Difference between revisions of "Clyde Oil Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
| (2 intermediate revisions by the same user not shown) | |||
| Line 1: | Line 1: | ||
=== Summary Information === | === Summary Information === | ||
| − | * Operator: | + | * Operator: Repsol |
* Country: UK | * Country: UK | ||
* Location: North Sea | * Location: North Sea | ||
| Line 12: | Line 12: | ||
* The Clyde field, plus satellites Leven and Medwin, is located on block 30/17b | * The Clyde field, plus satellites Leven and Medwin, is located on block 30/17b | ||
* It consists of a single large manned steel platform | * It consists of a single large manned steel platform | ||
| − | * Gas from the [[Affleck Oil Field]] is transported to the Clyde Platform | + | * Gas from the [[Affleck Oil Field]] is transported to the Clyde Platform. From here it is sent to the [[Fulmar Oil and Gas Field]] |
==== Flyndre & Cawdor ==== | ==== Flyndre & Cawdor ==== | ||
| Line 19: | Line 19: | ||
=== Contractors === | === Contractors === | ||
| − | * | + | * '''McDermott:''' Construction of Clyde Platform |
| − | * | + | * '''Heerema Marine Contractors:''' Platform Installation |
| − | * | + | * '''Proserv:''' Electro-hydraulic multiplex subsea control systems, along with its associated topside and subsea interface systems |
| − | * | + | * '''Global Maritime:''' Warranty surveyor for 16” piggy-backed, trenched infield pipeline - Clyde Q1-B Project |
==== Flyndre & Cawdor ==== | ==== Flyndre & Cawdor ==== | ||
| − | * | + | * '''Aker Solutions:''' EPCI contract – engineering, procurement, construction and installation |
=== History === | === History === | ||
| Line 34: | Line 34: | ||
* 1996 - BP sells the field to Talisman | * 1996 - BP sells the field to Talisman | ||
* 2014 - Flyndre and Cawdor field development approval | * 2014 - Flyndre and Cawdor field development approval | ||
| + | * 2015 - Repsol became a partner by acquiring Talisman Sinopec | ||
| + | * 2017 - First oil from Flyndre field | ||
=== Geology === | === Geology === | ||
| Line 49: | Line 51: | ||
# [http://killajoules.wikidot.com/archive:proserv-seals-double-subsea-contracts-win Proserv seals double subsea contracts win] | # [http://killajoules.wikidot.com/archive:proserv-seals-double-subsea-contracts-win Proserv seals double subsea contracts win] | ||
# [http://killajoules.wikidot.com/blog:5218 Flyndre and Cawdor field development approval supports Maersk Oil UK’s growth ambitions] | # [http://killajoules.wikidot.com/blog:5218 Flyndre and Cawdor field development approval supports Maersk Oil UK’s growth ambitions] | ||
| + | # [https://abarrelfull.blogspot.com/2023/10/repsol-reaches-agreement-with-talisman.html Repsol reaches an agreement with Talisman Energy to acquire the Canadian oil company] | ||
| + | # [https://abarrelfull.blogspot.com/2024/07/first-oil-from-flyndre-extends-clyde.html First Oil From Flyndre Extends Clyde Life] | ||
| + | |||
| + | [[category:Field]] | ||
| + | [[category:UK]] | ||
| + | [[category:Repsol]] | ||
Latest revision as of 06:43, 10 July 2024
Contents
Summary Information
- Operator: Repsol
- Country: UK
- Location: North Sea
- Production start:
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
Description
- The Clyde field, plus satellites Leven and Medwin, is located on block 30/17b
- It consists of a single large manned steel platform
- Gas from the Affleck Oil Field is transported to the Clyde Platform. From here it is sent to the Fulmar Oil and Gas Field
Flyndre & Cawdor
- The Flyndre field was discovered in 1974 and straddles the UK/Norway median line. Cawdor was discovered in 2008. The fields will be co-developed as a subsea tie-back to Clyde
- Flyndre was developed with a single production well. The Cawdor field was developed initially with a single production well, with potential development of two further wells
Contractors
- McDermott: Construction of Clyde Platform
- Heerema Marine Contractors: Platform Installation
- Proserv: Electro-hydraulic multiplex subsea control systems, along with its associated topside and subsea interface systems
- Global Maritime: Warranty surveyor for 16” piggy-backed, trenched infield pipeline - Clyde Q1-B Project
Flyndre & Cawdor
- Aker Solutions: EPCI contract – engineering, procurement, construction and installation
History
- 1982 - Field development approval granted
- 1992 - Leven development approved
- 1993 - Medwin development approved
- 1996 - BP sells the field to Talisman
- 2014 - Flyndre and Cawdor field development approval
- 2015 - Repsol became a partner by acquiring Talisman Sinopec
- 2017 - First oil from Flyndre field
Geology
Links
- UK Oil and Gas Fields by Approval Date
- List Of Oil Production Platforms In The UK
- List Of Oil and Gas Production Platforms In The UK
- FoundOcean Europe Subsea References
- Global Maritime Pipeline References
- Serimax Pipeline References
- BP Considers Sale of Interests in 'MAST' Oilfields
- BP's Beatrice, Buchan and Clyde Fields - Sale Completed
- Proserv seals double subsea contracts win
- Flyndre and Cawdor field development approval supports Maersk Oil UK’s growth ambitions
- Repsol reaches an agreement with Talisman Energy to acquire the Canadian oil company
- First Oil From Flyndre Extends Clyde Life