Difference between revisions of "Ruwais LNG Terminal Project"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) (→Links) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 9: | Line 9: | ||
=== Brief Description === | === Brief Description === | ||
− | * The Ruwais LNG project consists of two 4.8 million metric tons per annum (mtpa) natural gas liquefaction trains with a total capacity of 9.6 mtpa of LNG. | + | * The Ruwais LNG project consists of two 4.8 million metric tons per annum (mtpa) natural gas liquefaction trains with a total capacity of 9.6 mtpa of LNG. |
+ | * The plant will use electric-driven motors instead of conventional gas turbines and will be powered by clean energy | ||
=== Technical Details === | === Technical Details === | ||
Line 40: | Line 41: | ||
# [https://lng-news.blogspot.com/2024/03/adnoc-signs-second-long-term-heads-of.html ADNOC Signs Second Long-Term Heads of Agreement for Ruwais LNG Project] | # [https://lng-news.blogspot.com/2024/03/adnoc-signs-second-long-term-heads-of.html ADNOC Signs Second Long-Term Heads of Agreement for Ruwais LNG Project] | ||
# [https://lng-news.blogspot.com/2024/05/adnoc-signs-third-long-term-heads-of.html ADNOC Signs Third Long-Term Heads of Agreement for Ruwais LNG Project] | # [https://lng-news.blogspot.com/2024/05/adnoc-signs-third-long-term-heads-of.html ADNOC Signs Third Long-Term Heads of Agreement for Ruwais LNG Project] | ||
+ | # [https://lng-news.blogspot.com/2024/07/technip-energies-jgc-and-nmdc-energy.html Technip Energies, JGC and NMDC Energy awarded a major contract for ADNOC’s Ruwais LNG project in the UAE] | ||
+ | # [https://lng-news.blogspot.com/2024/07/shell-to-invest-in-ruwais-lng-project.html Shell to invest in Ruwais LNG project in Abu Dhabi] | ||
[[category:LNG]] | [[category:LNG]] | ||
[[category:UAE]] | [[category:UAE]] | ||
[[category:ADNOC]] | [[category:ADNOC]] |
Latest revision as of 14:31, 10 July 2024
Contents
Summary Information
- Ownership: ADNOC
- Website: https://www.adnoc.ae/
- Wikipage: ADGAS Das Island LNG Terminal
- Location: Al Ruwais Industrial City, Al Dhafrah, Abu Dhabi
- Capacity: million tons/annum
- Status: Planned
Brief Description
- The Ruwais LNG project consists of two 4.8 million metric tons per annum (mtpa) natural gas liquefaction trains with a total capacity of 9.6 mtpa of LNG.
- The plant will use electric-driven motors instead of conventional gas turbines and will be powered by clean energy
Technical Details
- Storage capacity:
- Constructor:
- Baker Hughes: Provision two electric liquefaction systems
- Technip Energies, JGC Corporation and National Petroleum Construction Company: EPC contract
- Licensor:
Ongoing Projects/Project Status
- Commissioning is expected in 2028
Suppliers / Customers
- Suppliers: Gas will be supplied from a number of projects including the Ghasha and Hail Sour Gas Fields
- Customers:
- ENN: 1 million tons per year
- SEFE: 1 million tons per year
- EnBW: 0.6 million tons per year
History
- 2024 - Notice to proceeed for EPC contractors
- 2024 - HOA signed to supply SEFE
Other Information
- -
Links
- Baker Hughes Announces Milestone Electric-LNG Award for ADNOC Ruwais LNG Export Terminal
- ADNOC Issues Early EPC Award for Ruwais LNG Project
- ADNOC Signs Second Long-Term Heads of Agreement for Ruwais LNG Project
- ADNOC Signs Third Long-Term Heads of Agreement for Ruwais LNG Project
- Technip Energies, JGC and NMDC Energy awarded a major contract for ADNOC’s Ruwais LNG project in the UAE
- Shell to invest in Ruwais LNG project in Abu Dhabi