Difference between revisions of "Gryphon Oil Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
* Operator: Total | * Operator: Total | ||
* Country: UK | * Country: UK | ||
* Location: North Sea | * Location: North Sea | ||
− | * Production start: | + | * Production start: 1993 |
* Partners: | * Partners: | ||
* Type: Oil / Gas | * Type: Oil / Gas | ||
Line 9: | Line 9: | ||
* Production Volume: | * Production Volume: | ||
− | + | === Description === | |
− | |||
− | |||
− | |||
− | + | * The Gryphon field is in Quad 9 and is located approximately 201 miles north east of Aberdeen at a water depth of 112m. It is primarily in block 9/18b although a small portion extends into 9/18c. | |
− | * ** | + | * The field was discovered in 1987 with first production in October 1993. |
− | * | + | * Oil production peaked in 1995 ca. 50,000bbl/d. |
+ | * It is serviced by the [[Gryphon FPSO | Gryphon Alpha floating production, storage and offloading facility (FPSO)]] which also has subsea tiebacks from '''Tullich''', [[Maclure Oil Field]] and '''Ballindalloch''' developments. | ||
+ | * The oil is stored in cargo tanks in the hull and exported by tanker. | ||
+ | * Gas is exported via the Leadon pipeline to the Beryl Alpha platform, where it is transported to shore via the [[Scottish Area Gas Evacuation (SAGE) Pipeline]]. | ||
− | + | === Contractors === | |
+ | * '''Astano:''' Construction of FPSO hull | ||
+ | * '''McNulty Offshore:''' Construction of topsides | ||
+ | |||
+ | === History === | ||
+ | * 1987 - Gryphon filed discovered | ||
* 1992 - Field development planned approved | * 1992 - Field development planned approved | ||
+ | * 1993 - First oil produced | ||
* 2002 - Development consent given for Tullich | * 2002 - Development consent given for Tullich | ||
* 2002 - Maclure Oil Field started production | * 2002 - Maclure Oil Field started production | ||
Line 26: | Line 32: | ||
* 2013 - Production resumes following repairs to the FPSO | * 2013 - Production resumes following repairs to the FPSO | ||
* 2017 - Total acquires Maersk and becomes operator | * 2017 - Total acquires Maersk and becomes operator | ||
+ | * 2018 - Approval granted for Ballindalloch | ||
− | + | === Geology === | |
* | * | ||
− | + | === Links === | |
# [[UK Oil and Gas Fields by Approval Date]] | # [[UK Oil and Gas Fields by Approval Date]] | ||
# [[List Of Oil Production Platforms In The UK]] | # [[List Of Oil Production Platforms In The UK]] | ||
Line 38: | Line 45: | ||
# [http://killajoules.wikidot.com/archive:maersk-oil-uk-gryphon-fpso-back-in-production Maersk Oil UK Gryphon FPSO back in production] | # [http://killajoules.wikidot.com/archive:maersk-oil-uk-gryphon-fpso-back-in-production Maersk Oil UK Gryphon FPSO back in production] | ||
# [https://abarrelfull.blogspot.com/2022/09/total-acquires-maersk-oil-for-745.html Total acquires Maersk Oil for $7.45 billion in a share and debt transaction] | # [https://abarrelfull.blogspot.com/2022/09/total-acquires-maersk-oil-for-745.html Total acquires Maersk Oil for $7.45 billion in a share and debt transaction] | ||
+ | |||
+ | [[category:Field]] | ||
+ | [[category:UK]] | ||
+ | [[category:Total]] |
Latest revision as of 16:26, 30 June 2024
Summary Information
- Operator: Total
- Country: UK
- Location: North Sea
- Production start: 1993
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
Description
- The Gryphon field is in Quad 9 and is located approximately 201 miles north east of Aberdeen at a water depth of 112m. It is primarily in block 9/18b although a small portion extends into 9/18c.
- The field was discovered in 1987 with first production in October 1993.
- Oil production peaked in 1995 ca. 50,000bbl/d.
- It is serviced by the Gryphon Alpha floating production, storage and offloading facility (FPSO) which also has subsea tiebacks from Tullich, Maclure Oil Field and Ballindalloch developments.
- The oil is stored in cargo tanks in the hull and exported by tanker.
- Gas is exported via the Leadon pipeline to the Beryl Alpha platform, where it is transported to shore via the Scottish Area Gas Evacuation (SAGE) Pipeline.
Contractors
- Astano: Construction of FPSO hull
- McNulty Offshore: Construction of topsides
History
- 1987 - Gryphon filed discovered
- 1992 - Field development planned approved
- 1993 - First oil produced
- 2002 - Development consent given for Tullich
- 2002 - Maclure Oil Field started production
- 2005 - Maersk acquires the field from Kerr-McGee
- 2011 - Field temporarily shutdown after FPSO is damaged in storm
- 2013 - Production resumes following repairs to the FPSO
- 2017 - Total acquires Maersk and becomes operator
- 2018 - Approval granted for Ballindalloch
Geology
Links
- UK Oil and Gas Fields by Approval Date
- List Of Oil Production Platforms In The UK
- List Of Oil and Gas Production Platforms In The UK
- The A.P. Moller - Maersk Group acquires UK North Sea oil and gas interests
- Maersk Oil’s Gryphon FPSO to be docked for repairs
- Maersk Oil UK Gryphon FPSO back in production
- Total acquires Maersk Oil for $7.45 billion in a share and debt transaction