Difference between revisions of "Audrey Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Centrica * Country: UK * Location: Southern North Sea * Production start: 1998 * Partners: * Type: Gas * Estimated Reserves: * Production Vo...") |
Abarrelfull (talk | contribs) |
||
| Line 12: | Line 12: | ||
* The field consists of two unmanned platforms, Audrey A & B | * The field consists of two unmanned platforms, Audrey A & B | ||
* Audrey acts as the main gas processing and export hub for **Ann**, **Audrey**, **Alison** and **Annabel** | * Audrey acts as the main gas processing and export hub for **Ann**, **Audrey**, **Alison** and **Annabel** | ||
| − | * Gas exported via the | + | ** The Ann field is located in blocks 48/10a and 49/6a, approximately 40km North North-East of the Lincolnshire Offshore Gas Gathering System (LOGGS) complex. |
| + | ** Ann combines a protected manifold structure with capacity for 3 wells and a remote wellhead | ||
| + | ** The Alison field is located in block 49/11a | ||
| + | ** The Alison installation is a protected manifold structure with capacity for 3 wells. | ||
| + | * Gas exported via the [[Lincolnshire Offshore Gas Gathering System (Loggs)]]. | ||
+++ Contractors | +++ Contractors | ||
| Line 24: | Line 28: | ||
+++ History | +++ History | ||
| + | * 1966 - Ann field developed | ||
* 1987 - Field development approved | * 1987 - Field development approved | ||
* 1992 - Approval granted for Ann | * 1992 - Approval granted for Ann | ||
| + | * 1994 - Ann field begins production | ||
* 1995 - Alison approval granted | * 1995 - Alison approval granted | ||
* 1998 - Centrica acquires a stake from Powergen | * 1998 - Centrica acquires a stake from Powergen | ||
Revision as of 15:50, 24 June 2024
Summary Information
- Operator: Centrica
- Country: UK
- Location: Southern North Sea
- Production start: 1998
- Partners:
- Type: Gas
- Estimated Reserves:
- Production Volume:
+++ Description
- The field consists of two unmanned platforms, Audrey A & B
- Audrey acts as the main gas processing and export hub for **Ann**, **Audrey**, **Alison** and **Annabel**
- The Ann field is located in blocks 48/10a and 49/6a, approximately 40km North North-East of the Lincolnshire Offshore Gas Gathering System (LOGGS) complex.
- Ann combines a protected manifold structure with capacity for 3 wells and a remote wellhead
- The Alison field is located in block 49/11a
- The Alison installation is a protected manifold structure with capacity for 3 wells.
- Gas exported via the Lincolnshire Offshore Gas Gathering System (Loggs).
+++ Contractors
- **Heerema Marine Contractors:** Audrey platforms
- **AMEC:** Topsides detailed engineering, procurement and platform modifications to facilitate the Annabel subsea completion
++++ Ann Gas Field Development
- **J P Kenny:** Jack-up installed drilling template, manifold and protection structure
+++ History
- 1966 - Ann field developed
- 1987 - Field development approved
- 1992 - Approval granted for Ann
- 1994 - Ann field begins production
- 1995 - Alison approval granted
- 1998 - Centrica acquires a stake from Powergen
+++ Geology
+++ Links