** The Alison field is located in block 49/11a | ** The Alison field is located in block 49/11a | ||
** The Alison installation is a protected manifold structure with capacity for 3 wells. | ** The Alison installation is a protected manifold structure with capacity for 3 wells. | ||
| + | ** The Annabel field is in Block 48/10a in the Southern North Sea, approximately 18km North of Audrey A (WD) | ||
| + | ** The Annabel installations comprise a ‘template’ structure with capacity for two wells, and two remote wellhead protection structures | ||
* Gas exported via the [[Lincolnshire Offshore Gas Gathering System (Loggs)]]. | * Gas exported via the [[Lincolnshire Offshore Gas Gathering System (Loggs)]]. | ||
=== Contractors === | === Contractors === | ||
| − | * | + | * '''Heerema Marine Contractors:''' Audrey platforms |
| − | * | + | * '''AMEC:''' Topsides detailed engineering, procurement and platform modifications to facilitate the Annabel subsea completion |
==== Ann Gas Field Development ==== | ==== Ann Gas Field Development ==== | ||
| − | * | + | * '''J P Kenny:''' Jack-up installed drilling template, manifold and protection structure |
=== History === | === History === | ||
| − | * 1966 - Ann field | + | * 1966 - Ann field discovered |
* 1987 - Field development approved | * 1987 - Field development approved | ||
* 1992 - Approval granted for Ann | * 1992 - Approval granted for Ann | ||
| Line 34: | Line 36: | ||
* 1995 - Alison approval granted | * 1995 - Alison approval granted | ||
* 1998 - Centrica acquires a stake from Powergen | * 1998 - Centrica acquires a stake from Powergen | ||
| + | * 2003 - Annabel field discovered | ||
| + | * 2005 - Annabel field begins production | ||
* 2012 - Production ceased at the Ann field | * 2012 - Production ceased at the Ann field | ||
| − | * 2018 - Approval granted for decommissioning | + | * 2017 - Spirit energy becomes the operator |
| + | * 2018 - Approval granted for decommissioning of Ann, Alison and Annabel | ||
=== Geology | === Geology | ||
| Line 48: | Line 53: | ||
# [http://killajoules.wikidot.com/archive:centrica-strikes-offshore-deal Centrica strikes offshore deal] | # [http://killajoules.wikidot.com/archive:centrica-strikes-offshore-deal Centrica strikes offshore deal] | ||
# [http://killajoules.wikidot.com/archive:amec-wins-north-sea-engineering-services-contract-fr AMEC Wins North Sea Engineering Services Contract from Venture Production] | # [http://killajoules.wikidot.com/archive:amec-wins-north-sea-engineering-services-contract-fr AMEC Wins North Sea Engineering Services Contract from Venture Production] | ||
| + | # [https://abarrelfull.blogspot.com/2023/08/spirit-energy-launched-following.html Spirit Energy launched following completion of Centrica and Bayerngas Norge E&P joint venture] | ||
| + | |||
| + | [[category:Field]] | ||
| + | [[category:UK]] | ||
| + | [[category:Spirit Energy]] | ||
Revision as of 15:57, 24 June 2024
Contents
Summary Information
- Operator: Centrica
- Country: UK
- Location: Southern North Sea
- Production start: 1998
- Partners:
- Type: Gas
- Estimated Reserves:
- Production Volume:
Description
- The field consists of two unmanned platforms, Audrey A & B
- Audrey acts as the main gas processing and export hub for **Ann**, **Audrey**, **Alison** and **Annabel**
- The Ann field is located in blocks 48/10a and 49/6a, approximately 40km North North-East of the Lincolnshire Offshore Gas Gathering System (LOGGS) complex.
- Ann combines a protected manifold structure with capacity for 3 wells and a remote wellhead
- The Alison field is located in block 49/11a
- The Alison installation is a protected manifold structure with capacity for 3 wells.
- The Annabel field is in Block 48/10a in the Southern North Sea, approximately 18km North of Audrey A (WD)
- The Annabel installations comprise a ‘template’ structure with capacity for two wells, and two remote wellhead protection structures
- Gas exported via the Lincolnshire Offshore Gas Gathering System (Loggs).
Contractors
- Heerema Marine Contractors: Audrey platforms
- AMEC: Topsides detailed engineering, procurement and platform modifications to facilitate the Annabel subsea completion
Ann Gas Field Development
- J P Kenny: Jack-up installed drilling template, manifold and protection structure
History
- 1966 - Ann field discovered
- 1987 - Field development approved
- 1992 - Approval granted for Ann
- 1994 - Ann field begins production
- 1995 - Alison approval granted
- 1998 - Centrica acquires a stake from Powergen
- 2003 - Annabel field discovered
- 2005 - Annabel field begins production
- 2012 - Production ceased at the Ann field
- 2017 - Spirit energy becomes the operator
- 2018 - Approval granted for decommissioning of Ann, Alison and Annabel
=== Geology
Links
- UK Oil and Gas Fields by Approval Date
- List Of Oil and Gas Production Platforms In The UK
- UK Oil and Gas Field Approved Decommissioning Programmes
- FoundOcean Subsea References
- J P Kenny Subsea References
- Centrica strikes offshore deal
- AMEC Wins North Sea Engineering Services Contract from Venture Production
- Spirit Energy launched following completion of Centrica and Bayerngas Norge E&P joint venture