Difference between revisions of "Triton Oil and Gas Fields"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
(One intermediate revision by the same user not shown) | |||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
* Operator: Dana | * Operator: Dana | ||
* Country: UK | * Country: UK | ||
Line 9: | Line 9: | ||
* Production Volume: | * Production Volume: | ||
− | + | === Description === | |
− | * The [[Triton FPSO]] produces oil and gas from the | + | * The [[Triton FPSO]] produces oil and gas from the [[Bittern Oil Field | Bittern]], [[Guillemot Oil Fields | Guillemot West and North West]], '''Clapham''', [[Pict Oil Field | Pict]] and [[Saxon Oil Field | Saxon]] fields. It is located in the UK Central North Sea, Block 21/30, approximately 120 miles east of Aberdeen. |
* Gas is processed and compressed before being brought onshore to St Fergus via the [[Fulmar Gas Pipeline]] | * Gas is processed and compressed before being brought onshore to St Fergus via the [[Fulmar Gas Pipeline]] | ||
− | + | === Contractors === | |
− | * | + | * '''Kvaerner:''' Overall construction contract |
− | * | + | * '''Samsung Heavy Industries:''' Hull Construction |
− | * | + | * '''Sembawang Shipyard:''' Modification |
− | + | === History === | |
* 1998 - Government approval for Bittern & Guillemot | * 1998 - Government approval for Bittern & Guillemot | ||
* 2000 - First oil produced | * 2000 - First oil produced | ||
* 2002 - Approval for Clapham | * 2002 - Approval for Clapham | ||
* 2012 - Dana becomes operator of Triton FPSO | * 2012 - Dana becomes operator of Triton FPSO | ||
+ | * 2017 - Tailwind Energy acquired stakes from Shell and Exxon | ||
+ | * 2023 - Serica acquired Tailwind | ||
− | + | === Geology === | |
* | * | ||
− | + | === Links === | |
− | # | + | # [[UK Oil and Gas Fields by Approval Date]] |
# [http://killajoules.wikidot.com/archive:first-oil-through-triton-fpso First Oil Through Triton FPSO] | # [http://killajoules.wikidot.com/archive:first-oil-through-triton-fpso First Oil Through Triton FPSO] | ||
# [http://killajoules.wikidot.com/blog:3197 Dana becomes operator of Triton FPSO] | # [http://killajoules.wikidot.com/blog:3197 Dana becomes operator of Triton FPSO] | ||
+ | # [https://abarrelfull.blogspot.com/2024/05/tailwind-energy-buys-out-shell-exxon-at.html Tailwind Energy buys out Shell, Exxon at Triton] | ||
+ | # [https://abarrelfull.blogspot.com/2023/09/serica-energy-plc-proposed-acquisition.html Serica Energy PLC Proposed Acquisition of Tailwind Energy Investments Ltd] |
Latest revision as of 16:46, 30 July 2024
Summary Information
- Operator: Dana
- Country: UK
- Location: Central North Sea
- Production start: 2000
- Partners: Dana (51.966%), Shell UK (26.42%), Esso Exploration and Production UK Limited (20%) and Endeavour (1.614%)
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
Description
- The Triton FPSO produces oil and gas from the Bittern, Guillemot West and North West, Clapham, Pict and Saxon fields. It is located in the UK Central North Sea, Block 21/30, approximately 120 miles east of Aberdeen.
- Gas is processed and compressed before being brought onshore to St Fergus via the Fulmar Gas Pipeline
Contractors
- Kvaerner: Overall construction contract
- Samsung Heavy Industries: Hull Construction
- Sembawang Shipyard: Modification
History
- 1998 - Government approval for Bittern & Guillemot
- 2000 - First oil produced
- 2002 - Approval for Clapham
- 2012 - Dana becomes operator of Triton FPSO
- 2017 - Tailwind Energy acquired stakes from Shell and Exxon
- 2023 - Serica acquired Tailwind