Difference between revisions of "Edradour Gas and Condensate Field"
		
		
		
		
		Jump to navigation
		Jump to search
		
Abarrelfull (talk | contribs)  | 
				Abarrelfull (talk | contribs)   | 
				||
| (One intermediate revision by the same user not shown) | |||
| Line 11: | Line 11: | ||
=== Description ===  | === Description ===  | ||
* The Edradour discovery is located in Block 206/4a, in approximately 300 meters of water, 75 kilometers northwest of the Shetlands.  | * The Edradour discovery is located in Block 206/4a, in approximately 300 meters of water, 75 kilometers northwest of the Shetlands.  | ||
| − | * The development plan consists of the conversion of the discovery well into a production well and a 16 kilometer production pipeline tied back to the main [[Laggan   | + | * The development plan consists of the conversion of the discovery well into a production well and a 16 kilometer production pipeline tied back to the main [[Laggan and Tormore Gas Fields | Laggan-Tormore]] flowline.    | 
* The Glenlivet field is being developed as part of the project  | * The Glenlivet field is being developed as part of the project  | ||
* Edradour is expected to start up in the fourth quarter of 2017 and will reach a plateau of 17,000 barrels of oil equivalent per day (boe/d) with an estimated development cost of 340 million GBP.  | * Edradour is expected to start up in the fourth quarter of 2017 and will reach a plateau of 17,000 barrels of oil equivalent per day (boe/d) with an estimated development cost of 340 million GBP.  | ||
=== Contractors ===  | === Contractors ===  | ||
| − | *   | + | * '''EPC Offshore:''' Project management services  | 
| − | *   | + | * '''Technip:'''   | 
** fabrication and installation of 12” production pipelines, 6” MEG(1) pipeline complete with 2" piggy backed service line,    | ** fabrication and installation of 12” production pipelines, 6” MEG(1) pipeline complete with 2" piggy backed service line,    | ||
** supply and installation of steel tube umbilical,  | ** supply and installation of steel tube umbilical,  | ||
| Line 23: | Line 23: | ||
** and rigid well tie-in spools, as well as the installation of templates and manifolds provided by the client,    | ** and rigid well tie-in spools, as well as the installation of templates and manifolds provided by the client,    | ||
** rock dumping and pre-commissioning.  | ** rock dumping and pre-commissioning.  | ||
| − | *   | + | * '''FMC Technologies:''' Subsea equipment including manifolds and associated connections and controls equipment, wellhead systems, subsea tie back connection equipment and a subsea production tree    | 
=== History ===  | === History ===  | ||
| Line 33: | Line 33: | ||
* 2017 - Ineos acquired a 20% stake from DONG  | * 2017 - Ineos acquired a 20% stake from DONG  | ||
* 2017 - Both fields start production  | * 2017 - Both fields start production  | ||
| + | * 2024 - Prax agrees to acquire Total's stake in the field  | ||
=== Geology ===  | === Geology ===  | ||
| Line 48: | Line 49: | ||
# [https://abarrelfull.blogspot.com/2021/03/total-starts-up-production-of-edradour.html Total Starts-Up Production Of The Edradour & Glenlivet Fields In The West Of Shetland]  | # [https://abarrelfull.blogspot.com/2021/03/total-starts-up-production-of-edradour.html Total Starts-Up Production Of The Edradour & Glenlivet Fields In The West Of Shetland]  | ||
# [https://abarrelfull.blogspot.com/2021/03/ineos-to-buy-entire-oil-gas-business.html INEOS to buy the entire Oil & Gas business from DONG Energy A/S for a headline price of $1.05 billion plus $250m contingent]  | # [https://abarrelfull.blogspot.com/2021/03/ineos-to-buy-entire-oil-gas-business.html INEOS to buy the entire Oil & Gas business from DONG Energy A/S for a headline price of $1.05 billion plus $250m contingent]  | ||
| + | # [https://a-barrel-full.blogspot.com/2024/07/the-prax-group-signs-agreement-to.html The Prax Group Signs An Agreement To Acquire TotalEnergies’ Upstream Assets In The West Of Shetland]  | ||
[[Category:Field]]  | [[Category:Field]]  | ||
[[Category:UK]]  | [[Category:UK]]  | ||
[[Category:Total]]  | [[Category:Total]]  | ||
Latest revision as of 14:06, 4 July 2024
Summary Information
- Operator: Total
 - Country: UK
 - Location: Block 206/4a, Atlantic, West of Shetland
 - Partners: Total - 80%, Ineos - (20%).
 - Production start: 2017 (Expected)
 - Type: Gas and Condensate
 - Estimated Reserves:
 - Production Volume:
 
Description
- The Edradour discovery is located in Block 206/4a, in approximately 300 meters of water, 75 kilometers northwest of the Shetlands.
 - The development plan consists of the conversion of the discovery well into a production well and a 16 kilometer production pipeline tied back to the main Laggan-Tormore flowline.
 - The Glenlivet field is being developed as part of the project
 - Edradour is expected to start up in the fourth quarter of 2017 and will reach a plateau of 17,000 barrels of oil equivalent per day (boe/d) with an estimated development cost of 340 million GBP.
 
Contractors
- EPC Offshore: Project management services
 - Technip:
- fabrication and installation of 12” production pipelines, 6” MEG(1) pipeline complete with 2" piggy backed service line,
 - supply and installation of steel tube umbilical,
 - fabrication and installation of pipeline end manifold, flowline end termination, flexible tails
 - and rigid well tie-in spools, as well as the installation of templates and manifolds provided by the client,
 - rock dumping and pre-commissioning.
 
 - FMC Technologies: Subsea equipment including manifolds and associated connections and controls equipment, wellhead systems, subsea tie back connection equipment and a subsea production tree
 
History
- 2011 - Edradour Gas and Condensate Field discovered
 - 2014 - Total announces the final investment decision
 - 2014 - Dong sells 5% to Total
 - 2015 - UK government approval granted
 - 2015 - Subsea contract awarded for Glenlivet
 - 2017 - Ineos acquired a 20% stake from DONG
 - 2017 - Both fields start production
 - 2024 - Prax agrees to acquire Total's stake in the field
 
Geology
- A Cretaceous reservoir
 
Links
- UK Oil and Gas Fields by Approval Date
 - Total: new gas and condensate discovery in the West of Shetland
 - EPC Offshore signs deal with Total on Edradour
 - UK: Total launches Edradour development and acquires a 60% interest in Glenlivet
 - Technip awarded large contract for the Edradour Subsea Development, West of Shetlands, UK
 - FMC Technologies Awarded Subsea Systems Contract for Total's Edradour and Glenlivet Fields
 - DONG Energy to divest 5% of West of Shetland Edradour field to Total - DONG Energy and Total to develop the Glenlivet and Edra
 - Technip awarded subsea contract for the Glenlivet project, West of Shetlands, UK
 - Total Starts-Up Production Of The Edradour & Glenlivet Fields In The West Of Shetland
 - INEOS to buy the entire Oil & Gas business from DONG Energy A/S for a headline price of $1.05 billion plus $250m contingent
 - The Prax Group Signs An Agreement To Acquire TotalEnergies’ Upstream Assets In The West Of Shetland