1982  | ||
| − | # [[Tiong Oil   | + | # [[Tiong Oil and Gas Field]]  | 
#* Malaysia  | #* Malaysia  | ||
#* Exxon  | #* Exxon  | ||
| Line 43: | Line 43: | ||
#* Module (3 Ea) : 3,279 M/T, PC  | #* Module (3 Ea) : 3,279 M/T, PC  | ||
#* Oct. 1981 - Oct. 1982  | #* Oct. 1981 - Oct. 1982  | ||
| − | # [[Tiong Oil   | + | # [[Tiong Oil and Gas Field]] / Kepong “A”  | 
#* Malaysia  | #* Malaysia  | ||
#* Exxon  | #* Exxon  | ||
| Line 90: | Line 90: | ||
#* Oct. 1982 - Nov. 1985  | #* Oct. 1982 - Nov. 1985  | ||
# 18 Ssb Eng 83/84 Marine Platform Sarawak Shell Berhad, Malaysia Platform : 3 Ea, Pile : 12 Ea X Od30”~ 42” Pc Jan. 1983 - Dec. 1984 Total : 2,936 M/T  | # 18 Ssb Eng 83/84 Marine Platform Sarawak Shell Berhad, Malaysia Platform : 3 Ea, Pile : 12 Ea X Od30”~ 42” Pc Jan. 1983 - Dec. 1984 Total : 2,936 M/T  | ||
| − | # Satun   | + | # Satun and [[Platong Gas Field]]  | 
#* Thailand  | #* Thailand  | ||
#* Union Oil Company  | #* Union Oil Company  | ||
| Line 102: | Line 102: | ||
#* Sep. 1983 - Jun. 1985  | #* Sep. 1983 - Jun. 1985  | ||
# Ssb Eng 208/82 Mini Production Sarawak Shell Berhad, Malaysia Topside (2 Ea) : 1,500 M/T Pc Oct. 1983 - Dec. 1984 Platforms  | # Ssb Eng 208/82 Mini Production Sarawak Shell Berhad, Malaysia Topside (2 Ea) : 1,500 M/T Pc Oct. 1983 - Dec. 1984 Platforms  | ||
| − | # [[Baram Delta Oil   | + | # [[Baram Delta Oil and Gas Fields]]  | 
#* Malaysia  | #* Malaysia  | ||
#* Sarawak Shell Berhad  | #* Sarawak Shell Berhad  | ||
| Line 148: | Line 148: | ||
#* Epic  | #* Epic  | ||
#* Aug. 1984 - Jun. 1985  | #* Aug. 1984 - Jun. 1985  | ||
| − | # [[Bassein Oil   | + | # [[Bassein Oil and Gas Field]]  | 
#* India    | #* India    | ||
#* South Bassein Platform Complex    | #* South Bassein Platform Complex    | ||
| Line 155: | Line 155: | ||
#* Epic    | #* Epic    | ||
#* Nov. 1984 - Mar. 1987  | #* Nov. 1984 - Mar. 1987  | ||
| − | + | # San Miguel “Julius” Platform Cities Service Oil & Gas Co., U.S.A. Jacket : 61m X 87m X 157m, Topside : 9 Ea Pct Dec. 1984 - Nov. 1986 Pile & Conductor : 9,957 M/T Total : 41,123 M/T  | |
| − | Pile & Conductor : 9,957 M/T  | ||
| − | Total : 41,123 M/T  | ||
# [[Bouri Oil and Gas Field]]  | # [[Bouri Oil and Gas Field]]  | ||
#* Libya  | #* Libya  | ||
| Line 237: | Line 235: | ||
#* Jacket Components: 11,458 M/T  | #* Jacket Components: 11,458 M/T  | ||
#* Dec. 1991 - May 1992  | #* Dec. 1991 - May 1992  | ||
| − | + | # Jhn Julius Platform Modification Jhn Oil Operating Co., China Modification Of Platform (9 Ea) : 2,592 M/T Pct Jan. 1992 - Jul. 1992  | |
| − | + | # Neelam Process Complex Oil & Natural Gas Corporation Limited, India Platform : 5 Ea, Bridge : 3 Ea, Epic Feb. 1992 - Apr. 1994 Pile, Bldg./Others Pipeline (9 Lines, 1.5 ~ 36”) : 132 Km Total : 49,500 M/T  | |
| − | Pile, Bldg./Others Pipeline  | + | # Nqp Process Complex Oil & Natural Gas Corporation Limited, India Platform : 2 Ea, Pile : 13 Ea X Od48”~ 72” Epic Mar. 1992 - Apr. 1994 Module : 4 Ea, Pipeline : 8 Lines, 4”~ 30” X 102 Km Total : 14,961 M/T  | 
| − | (9 Lines, 1.5 ~ 36”) : 132 Km  | + | # L-Abcd&E Well Platform Complex Oil & Natural Gas Corporation Limited, India Platform : 5 Ea, Pile : 22 Ea X Od72” Epic Mar. 1992 - May 1993 Pipeline : 6 Lines, 4”~ 6” X 66 Km Total : 18,700 M/T  | 
| − | Total : 49,500 M/T  | + | # [[Yacheng 13-1 Gas Field]]  | 
| − | |||
| − | |||
| − | Module : 4 Ea,  | ||
| − | Pipeline : 8 Lines, 4”~ 30” X 102 Km  | ||
| − | Total : 14,961 M/T  | ||
| − | |||
| − | Pipeline : 6 Lines, 4”~ 6” X 66 Km  | ||
| − | Total : 18,700 M/T  | ||
| − | |||
| − | # [[Yacheng 13 1 Gas Field]]  | ||
#* China  | #* China  | ||
#* Arco  | #* Arco  | ||
| − | #*   | + | #* Wellhead  Platform & Pile (Od72”~ 84”) : 6,276 M/T - CTI  | 
#* 1993 - Apr. 1994  | #* 1993 - Apr. 1994  | ||
# [[Hibernia Oil Field]]  | # [[Hibernia Oil Field]]  | ||
| Line 309: | Line 297: | ||
#* Platform (2 Ea) & Bridge (2 Ea) : 8,350 M/T Epic    | #* Platform (2 Ea) & Bridge (2 Ea) : 8,350 M/T Epic    | ||
#* Sep. 1997 - May 1999  | #* Sep. 1997 - May 1999  | ||
| − | # Bhn Revamp Platform - Operator : Ongc, India Living Quarter : 900 M/T Epic Oct. 1998 - Apr. 2000 Accommodation :104 Men  | + | # Bhn Revamp Platform - Operator : Ongc, India Living Quarter : 900 M/T Epic Oct. 1998 - Apr. 2000 Accommodation :104 Men - Contractor : Mdl  | 
| − | - Contractor : Mdl  | + | # [[South Natuna Sea Block B PSC Oil and Gas Fields]]  | 
| − | # [[South Natuna Sea Block B PSC Oil   | ||
#* Indonesia  | #* Indonesia  | ||
#* Conoco  | #* Conoco  | ||
| Line 349: | Line 336: | ||
#* IPD/CUQ Topsides Fabrication, (PPCO),  DPP & CUP Topside : 24,300 M/T Ec    | #* IPD/CUQ Topsides Fabrication, (PPCO),  DPP & CUP Topside : 24,300 M/T Ec    | ||
#* Oct. 2000 - Jul. 2003  | #* Oct. 2000 - Jul. 2003  | ||
| − | # [[Lan Tay Gas   | + | # [[Lan Tay Gas and Condensate Field]]  | 
#* Vietnam  | #* Vietnam  | ||
#* British Petroleum  | #* British Petroleum  | ||
| Line 359: | Line 346: | ||
#* Platform : 10,100 M/T, Pipeline : 14” X 68 Km, Flowlines : 6” X 4 Km, Onshore Terminal, Epic    | #* Platform : 10,100 M/T, Pipeline : 14” X 68 Km, Flowlines : 6” X 4 Km, Onshore Terminal, Epic    | ||
#* Mar. 2001 - Nov. 2003    | #* Mar. 2001 - Nov. 2003    | ||
| − | # [[PM 3 CAA Oil   | + | # [[PM 3 CAA Oil and Gas Fields]]  | 
#* Malaysia  | #* Malaysia  | ||
#* Lundin Oil Company  | #* Lundin Oil Company  | ||
| Line 399: | Line 386: | ||
#* Platform : 2 Ea, Topside : 1 Ea, Bridge : 3 Ea Total : 13,540 M/T, Epic    | #* Platform : 2 Ea, Topside : 1 Ea, Bridge : 3 Ea Total : 13,540 M/T, Epic    | ||
#* Dec. 2004 - Jul. 2007  | #* Dec. 2004 - Jul. 2007  | ||
| − | # [[  | + | # [[Okan and Mefa Gas Fields]] Phase 3a (Egp3a)  | 
#* Nigeria     | #* Nigeria     | ||
#* Chevron  | #* Chevron  | ||
| Line 416: | Line 403: | ||
#* Sep. 2006 ~ Jun. 2010  | #* Sep. 2006 ~ Jun. 2010  | ||
#* 39,000  | #* 39,000  | ||
| − | Ofon Phase 2 – OFP2 Topside   | + | # [[Ofon Oil and Gas Field]]  | 
| + | #* Elf Petroleum  | ||
| + | #* Nigeria  | ||
| + | #* Ofon Phase 2 – OFP2 Topside - 13,400t  | ||
| + | #* EPC  | ||
| + | #* Jun. 2007 ~ Nov. 2014  | ||
| + |    Limited Nigeria Topside     | ||
North Rankin ‘B’ Gas Comp. P/F Woodside Australia Topside & DSF epC Dec. 2007 ~ Dec. 2011 23,752  | North Rankin ‘B’ Gas Comp. P/F Woodside Australia Topside & DSF epC Dec. 2007 ~ Dec. 2011 23,752  | ||
Bongkot 4A P/F PTTEP Thailand Platform & Bridge (3ea) EPIC Sep. 2008 ~ Sep. 2011 29,501  | Bongkot 4A P/F PTTEP Thailand Platform & Bridge (3ea) EPIC Sep. 2008 ~ Sep. 2011 29,501  | ||
Latest revision as of 11:34, 16 August 2024
- Replacement Of North Breasting Kung In Energy Co., Ltd.,
- Korea
 - Jacket : 1 Ea, Pile : 9 Ea X Od18”~ 36” Pc
 - Jul. 1976 - Oct. 1976
 - Dolphin Total : 450 M/T
 
 - Yanbu Ngl Tanker Terminal
- Saudi Arabia
 - Arabian American Oil Co., Ltd.,
 - Jacket : 15 Ea, Module : 2 Ea Pci Pile : 193 Ea X Od36” Total : 24,000 M/T
 - Jan. 1979 - Mar. 1982
 
 - Yeosu Lng Tanker Terminal Honam Oil Refinery Co., Ltd.,
- Korea
 - Jacket : 12 Ea, Pile : 55 Ea X Od36” Pcti Nov. Loading Arm : 5 Ea, Total : 4,760 M/T
 - 1979 - Dec. 1980
 
 -  North Rankin “A” Platform
- Australia
 - Woodside Offshore Petroleum Pty., Ltd.,
 - Pile (24 Ea X Od53” X 154m) : 8,565 M/T PC Tubular
 - May 1980 - May 1982,
 
 -  Bekok “C”/ Tapis “D”
- Malaysia
 - Esso
 - Platform, Jacket : 2 Ea Pile/Conductor : 321 Ea X Od24”~ 48”, Total : 10,780 M/T, PC
 - Jun. 1980 - Jun. 1981
 
 - Champion Oil Field
- Brunei
 - Shell
 - Development Of The Champion-7, Jacket : 6 Ea, Module : 8 Ea, Bridge : 9 Ea, Field Complex Pile : 90 Ea X Od24”~ 42”, Total : 14,227 M/T
 - Oct. 1980 - Mar. 1982
 
 - F23 Gas and Condensate Field
- Malaysia
 - Shell
 - Jacket : 3 Ea, Pile : 45 Ea X Od42”~ 54”, Total : 11,206 M/T, PCT
 - Apr. 1981 - Oct. 1982
 
 - Tiong Oil and Gas Field
- Malaysia
 - Exxon
 - Pumping Platform, Jacket : 3 Ea, Pile : 390 Ea X Od24”~ 48”, Tinggi “A” Jacket Structure Total : 14,320 M/T, PC
 - May 1981 - May 1982
 
 - F23 Gas and Condensate Field
- Malaysia
 - Shell
 - Module (3 Ea) : 3,279 M/T, PC
 - Oct. 1981 - Oct. 1982
 
 - Tiong Oil and Gas Field / Kepong “A”
- Malaysia
 - Exxon
 - Jacket : 2 Ea, Pile : 182 Ea X Od24”~ 60” PC, Facilities Total : 6,000 M/T
 - Nov. 1981 - Sep. 1982
 
 - Zuluf Oil Field
- Saudi Arabia
 - Saudi Aramco
 - Jacket : 10 Ea, Pile : 58 Ea X Od30”~ 42” Topside Module : 22 Ea, Bridge : 8 Ea, Total : 28,416 M/T, Epic
 - Dec. 1981 - Jul. 1985
 
 - Iwaki Gas Field
- Japan
 - Exxon
 - Conductor Pile (15 Ea X Od24”) : 1,200 M/T PC
 - Feb. 1982 - Apr. 1983
 
 - Irong Barat Oil Field
- Malaysia
 - Esso
 - Irong Barat “A” Jacket
 - Apr. 1982 - May 1983
 
 - Semangkok Oil Field
- Malaysia
 - Esso
 - Semankok “A” & “B” Jacket
 - Apr. 1982 - May 1983
 
 - Malaysia, Esso Pulai “B” Jacket Structures Pile/Conductor : 306 Ea X Od54”~ 60” Total : 17,740 M/T
 - Mumbai High Oil Field
- India
 - ONGC
 - Water Injection Well Platforms - (Wi-2, 3, 4, 5) Total : 10,432 M/T
 - Platform : 4 Ea, Pile : 16 Ea
 - Epic
 - May. 1982 - Apr. 1983
 
 - Mumbai High Oil Field
- India
 - ONGC
 - Win Process Platform Facilities
 - Jacket, Topside : 5ea, Pile : 4 Ea X 48” - Total : 10,000 M/T
 - Epic
 - Jun. 1982 - Mar. 1984
 
 - 16 Peninsular Malaysia Offshore Petronas Caligali Sdn., Bhd., Malaysia Jacket (4 Ea) & Pile (16 Ea) : 5,588 M/T Pc Sep. 1982 - May 1983 Gas Project
 - Marjan Oil Field
- Saudi Arabia
 - Saudi Aramco
 - Platform, Facilities Pile : 72 Ea X Od30”~ 48”, Bridge : 6 Ea, Total : 40,481 M/T
 - Oct. 1982 - Nov. 1985
 
 - 18 Ssb Eng 83/84 Marine Platform Sarawak Shell Berhad, Malaysia Platform : 3 Ea, Pile : 12 Ea X Od30”~ 42” Pc Jan. 1983 - Dec. 1984 Total : 2,936 M/T
 - Satun and Platong Gas Field
- Thailand
 - Union Oil Company
 - Topside : 2 Ea, L/Q Deck : 2 Ea L/Q Building : 2 Ea, Bridge : 1 Ea Total : 8,930 M/T, EPC
 - Jul. 1983 - Jan. 1985
 
 - Harvest Gas Field
- U.S.A
 - Texaco
 - Harvest “A” Platform Topside
 - Mod (8 Ea) : 7,282 M/T Pct
 - Sep. 1983 - Jun. 1985
 
 - Ssb Eng 208/82 Mini Production Sarawak Shell Berhad, Malaysia Topside (2 Ea) : 1,500 M/T Pc Oct. 1983 - Dec. 1984 Platforms
 - Baram Delta Oil and Gas Fields
- Malaysia
 - Sarawak Shell Berhad
 - Ssb Eng 79/83 Marine Platform
 - Siwa Jacket - Platform : 2 Ea, Pile : 7ea X Od30”~ 42” Pc
 - Total : 1,359 M/T
 - Oct. 1983 - Jun. 1984
 
 - Mumbai High Oil Field
- India
 - ONGC
 - Phase-3 Of “Sh” Complex
 - Platform : 2 Ea, Pile :12 Ea X Od60”
 - Bridge, Pipeline : 62.8 Km
 - Epic
 - Total : 17,157 M/T
 - Dec. 1983 - May 1985
 
 - Mumbai High Oil Field
- India
 - ONGC
 - Phase-2 Of “Nq” Complex
 - Jacket : 2 Ea, Pile : 12ea X Od54”
 - Topside : 3 Ea, Bridge : 3 Ea
 - Pipeline : 68.3 Km, Total : 12,248 M/T
 - Epic
 - Dec. 1983 - Apr. 1985
 
 - 25 Ssb Marine Platform (Eng 79/82) Sarawak Shell Berhad, Malaysia Platform (2 Ea) : 6,631 M/T Pc Feb. 1984 - Mar. 1985
 - East Zeit Oil Field
- Egypt
 - Esso
 - East Zeit Platform
 - Platform & Pile : 5,873 M/T Pct
 - Apr. 1984 - Feb. 1985
 
 - F6 Gas Field
- Malaysia
 - Sarawak Shell Berhad
 - 55/83 F6-A Module
 - Topside Module : 4 Ea, Bridge : 2 Ea, Total : 7,124 M/T
 - Epic
 - Aug. 1984 - Dec. 1986
 
 - F6 Gas Field
- Malaysia
 - Sarawak Shell Berhad
 - (Eng 55/83 F6-A) Jacket & Pile
 - Jacket : 2 Ea, Pile : 8 Ea, Total : 6,756 M/T
 - Epic
 - Aug. 1984 - Jun. 1985
 
 - Bassein Oil and Gas Field
- India
 - South Bassein Platform Complex
 - Oil & Natural Gas Corporation Limited,
 - Platform (4 Ea), Pile & Bridge : 20,989 M/T
 - Epic
 - Nov. 1984 - Mar. 1987
 
 - San Miguel “Julius” Platform Cities Service Oil & Gas Co., U.S.A. Jacket : 61m X 87m X 157m, Topside : 9 Ea Pct Dec. 1984 - Nov. 1986 Pile & Conductor : 9,957 M/T Total : 41,123 M/T
 - Bouri Oil and Gas Field
- Libya
 - ENI
 - Topside Module (9 Ea) : 10,230 M/T EPIC
 - Feb. 1985 - Jun. 1987
 
 - Santa Ynez Oil Fields
- U.S.A.
 - Exxon
 - Harmony Platform: 91.55m X 116.29m X 374.5m (H) - PC
 - Heritage Platform: 84.4m X 109.4m X 331.5m (H) - PC
 - Total : 72,100 M/T
 - Jul. 1985 - Apr. 1988
 
 - Lombo East Oil Field
- Angola
 - Texaco
 - Lombo East Development - Prospeccao Platform : 2 Ea, Pile : 32 Ea - Epic
 - Other Deck : 3 Ea, Subsea Pipeline : 105 Km
 - Total : 4,770 M/T
 - Dec. 1985 - Mar. 1987
 
 - Infill Well Platform (Ia,Ib,Id & Icd) Oil & Natural Gas Corporation Limited, India Platform : 4 Ea, Pile/Conductor : 37 Ea Epic Nov. 1986 - Dec. 1987 Total : 15,000 M/T
 - Mumbai High Oil Field
- India
 - ONGC
 - Infill “Icp” Process Platform Complex
 - Platform & Pile, L/Q Module : 5 Ea
 - Bridge : 4 Ea, Misc. (Sbm/Plem/Buoy)
 - Pipeline (13 Lines) : 100.45 Km
 - Total : 20,913 M/T
 - Epic
 - Nov. 1986 - Feb. 1989
 
 - Mumbai High Oil Field
- India
 - ONGC
 - Infill “Icw” Process Platform Complex
 - Platform : 1 Ea, Pile : 12 Ea, Bridge : 2 Ea Epic
 - Dec. 1986 - Feb. 1989
 - Submarine P/L : 4.1 Km, Total : 11,700 M/T
 
 - 37 Iraq Crude Oil Trans Saudi Arabia State Company Of Oil Project, Iraq Platform : 40 Ea, Pile : 224 Ea X Od36”~ 48” Epic Sep. 1987 - Sep. 1989 Project (Offshore Marine Terminal) Trestle Deck : 23 Ea, Bridge : 20 Ea Total : 50,754 M/T
 - Takula Oil and Gas Field
- Angola
 - Cabgoc
 - Takula Water Injection Platform - 5 Ea, Pile : 20 Ea X Od30”~ 36” Pct
 - Nov. 1987 - Jul. 1988
 - Total : 4,869 M/T
 
 - Santa Ynez Oil Fields
- Exxon Co.,
 - U.S.A.
 - Topside Structures - Topside Module (22 Ea) : 8,936 M/T
 - PC
 - Jan. 1988 - Jan. 1989
 - Fabrication
 
 - Heera Oil Field
- India
 - Oil & Natural Gas Corporation Limited
 - Process Platform Complex , Jacket : 3 Ea, Pile : 33 Ea, Module/Deck : 10 Ea, Bridge : 2 Ea, Misc. : 4 Ea, Pipeline (10lines, 6”~ 30”) : 20 Km, Total : 26,805 M/T,EPIC
 - May 1988 - May 1990
 
 - Iwafune-Oki Oil and Gas Field
- Japan
 - Japex Offshore
 - Iwafune-Oki Platform - Drilling / Production Module (4 Ea)
 - 5,520 M/T
 - Epct
 - Mar 1989 - May 1990
 
 - Goodwyn A Gas and Condensate Field
- Australia
 - Woodside Petroleum
 - Process Platform, Module : 4 Ea, Flare Tower : 1 Ea, Total : 10,784 M/T, PC
 - Apr. 1990 - Jun. 1992
 
 - Bp Riser Jacket British Petroleum, U.K. Jacket (40m X 20m X 143m) : 6,500 M/T Pc May 1991 - May 1992
 - Safaniya Oil Field
- Saudi Arabia
 - Saudi Arabian Oil Company
 - Living Quarters Platform Accommodation : 140 Men, Living Quarter Module : 1,460 M/T Epct
 - Jun. 1991 - Jun. 1993
 
 - Brage Oil and Gas Field
- Norway
 - Norsk Hydro / Ake Verdal
 - Jacket Components: 11,458 M/T
 - Dec. 1991 - May 1992
 
 - Jhn Julius Platform Modification Jhn Oil Operating Co., China Modification Of Platform (9 Ea) : 2,592 M/T Pct Jan. 1992 - Jul. 1992
 - Neelam Process Complex Oil & Natural Gas Corporation Limited, India Platform : 5 Ea, Bridge : 3 Ea, Epic Feb. 1992 - Apr. 1994 Pile, Bldg./Others Pipeline (9 Lines, 1.5 ~ 36”) : 132 Km Total : 49,500 M/T
 - Nqp Process Complex Oil & Natural Gas Corporation Limited, India Platform : 2 Ea, Pile : 13 Ea X Od48”~ 72” Epic Mar. 1992 - Apr. 1994 Module : 4 Ea, Pipeline : 8 Lines, 4”~ 30” X 102 Km Total : 14,961 M/T
 - L-Abcd&E Well Platform Complex Oil & Natural Gas Corporation Limited, India Platform : 5 Ea, Pile : 22 Ea X Od72” Epic Mar. 1992 - May 1993 Pipeline : 6 Lines, 4”~ 6” X 66 Km Total : 18,700 M/T
 - Yacheng 13-1 Gas Field
- China
 - Arco
 - Wellhead Platform & Pile (Od72”~ 84”) : 6,276 M/T - CTI
 - 1993 - Apr. 1994
 
 - Hibernia Oil Field
- Canada
 - The Hibernia Management and Development Company Ltd. (HMDC)
 - Service & L/Q Module : 12,420 M/T PC
 - Mar. 1993 - Mar. 1995
 
 - Harding Oil Field
- U.K.
 - BP
 - Jack-Up Pdq Platform, Tpg-500 Triangular Leg (3 Ea) : 123m, EPC, Oil Production : 64,000 Bopd, Total : 23,300 M/T Accommodation : 84 Men
 - Mar. 1993 - Jul. 1995
 
 - Edop Oil Field
- Nigeria
 - Mobil
 - Gas Injection Platform, Jacket, Topside : 2 Ea, Pile : 8 Ea X 47” Bridge, Removal & Modification, Pipeline : 3.6 Km, Total : 6,000 M/TEpic
 - Jun. 1994 - Jun. 1996
 
 - Heera Oil Field
- India
 - Oil & Natural Gas Corporation Limited
 - Hx/Hy Wellhead Platform
 - Platform (4 Ea) : 2,900 M/T
 - Epic
 - May 1996 - Dec. 1997
 
 
Offshore Pipeline : 6”~ 12” X 39.1 Km
- 55 B-121/119 Wellhead Platform Oil & Natural Gas Corporation Limited, India Platform : 1,000 M/T Epic Jun. 1996 - Jan. 1997
 
Offshore Pipeline : 12” X 36.7 Km
- Pinghu Oil and Gas Field
- China
 - China National Offshore Oil Corp. (Cnooc)
 - Offshore Platform Platform & Pile : 12,800 M/T EPIC
 - Jun. 1996 - Jul. 1998
 
 - South West Ampa Gas Field
- Brunei
 - Shell
 - Development Of Facilities For Amdp-30
 - Platform & Pile, Conductor Pipeline : 3 Km, Power Cable : 3 Km, Total : 1,670 M/T
 - Epic
 - Jul. 1996 - Jun. 1997
 
 - Mumbai High Oil Field
- India
 - ONGC
 - Booster Compressor Platform - A & B, Platform : 2 Ea, Piles, Module : 8 Ea, Living Quarter : 2 Ea, Bridge : 4 Ea,Total : 14,165 M/T, EPIC
 - May 1997 - May 1999
 
 - Weizhou 12-1 Oil Field
- China
 - China National Offshore Oil Corp.
 - Topside & Living Quarter : 5,630 M/T, Accommodation : 80 Men
 - Construction (Cnooc), Epic
 - Jul. 1997 - Mar. 1999
 
 - Benchamas Oil and Gas Field
- Thailand
 - Pogo Producing Co.
 - Platform (2 Ea) & Bridge (2 Ea) : 8,350 M/T Epic
 - Sep. 1997 - May 1999
 
 - Bhn Revamp Platform - Operator : Ongc, India Living Quarter : 900 M/T Epic Oct. 1998 - Apr. 2000 Accommodation :104 Men - Contractor : Mdl
 - South Natuna Sea Block B PSC Oil and Gas Fields
- Indonesia
 - Conoco
 - West Natuna Block B Facilities
 - Mogpu : 23,150 M/T, Modification : 2 Ea
 - Epic
 - Feb. 1999 - May 2001
 - Subsea Tie-Back System
 
 - Suizhong 36 1 Oil Field
- China
 - China National Offshore Oil Corp.
 - Cep Topside (3 Modules) : 5,880 M/T EPIC
 - Jun. 1999 - Oct. 2000
 
 - F2A Hanze Oil Field
- Netherlands
 - Veba Oil
 - Gravity-Based Structure Platform & Deck : 21,000 M/T, Production Capacity : 30,000 Bopd, Storage Capacity : 150,000 Bbl, EPIC
 - Jul. 1999 - Jun. 2001
 
 - Bongkot Gas Field Phase-3b
- Thailand
 - Pttep
 - Wellhead Platform , Platform (2 Ea) : 3,235 M/T, Pipeline : 16”~ 18” X 23 Km, Platform Modification : 2 Ea, Epic
 - Aug. 1999 - Jun. 2001
 
 -  Soroosh-Nowrooz
- Iran Epic-1
 - Shell Exploration B.V,
 - Platform : 4 Ea, Bridge & Tower Subsea Total : 4,124 M/T, P/L : 16” X 12 Km, Epic
 - Sep. 2000 - Mar. 2002
 
 - Eardo Project
- Korea
 - Korea Offshore Research
 - Platform & Pile : 3,030 M/T Epic
 - Sep. 2000 - Mar. 2003
 
 - Bayu Undan Gas Field
- Australia
 - Phillips Petroleum
 - IPD/CUQ Topsides Fabrication, (PPCO), DPP & CUP Topside : 24,300 M/T Ec
 - Oct. 2000 - Jul. 2003
 
 - Lan Tay Gas and Condensate Field
- Vietnam
 - British Petroleum
 - Production Platform : 11,000 M/T Package 1 & Package 2, Topside : 5,700 M/T, Epic
 - Dec. 2000 - Jun. 2002
 
 - Donghae 1 Gas Field
- Korea
 - Korea National Oil Corporation,
 - Platform : 10,100 M/T, Pipeline : 14” X 68 Km, Flowlines : 6” X 4 Km, Onshore Terminal, Epic
 - Mar. 2001 - Nov. 2003
 
 - PM 3 CAA Oil and Gas Fields
- Malaysia
 - Lundin Oil Company
 - Pm-3 Cpp Field Development (Phase 2) Topside
 - 7,673 M/T
 - Epic
 - Jul. 2001 - Sep. 2003
 
 - Al Shaheen Oil Field
- Qatar
 - Maersk Oil
 - Block 5 Field Development
 - Platform : 10 Ea, Gas Comp. Module : 4 Ea, Total : 37,005 M/T
 - Epic
 - Sep. 2001 - Jun. 2003
 
 - Bahr Essalam Gas Field
- Libya
 - ENI
 - Sabratha Platform: 30,832 M/T EPIC
 - Jan. 2002 - Sep. 2004
 
 - Huizhou 19-3/2/1 Oil Field
- China
 - CNOOC
 - Platform Cact-Og, Modification Of Platform : 2 Ea, 4 Legged Platform (2 Ea) : 24,000 M/T, Pipeline (2 Lines) : 18” & 14” X 41.1 Km, Subsea Cable : 31.8 Km, Epic
 - Aug. 2002 - Jun. 2004
 
 - Msp Platform Oil & Natural Gas Corporation Limited, India Platform, Pile & Bridge : 13,560 M/T Epic Jun. 2003 - Apr. 2005
 - Gauri Oil and Gas Field
- India
 - Cairn Energy India
 - Gauri-A Pipeline Installation, Topside : 550 M/T, Pipeline :12” X 5.4 Km, Riser : 2 - IC
 - Dec. 2003 - Mar. 2004
 
 - Rong Doi Gas Field
- Vietnam
 - Korea National Oil Corporation
 - Platform (2 Ea) & Bridge Total : 17,200 M/T, Pipeline : 18” X 58 Km Epic
 - Sep. 2004 - Sep. 2006
 
 - East Area Epc-1b
- Nigeria
 - Mobil Producing Unlimited (Mpn),
 - Platform : 2 Ea, Topside : 1 Ea, Bridge : 3 Ea Total : 13,540 M/T, Epic
 - Dec. 2004 - Jul. 2007
 
 - Okan and Mefa Gas Fields Phase 3a (Egp3a)
- Nigeria
 - Chevron
 - Offshore Platform (2 Ea), Jacket & Pile : 4,392 M/T Epic, F/O Installation
 - Mar. 2005 - Mar. 2007
 
 - Yadana Gas Field
- Myanmar
 - Total
 - MP Compression Platform, Pile & Bridge : 8,120 Ton EPIC
 - Oct. 2005 - Mar. 2008
 
 - Umm Shaif Oil Field
- UAE
 - ADMA-OPCO
 - Gas Injection Facilities, Platform (3ea) Pipeline : 23 km 79
 - EPIC
 - Sep. 2006 ~ Jun. 2010
 - 39,000
 
 - Ofon Oil and Gas Field
- Elf Petroleum
 - Nigeria
 - Ofon Phase 2 – OFP2 Topside - 13,400t
 - EPC
 - Jun. 2007 ~ Nov. 2014
 
 
Limited Nigeria Topside
North Rankin ‘B’ Gas Comp. P/F Woodside Australia Topside & DSF epC Dec. 2007 ~ Dec. 2011 23,752 Bongkot 4A P/F PTTEP Thailand Platform & Bridge (3ea) EPIC Sep. 2008 ~ Sep. 2011 29,501 SHWE Platform Daewoo International (Myanmar E&P) Myanmar Platform Pipeline : 126.5 km 83 EPIC Oct. 2009 ~ Apr. 2013 50,750 Barzan Offshore RasGas Qatar Topside (3ea) & L/Q Pipelines : 178.5 km 84 EPIC Jan. 2011 ~ Nov. 2014 8,75 5 Clair Ridge Platform BP North Sea Platform (2ea) EPC Mar. 2011 ~ Feb. 2016 43,100 DSO Platform Chevron Nigeria Platform (2ea) EPC Jan. 2011 ~ Aug. 2014 14,881 Booster Compression Platform Carigali-Hess Malaysia Platform EPC Sep. 2012 ~ Sep. 2015 24,237 Hebron Topside DES (Derrick Equipment Set) Worley Parsons (ExxonMobil) Canada DES : 25 m x 20 m x 80 m epC Feb. 2013 ~ Feb. 2015 3,200 Su Tu Nau (T&I) PTSC M&C (CLJOC) Vietnam Jacket Installation T & I Jul. 2013 ~ Oct. 2013 5,938 Bergading CPP & WHP Hess E&P Malaysia Platform (2ea) & Bridge EPIC May. 2014 ~ Nov. 2016 32,536 NASR Full Field Development – PKG2 ADMA-OPCO UAE Platform (3ea) & Bridge (11ea) EPIC Jul. 2014 ~ May. 2019 63,064 Badamyar Development Project Total Myanmar Platform (2ea) & Bridge & Pile EPC Sep. 2014 ~ Apr. 2017 13,913 Baronia CPP-B P/F Petronas Carigali Malaysia Platform EPIC Nov. 2014 ~ Nov. 2017 22,749