Difference between revisions of "P-57 FPSO"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
| Line 1: | Line 1: | ||
| − | Summary Information | + | === Summary Information === |
* Name: P 57 FPSO | * Name: P 57 FPSO | ||
| Line 10: | Line 10: | ||
* Year of Completion: 2010 | * Year of Completion: 2010 | ||
| − | + | === Brief Description === | |
* P-57 has a production capacity of 180,000 barrels of heavy oil per day (bopd). Its capabilities include compressing 2 million cubic metres of gas per day, processing 300,000 barrels of liquids per day and storing 1,600,000 barrels of oil. | * P-57 has a production capacity of 180,000 barrels of heavy oil per day (bopd). Its capabilities include compressing 2 million cubic metres of gas per day, processing 300,000 barrels of liquids per day and storing 1,600,000 barrels of oil. | ||
* It is the conversion of the 255,272-dwt tanker, MT Accord | * It is the conversion of the 255,272-dwt tanker, MT Accord | ||
| − | + | === Contractors === | |
* **Keppel:** Conversion, including fabrication and integration of topside modules, piping and electrical equipment, as well as commissioning | * **Keppel:** Conversion, including fabrication and integration of topside modules, piping and electrical equipment, as well as commissioning | ||
* **Gustomsc:** Design | * **Gustomsc:** Design | ||
| Line 24: | Line 24: | ||
** Design And Engineering of Gas Dehydration and TEG Regeneration Package | ** Design And Engineering of Gas Dehydration and TEG Regeneration Package | ||
| − | + | === Status === | |
* In operation | * In operation | ||
| − | + | === History === | |
* 2008 - Keppel awarded conversion contract | * 2008 - Keppel awarded conversion contract | ||
* 2009 - Dyna Mac awarded topsides contract | * 2009 - Dyna Mac awarded topsides contract | ||
| Line 33: | Line 33: | ||
* 2010 - First oil produced | * 2010 - First oil produced | ||
| − | + | === Other Information === | |
* - | * - | ||
| − | + | === Links === | |
# [[Dyna-Mac Topsides Module Business]] | # [[Dyna-Mac Topsides Module Business]] | ||
# [[Kavin Engineering FPSO References]] | # [[Kavin Engineering FPSO References]] | ||
| − | # | + | # [[International Protective Coatings FPSO References]] |
# [[Nessco FPSO References]] | # [[Nessco FPSO References]] | ||
# [[Gustomsc FPSO References]] | # [[Gustomsc FPSO References]] | ||
# [http://killajoules.wikidot.com/archive:keppel-shipyard-secures-two-conversion-projects-wort Keppel Shipyard secures two conversion projects worth S$150 million] | # [http://killajoules.wikidot.com/archive:keppel-shipyard-secures-two-conversion-projects-wort Keppel Shipyard secures two conversion projects worth S$150 million] | ||
# [http://killajoules.wikidot.com/archive:keppel-delivers-fpso-p-57-to-sbm-for-petrobras Keppel delivers FPSO P-57 to SBM for Petrobras] | # [http://killajoules.wikidot.com/archive:keppel-delivers-fpso-p-57-to-sbm-for-petrobras Keppel delivers FPSO P-57 to SBM for Petrobras] | ||
Latest revision as of 12:23, 6 August 2024
Contents
Summary Information
- Name: P 57 FPSO
- Field: Jubarte Oil Field
- Country: Brazil
- Ownership: SBM Offshore
- Website: http://www.petrobras.com.br/
- Field Operated By: Petrobras
- Capacity: 180,000 bpd
- Year of Completion: 2010
Brief Description
- P-57 has a production capacity of 180,000 barrels of heavy oil per day (bopd). Its capabilities include compressing 2 million cubic metres of gas per day, processing 300,000 barrels of liquids per day and storing 1,600,000 barrels of oil.
- It is the conversion of the 255,272-dwt tanker, MT Accord
Contractors
- **Keppel:** Conversion, including fabrication and integration of topside modules, piping and electrical equipment, as well as commissioning
- **Gustomsc:** Design
- **Dyna-Mac:** Five units of topside modules
- **Nessco:** Communications systems
- **Kavin Engineering:**
- Topside Facilities Design – Bid Support
- Design And Engineering of Gas Dehydration and TEG Regeneration Package
Status
- In operation
History
- 2008 - Keppel awarded conversion contract
- 2009 - Dyna Mac awarded topsides contract
- 2010 - Conversion completed
- 2010 - First oil produced
Other Information
- -