Difference between revisions of "North Belut Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) (→Links) |
||
(One intermediate revision by the same user not shown) | |||
Line 15: | Line 15: | ||
=== Contractors === | === Contractors === | ||
* '''Saipem:''' Process platform topsides transport & installation | * '''Saipem:''' Process platform topsides transport & installation | ||
− | * FoundOcean: | + | * '''FoundOcean:''' |
+ | ** Phase 1 WHP-C | ||
+ | ** WHPC&D Jacket Construction PTE Installations | ||
+ | ** Phase 2 WHP-D & CPP | ||
* '''Process Group:''' | * '''Process Group:''' | ||
** 2 x Sand Handling and Removal Packages | ** 2 x Sand Handling and Removal Packages | ||
Line 27: | Line 30: | ||
=== Links === | === Links === | ||
− | # [[FoundOcean Subsea References]] | + | # [[FoundOcean Asia Subsea References]] |
# [[Process Group Oil And Gas Processing References]] | # [[Process Group Oil And Gas Processing References]] | ||
# [[Saipem Fixed Offshore Production Facilities Project References]] | # [[Saipem Fixed Offshore Production Facilities Project References]] | ||
# [http://killajoules.wikidot.com/archive:north-belut-gas-field-starts-production North Belut Gas Field Starts Production] | # [http://killajoules.wikidot.com/archive:north-belut-gas-field-starts-production North Belut Gas Field Starts Production] |
Latest revision as of 15:20, 18 July 2024
Summary Information
- Operator: ConocoPhillips
- Country: Indonesia
- Location: Block B, South Natuna Sea
- Production start:
- Partners:
- Type: Gas & Condensate
- Estimated Reserves:
- Production Volume:
Description
- The field is part of the South Natuna Sea Block B PSC Oil and Gas Fields development
- The development consists of two wellhead platforms, an intrafield pipeline, one central processing platform capable of processing condensate-rich gas, and export pipelines to the Kerisi pipeline end manifold where it connects with the existing Block B pipeline infrastructure
Contractors
- Saipem: Process platform topsides transport & installation
- FoundOcean:
- Phase 1 WHP-C
- WHPC&D Jacket Construction PTE Installations
- Phase 2 WHP-D & CPP
- Process Group:
- 2 x Sand Handling and Removal Packages
- MEG Regeneration package - 19 USGPM circulation rate
History
- 2009 - North Belut Gas Field Starts Production