Difference between revisions of "Hawiyah Gas Processing Plant"
		
		
		
		
		Jump to navigation
		Jump to search
		
Abarrelfull (talk | contribs)  (Created page with "Summary Information  * Ownership: Saudi Aramco * Website:  * Location: 220 kilometers south of Dhahran * Capacity: 2.4 billion scfd  +++ Brief Description * The plant was orig...")  | 
				Abarrelfull (talk | contribs)   | 
				||
| Line 15: | Line 15: | ||
++++ Related Oil and Gas Fields  | ++++ Related Oil and Gas Fields  | ||
| − | *   | + | * [[Ghawar Oil Field]]  | 
+++ Ongoing Projects  | +++ Ongoing Projects  | ||
| Line 28: | Line 28: | ||
+++ Relevant Links  | +++ Relevant Links  | ||
| − | # [[  | + | # [[OTEPI Refinery References]]  | 
# [[JGC Oil And Gas Processing References]]  | # [[JGC Oil And Gas Processing References]]  | ||
# [[Saipem Acid Gas Removal References]]  | # [[Saipem Acid Gas Removal References]]  | ||
| − | # [[  | + | # [[Technip Oil And Gas Processing References]]  | 
Latest revision as of 11:32, 16 August 2024
Summary Information
- Ownership: Saudi Aramco
 - Website:
 - Location: 220 kilometers south of Dhahran
 - Capacity: 2.4 billion scfd
 
+++ Brief Description
- The plant was originally designed to process 1.6 billion standard cubic feet per day (scfd) of raw non-associated gas from wells in the [[[Ghawar Oil Field]]] and produce 1.4 billion scfd of sales gas and 170,000 bpd of condensate.
 - The plant was the first company plant to process non-associated gas
 
+++ Contractors
- **Saipem:** Gas Treating and Compression Facilities at Hawiyah NGL Recovery Plant
 - **JGC:** Gas Treating - 1,600 MMSCFD
 
++++ Related Oil and Gas Fields
+++ Ongoing Projects
- -
 
+++ Other Information
- -
 
+++ History
- 2001 - Operations started
 - 2009 - Capacity increased from 1.6 billion to 2.4 billion scfd
 
+++ Relevant Links